roofy

Lenox Road

Brooklyn, NY 11203BBL 3-04657-0011Map

Owner of record: 1251 Pacific St LLC

Lenox Road is a walk-up apartment building built in 2022 in Brooklyn, 11203. It has 9 residential units across 5 floors. The owner of record is 1251 Pacific St LLC. HPD has recorded 5 housing violations here, most recently on May 11, 2026. 1 of the 5 most recent violations are still open.

HPD violations
5
DOB violations
0
ECB violations
12
HPD complaints
15

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 5

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 11, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective individual heating units at south wall in the 2nd room from north at east located at apt 2a, 2nd story, 1st apartment from north at east

    Dec 19, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective indivudal heating unit at south wall in the 1st room from north at east located at apt 2a, 2nd story, 1st apartment from north at east

    Dec 19, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Jan 24, 2025 · Apt 3A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system individual heating system at boiler room

    Jan 24, 2025

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 12

  • Class - 2

    Precautions while working around powerlines: at time of inspection observed pipe scaffolds erected, less than 10ft from the high voltage powerline. it's a hazardous condition if conductive material handled on t

    May 6, 2023

    Resolve
  • Class - 2

    Work without a permit at time of inspection at an active construction jobsite,i observed approximately 6 workers conducting construction activities on 1st and 2nd floor.upon reviewing bis i further observed the

    Jun 2, 2022 · Penalty $625

    Resolve
  • Class - 1

    Bc 3309.1 failure to protect or adequately protect adjoining properties during construction or demolition operation.at time of inspection atan active construction jobsite,i observed served framing on second flo

    Jun 2, 2022

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications at time of inspection at an active construction jobsite,i observed contractor failedto extend sidewalk shed at exposure#4 to 5ft or to code specification.

    Jun 2, 2022

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner: at time of inspection, observed construction materials debris, pieces of wood with nails sticking out, bags of brick and plywood illegally stored at front

    Apr 25, 2022

    Resolve
  • Class - 2

    Bc 3307.4.3 yodock barriers not maintained at the time of inspection on inactive proposed 4 story nb site,i observed yodock barriers in the roadway in front of site at exposure#1.the yodocks are not filled,conn

    Feb 11, 2022

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.at the time ofinspection on inactive proposed 4 story nb site,i observed a sidewalk shed installed at exposure#1 and an existing garage at exposure#4.the

    Feb 11, 2022 · Penalty $625

    Resolve
  • Class - 2

    Project info panel and sidewalk shed parapet panel not provided.at time of inspection on a 4 story nb jobsite i observed a construction fence installed with no project info panel installed and a sidewalk shed i

    Feb 3, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to obtain temporary construction permit prior to installation use of temporary construction equipment.note:at time of inspection of 4 story new building at first floor level observed sidewalk shed in pl

    Jan 6, 2022

    Resolve
  • Class - 1

    Work w/o permit.note:at time of inspection of 4 story new building at first floor level observed super structure framing phase at first floor.search in bis revealed no permit issued or applied for.failure to ob

    Jan 6, 2022

    Resolve
Show 2 more ↓
  • Class - 1

    Work without a permit.at the time of inspection observed foundation work in progress in conjunction with nb#b00508605 which is still on planexaminer review.stop all work.rem:obtain valid permit for n.b.

    Nov 20, 2021

    Resolve
  • Class - 2

    Jobsite fence non constructed or maintained pursuant to subsection.(missing fence at exp#4/hole in adjoining property).at time of inspectionobserved jobsite closed.missing fence at exp#4 and holes larger than 1

    Nov 20, 2021

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Dec 17, 2025 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2025 · Apt 1E

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2025 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2025 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2025 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2025 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2025 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2025 · Apt 3A

    Close
  • General

    Bell/buzzer/intercom

    Jan 3, 2025 · Apt 3A

    Close
  • General

    Bell/buzzer/intercom

    Jan 3, 2025 · Apt 3A

    Close
Show 5 more ↓
  • General

    Bell/buzzer/intercom

    Jan 1, 2025 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Dec 30, 2024 · Apt 3A

    Close
  • General

    Bell/buzzer/intercom

    Dec 30, 2024 · Apt 3A

    Close
  • General

    Bell/buzzer/intercom

    Dec 30, 2024 · Apt 3A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 3, 2024 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
2022
Floors
5
Residential units
9
Building area
5,523 ft²
Lot area
2,000 ft²
Zoning
R6
Community board
317
Council district
41
Block / lot
4657 / 11
Assessed value
$543,150
Landmark / historic district
No

HPD registration #391128, last renewed Aug 13, 2025.

Questions about Lenox Road

Who owns Lenox Road?

The owner of record in NYC Department of City Planning PLUTO data is 1251 Pacific St LLC.

Does Lenox Road have violations?

Yes. NYC HPD has recorded 5 housing violations at this property.

Is Lenox Road rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was Lenox Road built?

City records list 2022 as the year it was built.

How many apartments are in Lenox Road?

It has 9 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.