249 East 52 Street
Brooklyn, NY 11203BBL 3-04658-0049Map
Owner of record: Hossain, Mohammed Alamgir
249 East 52 Street is a two-family home built in 1935 in Brooklyn, 11203. It has 2 residential units across 2 floors. The owner of record is Hossain, Mohammed Alamgir. HPD has recorded 66 housing violations here, most recently on April 15, 2024. 39 of the 50 most recent violations are still open.
- HPD violations
- 66
- DOB violations
- 2
- ECB violations
- 17
- HPD complaints
- 79
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 66
- BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east at south located at apt 2, 2nd story
Apr 15, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and east wall in the 1st room from east at south located at apt 2, 2nd story
Apr 15, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door security door at building entrance , 1st story
May 1, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 1, 2018
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story
Aug 1, 2018 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1, 1st story
Aug 1, 2018 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling 8 sq ft in the bathroom located at apt 1, 1st story
Aug 1, 2018 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1, 1st story
Aug 1, 2018 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective connection under sink in the kitchen located at apt 1, 1st story
Aug 1, 2018 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective pilot light at gas range in the kitchen located at apt 1, 1st story
Aug 1, 2018 · Apt 1
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the broken or defective wall light fixture at west wall in the bathroom located at apt 1, 1st story
Aug 1, 2018 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1, 1st story
Aug 1, 2018 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls & ceiling in the entire apartment located at apt 1, 1st story
Aug 1, 2018 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 18, 2017
Open — Info nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story
Dec 16, 2017 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story
Apr 24, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north at west located at apt 1, 1st story
Apr 24, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the bathroom located at apt 1, 1st story
Apr 24, 2017 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective celotex tiles at ceiling in the 4th room from east located at apt 1, 1st story
Apr 24, 2017 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north at west located at apt 1, 1st story
Apr 24, 2017 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective celotex tiles at ceiling in the 1st room from east located at apt 1, 1st story
Apr 24, 2017 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1, 1st story
Jun 25, 2015 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story
Jun 18, 2015 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Jun 18, 2015 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit door in the entrance located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Properly secure the loose door hinges at entrance door in the 1st room from east at south located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Properly secure the loose door hinges at door leading to balcony in the 5th room from east located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Properly secure the loose door hinges at entrance door in the 5th room from east located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 4th room from east located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color around window in the 1st room from east at south located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak around window in the 1st room from east at south located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures at gas range located at apt 1, 1st story
Jun 11, 2015 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Jun 11, 2015 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the kitchen located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective closet doors in the 1st room from east at south located at apt 2fl, 2nd story
Jun 11, 2015 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water in the entire apartment located at apt 1, 1st story
May 21, 2015 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 1, 1st story
May 21, 2015 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story
May 21, 2015 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective lower sash glass at window in the kitchen located at apt 1, 1st story
May 21, 2015 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective upper sash glass at window in the 4th room from east located at apt 1, 1st story
May 21, 2015 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1, 1st story
May 21, 2015 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at bath tub in the bathroom located at apt 1, 1st story
May 21, 2015 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 3rd room from east located at apt 1, 1st story
May 21, 2015 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 5th room from east located at apt 1, 1st story
May 21, 2015 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, apartment at south
Jun 18, 2014 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall at east wall in the bathroom located at apt 2, 2nd story, apartment at south
Aug 6, 2009 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color wall behind stove in the kitchen located at apt 2, 2nd story, apartment at south
Aug 6, 2009 · Apt 2
Closed — Violation closed
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 16, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 16, 2015
Dob violation - dismissed
ECB violations · 17
- Class - 1
Failure to comply w/the comm's order contained in summons/vio#35154663k issued on 09/23/15 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file
Oct 30, 2017 · Penalty $6,000
Resolve - Class - 1
Work w/o a permit. failure to comply w/the comm's order contained in summons/vio#35154663k issued on 09/23/15 & to file a c of c pursuant to28-201.1 & 1rcny 102-01. note: water,waste,electrica & gas lines creat
Sep 20, 2017 · Penalty $12,000
Resolve - Class - 1
Work w/o a permit. failure to comply w/the comm's order contained in summons/vio#35154663k issued on 09/23/15 & to file a c of c pursuant to28-201.1 & 1rcny 102-01. note: unauthorized gas,electric & water lines
Aug 4, 2017 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/ the comm's order contained in summons/vio#35154663k issued on 9/23/15 to file a cert of correction pursuant to 28-201.1 1rcny 102-01 for work w/o a permit.rem comply w/ comm's order to file
Jun 25, 2017 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation# 35154663k issued on 9/23/15 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/out a permit. rem: comply w/ commissi
Apr 1, 2017 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov #35154663k issued on 09/23/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. note: no document filed for work w/o a permit at basement leve
Jul 21, 2016 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov #35154663k issued on 09/23/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. work w/o permit. created sro's in basement. remedy: comply wit
Jun 11, 2016 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in nov#35154663k issued on 09/23/15 & to file a c of c pursuant to 28-201.1, 28-204.4 7 1rcny 102-01. work w/out permit. created class 'a' apt in basement
Apr 29, 2016 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov #35154663k issued on 09/23/15 & to file a cert of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01.note:no doc file for work w/out a permit @cellar l
Mar 12, 2016 · Penalty $6,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35154662z issued on 9/23/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Jan 21, 2016 · Penalty $4,000
Resolve
Show 7 more ↓
- Class - 1
Failure to comply w/ the comm's order contained in nov#35154663k issued on 9/23/15 & to file a cert of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01.work w/o a permit.created class a apt in cellar.rem
Jan 21, 2016 · Penalty $12,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov# 35154662z issued on 09/23/15 & to file a cert of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01.for cellar occupancy contrary to the c of o.rem:co
Dec 11, 2015 · Penalty $2,000
Resolve - Class - 1
Failure to comply with the commissioner's order contained in nov #35154663k issued on 9/23/15 and to file a certificate of correction pursuant to 28-201.1,28-204.4 and 1rcny 102-01.at cellar altered plumbing,el
Dec 11, 2015 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov# 35154663k issued on 09/23/15 & to file a cert of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01.work w/out a permit.erected 3 sro's,unauthorized k
Oct 31, 2015 · Penalty $6,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35154662z issued on 9/23/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. occupancy contrary to c of o or dob records cellar occupied as
Oct 31, 2015 · Penalty $2,000
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o #32228 which indicatea 2 family dwelling on 1st & 2nd fls;no occupancy @the cellar w/a shared kitchen & 3 sro's @the cellar w/a shared kitchen & bath substandard
Sep 23, 2015 · Penalty $6,000
Resolve - Class - 1
Work w/out a permit:home owner illegally erected full height partitions to enclose three sro's a 3 pcs bath, a kitchen w/an unauthorized gas line, electric & water lines,no prior permits on dob records.rem:obta
Sep 23, 2015 · Penalty $4,000
Resolve
Complaints
- Plumbing
Basin/sink
May 30, 2019 · Apt 2
Close - Door/window
Window pane
May 30, 2019 · Apt 2
Close - Door/window
Window pane
May 30, 2019 · Apt 2
Close - Plumbing
Water supply
May 30, 2019 · Apt 2
Close - General
Mailbox
May 30, 2019 · Apt BLDG
Close - Outside building
Skylight
May 30, 2019 · Apt BLDG
Close - Plumbing
Basin/sink
May 30, 2019 · Apt 2
Close - Door/window
Door
May 29, 2019 · Apt 2FL
Close - Door/window
Window pane
May 29, 2019 · Apt 2FL
Close - Door/window
Window pane
May 29, 2019 · Apt 2FL
Close
Show 40 more ↓
- Door/window
Window pane
May 29, 2019 · Apt 2FL
Close - Plumbing
Water supply
May 29, 2019 · Apt 2FL
Close - Plumbing
Basin/sink
Jul 29, 2018 · Apt 1
Close - Plumbing
Bathtub/shower
Jul 29, 2018 · Apt 1
Close - Appliance
Electric/gas range
Jul 29, 2018 · Apt 1
Close - Electric
No lighting
Jul 29, 2018 · Apt 1
Close - Paint/plaster
Ceiling
Jul 29, 2018 · Apt 1
Close - Flooring/stairs
Floor
Jul 29, 2018 · Apt 1
Close - Paint/plaster
Ceiling
Jul 29, 2018 · Apt 1
Close - Heat/hot water
Entire building
Dec 14, 2017 · Apt 1
Close - Water leak
Heavy flow
Apr 24, 2017 · Apt 1
Close - Water leak
Heavy flow
Apr 24, 2017 · Apt 1
Close - Heat/hot water
Apartment only
Dec 3, 2015 · Apt 1
Close - Heat/hot water
Entire building
Oct 17, 2015 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Aug 21, 2015 · Apt CC
Close - Electric
Wiring
Aug 21, 2015 · Apt CC
Close - Unsanitary condition
Mold
Aug 21, 2015 · Apt CC
Close - Appliance
Electric/gas range
Jun 25, 2015 · Apt 1
Close - Heat/hot water
Entire building
Jun 15, 2015 · Apt 1
Close - Heat/hot water
Apartment only
Jun 9, 2015 · Apt 1
Close - Flooring/stairs
Floor
Jun 9, 2015 · Apt 2FL
Close - Water leak
Slow leak
Jun 9, 2015 · Apt 2FL
Close - Safety
Window guard broken/missing
Jun 9, 2015 · Apt 2FL
Close - Door/window
Door
Jun 9, 2015 · Apt 2FL
Close - Door/window
Window frame
Jun 9, 2015 · Apt 2FL
Close - Plumbing
Water supply
Jun 9, 2015 · Apt 2FL
Close - Flooring/stairs
Stairs
Jun 9, 2015 · Apt 2FL
Close - Door/window
Door
Jun 9, 2015 · Apt 2FL
Close - Flooring/stairs
Floor
Jun 9, 2015 · Apt 2FL
Close - Appliance
Electric/gas range
Jun 9, 2015 · Apt 2FL
Close - Unsanitary condition
Pests
Jun 9, 2015 · Apt 2FL
Close - Paint/plaster
Wall
Jun 9, 2015 · Apt 2FL
Close - Plumbing
Water supply
Jun 9, 2015 · Apt 2FL
Close - Plumbing
Bathtub/shower
May 20, 2015 · Apt 1
Close - Water leak
Damp spot
May 20, 2015 · Apt 1
Close - Water leak
Slow leak
May 20, 2015 · Apt 1
Close - Plumbing
Water supply
May 20, 2015 · Apt 1
Close - Flooring/stairs
Floor
May 20, 2015 · Apt 1
Close - Door/window
Window frame
May 20, 2015 · Apt 1
Close - Door/window
Window pane
May 20, 2015 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1935
- Floors
- 2
- Residential units
- 2
- Building area
- 4,080 ft²
- Lot area
- 2,850 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4658 / 49
- Assessed value
- $102,600
- Landmark / historic district
- No
Questions about 249 East 52 Street
Who owns 249 East 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is Hossain, Mohammed Alamgir.
Does 249 East 52 Street have violations?
Yes. NYC HPD has recorded 66 housing violations at this property.
Is 249 East 52 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 249 East 52 Street built?
City records list 1935 as the year it was built.
How many apartments are in 249 East 52 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.