roofy

1098 Lenox Road

Brooklyn, NY 11212BBL 3-04670-0039Map

Owner of record: 1098 Lenox Rd LLC

1098 Lenox Road is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 4 residential units across 2 floors. The owner of record is 1098 Lenox Rd LLC. HPD has recorded 63 housing violations here, most recently on May 5, 2026. 27 of the 50 most recent violations are still open.

HPD violations
63
DOB violations
0
ECB violations
0
HPD complaints
37

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 63

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at ,vestibule door, west wall at public hall, 1st story

    Jan 23, 2026

    Open — Nov certified late
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from north at east wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, ceiling, picture moulding at south wall, south wall, east wall, west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, north wall, south wall, east wall, 1st window frame from west at north wall in the 4th room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — First no access to re- inspect violation
  • C

    Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — Nov certified late
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the kitchen located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — Invalid certification
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the kitchen located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 4th room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — Nov certified late
  • B

    Properly secure the loose aluminum saddle at, entrance door , east wall. in the 4th room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — Invalid certification
  • A

    Properly repair or replace the broken or defective air valve at , radiator , north wall, in the 4th room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ... in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective gasket at refrigerator door in the kitchen located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — Invalid certification
  • B

    Properly secure the loose wash basin at west wall in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of free standing radiator at, north wall at public hall, 1st story

    Jan 23, 2026

    Open — Nov certified late
  • A

    Paint with light colored paint to the satisfaction of this department at south wall, north wall, east wall, ceiling, 1st window frame from west at north wall in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — Invalid certification
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the 4th room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the private hallway located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — First no access to re- inspect violation
  • C

    M/d law abate the nuisance consisting of extremely hot water exceeding the allowable temperature of 130 digress fahrenheit and found to be at 132 degrees fahrenheit at all fixtures in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — Nov certified late
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, north wall, south wall, east wall, 1st window frame from west at north wall in the kitchen located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from south at west wall in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — First no access to re- inspect violation
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — Invalid certification
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Jan 23, 2026 · Apt 1F

    Open — Invalid certification
  • B

    Remove the illegal fastening padlock and chain at , exit gate , building front yard

    Jan 23, 2026

    Open — Invalid certification
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 19, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 10, 2025

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from south at west

    Nov 26, 2024 · Apt 1F

    Open — Invalid certification
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling less than 10sq.ft in the bathroom located at apt 1f, 1st story, 1st apartment from south at west

    Nov 26, 2024 · Apt 1F

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 1st apartment from south at west

    Nov 26, 2024 · Apt 1F

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1f, 1st story, 1st apartment from south at west

    Nov 26, 2024 · Apt 1F

    Open — Nov certified late
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2024

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from south at west

    Nov 26, 2024 · Apt 1F

    Open — Nov certified late
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling less than 10sq.ft in the bathroom located at apt 1f, 1st story, 1st apartment from south at west original violation 17454343 issued 26-nov-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Nov 26, 2024 · Apt 1F

    Open — First no access to re- inspect violation
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 10, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 23, 2023

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 25, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 25, 2022

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Pests

    Jul 14, 2026 · Apt 1F

    Close
  • Water leak

    Slow leak

    Jan 18, 2026 · Apt 1F

    Close
  • Water leak

    Heavy flow

    Nov 26, 2024 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Nov 26, 2024 · Apt 1F

    Close
  • Plumbing

    Basin/sink

    Sep 23, 2024 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    May 9, 2022 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Jan 13, 2014 · Apt 2F

    Close
  • General

    Floor

    Jan 13, 2014 · Apt 2F

    Close
  • General

    Floor

    Jan 13, 2014 · Apt 2F

    Close
  • Nonconst

    Vermin

    Jan 13, 2014 · Apt 2F

    Close
Show 27 more ↓
  • Nonconst

    Vermin

    Jan 13, 2014 · Apt 2F

    Close
  • Nonconst

    Smoke detector

    Jan 13, 2014 · Apt 2F

    Close
  • Nonconst

    Carbon monoxide

    Jan 13, 2014 · Apt 2F

    Close
  • General

    Mold

    Jan 13, 2014 · Apt 2F

    Close
  • General

    Mold

    Jan 13, 2014 · Apt 2F

    Close
  • General

    Mold

    Jan 13, 2014 · Apt 2F

    Close
  • General

    Mold

    Jan 13, 2014 · Apt 2F

    Close
  • General

    Mold

    Jan 13, 2014 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Jul 5, 2005 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Jul 4, 2005 · Apt 2R

    Close
  • Plumbing

    Water-leaks

    Jul 4, 2005 · Apt 2R

    Close
  • General

    Mold

    Jul 4, 2005 · Apt 2R

    Close
  • Electric

    Electric-supply

    Jul 4, 2005 · Apt 2R

    Close
  • General

    Floor

    Jul 4, 2005 · Apt 2R

    Close
  • General

    Mold

    Jul 4, 2005 · Apt 2R

    Close
  • Electric

    Wiring

    Jun 23, 2005 · Apt 2R

    Close
  • Nonconst

    Vermin

    Mar 24, 2005 · Apt 2R

    Close
  • Nonconst

    Vermin

    Mar 24, 2005 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Mar 24, 2005 · Apt 2R

    Close
  • General

    Cabinet

    Mar 24, 2005 · Apt 2R

    Close
  • General

    Mold

    Mar 24, 2005 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Feb 23, 2005 · Apt 2R

    Close
  • Nonconst

    Vermin

    Feb 23, 2005 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Feb 23, 2005 · Apt 2R

    Close
  • General

    Cabinet

    Feb 23, 2005 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Feb 23, 2005 · Apt 2R

    Close
  • General

    Floor

    Feb 23, 2005 · Apt 2R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1930
Floors
2
Residential units
4
Building area
3,198 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
317
Council district
41
Block / lot
4670 / 39
Assessed value
$252,000
Landmark / historic district
No

HPD registration #307832, last renewed Jan 30, 2026.

Questions about 1098 Lenox Road

Who owns 1098 Lenox Road?

The owner of record in NYC Department of City Planning PLUTO data is 1098 Lenox Rd LLC.

Does 1098 Lenox Road have violations?

Yes. NYC HPD has recorded 63 housing violations at this property.

Is 1098 Lenox Road rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1098 Lenox Road built?

City records list 1930 as the year it was built.

How many apartments are in 1098 Lenox Road?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.