roofy

406 East 96 Street

Brooklyn, NY 11212BBL 3-04670-0067Map

Owner of record: Ashman, Christopher

406 East 96 Street is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 4 residential units across 2 floors. The owner of record is Ashman, Christopher. HPD has recorded 229 housing violations here, most recently on July 16, 2026. 10 of the 50 most recent violations are still open.

HPD violations
229
DOB violations
3
ECB violations
2
HPD complaints
246

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 16, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 229

  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall

    Jul 16, 2026

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    Jul 16, 2026

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the 4th room from north at east located at apt 2r, 2nd story, 1st apartment from east at south

    Sep 19, 2025 · Apt 2R

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 4th room from north at east located at apt 2r, 2nd story, 1st apartment from east at south

    Sep 19, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Sep 19, 2025 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Sep 19, 2025 · Apt 2R

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st wall cabinet from north at east wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south

    Sep 19, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective binding door and door frame at vestiblule to public hall , 1st story

    Sep 19, 2025

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the foyer , the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south

    Sep 19, 2025 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Open — Lead docs submitted, not acceptable
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Open — Invalid certification
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchenette located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Open — Invalid certification
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall in the 4th room from north at east located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Open — Invalid certification
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall, south wall, west wall in the 1st room from north at west located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Open — Invalid certification
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame in the foyer located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Open — Invalid certification
  • A

    Paint with light colored paint to the satisfaction of this department , 1st radiator from east at south wall in the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 3rd room from north at west located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective repair hinges on door in the entrance located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective light switch at east wall in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective porcelain enamel reglaze bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south

    Jul 21, 2025 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Nov 6, 2024 · Apt 2F

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from east at north located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the 3rd room from east at north located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall in the foyer located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • B

    Replace the broken or defective cracked wash basin in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the foyer located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from east at north located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling, south wall and east wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective countertop (on south wall) at sink in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and north wall at public hall, 1st story

    Nov 1, 2024

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch set and door knob assembly at 1st door from north at east in the 3rd room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Replace with new the missing escutcheon plate at top and bottom of the 1st steam riser from west at north in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Open — Certification postponment denied
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from east at north located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, south wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, south wall and east wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Nov 1, 2024 · Apt 1R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Jan 23, 2024 · Apt 1R

    Closed — Violation dismissed

DOB building violations · 3

  • Boiler boiler optional

    B-boiler boiler optional

    Nov 22, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2011

    Dob violation - dismissed

ECB violations · 2

  • Class - 1

    B154,3b,15,50a,b,c,d,e,f,g,h,i,51,36. 50a- flue pipe not sealed to chimney haz. 50b- boiler burner excessive smoke haz. 50c- remove louva from boiler room wall. 50d- boiler room not a storage room. 50e- flue

    Aug 17, 2011

    Resolve
  • Class - 1

    B101,50a,b. 50a- no work permit filed w/dob for the replacement boiler. 50b- work w/o a permit 28-105.1.

    Aug 17, 2011

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Sep 12, 2026 · Apt 2R

    Open
  • Plumbing

    Water supply

    Sep 12, 2026 · Apt 2R

    Open
  • Plumbing

    Bathtub/shower

    Sep 12, 2026 · Apt 2R

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Jan 27, 2026 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2026 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Sep 15, 2025 · Apt 2R

    Close
  • Electric

    No lighting

    Jul 22, 2025 · Apt 2F

    Close
  • Safety

    Fire escape

    Jul 22, 2025 · Apt 2F

    Close
  • Electric

    Outlet/switch

    Jul 22, 2025 · Apt 2F

    Close
  • Electric

    Wiring

    Jul 22, 2025 · Apt 2F

    Close
Show 40 more ↓
  • Electric

    Power outage

    Jul 20, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Nov 2, 2024 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Oct 27, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2024 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jan 19, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jan 8, 2024 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2024 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Dec 23, 2023 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2023 · Apt 2R

    Close
  • Electric

    Outlet/switch

    Dec 2, 2023 · Apt 2F

    Close
  • Safety

    Carbon monoxide detector

    Dec 2, 2023 · Apt 2F

    Close
  • Safety

    Smoke detector

    Dec 2, 2023 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2023 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2023 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2023 · Apt 2F

    Close
  • Electric

    Outlet/switch

    Nov 17, 2023 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Nov 17, 2023 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2023 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Oct 25, 2023 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Jun 23, 2023 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Jun 21, 2023 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Jun 21, 2023 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Jun 21, 2023 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Jun 20, 2023 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Jun 20, 2023 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Apr 29, 2023 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Jan 9, 2023 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2022 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Dec 10, 2022 · Apt 2F

    Close
  • Plumbing

    Radiator

    Dec 10, 2022 · Apt 2F

    Close
  • Plumbing

    Bathtub/shower

    Aug 19, 2022 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Aug 19, 2022 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Aug 19, 2022 · Apt 2F

    Close
  • Flooring/stairs

    Floor

    Aug 19, 2022 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Aug 19, 2022 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Aug 19, 2022 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Jun 25, 2021 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Jun 25, 2021 · Apt 2R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1930
Floors
2
Residential units
4
Building area
3,198 ft²
Lot area
3,160 ft²
Zoning
R6
Community board
317
Council district
41
Block / lot
4670 / 67
Assessed value
$252,000
Landmark / historic district
No

HPD registration #302208, last renewed Jul 31, 2026.

Questions about 406 East 96 Street

Who owns 406 East 96 Street?

The owner of record in NYC Department of City Planning PLUTO data is Ashman, Christopher.

Does 406 East 96 Street have violations?

Yes. NYC HPD has recorded 229 housing violations at this property.

Is 406 East 96 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 406 East 96 Street built?

City records list 1930 as the year it was built.

How many apartments are in 406 East 96 Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.