322 East 93 Street
Brooklyn, NY 11212BBL 3-04647-0025Map
Owner of record: Baptiste, Gabriel
322 East 93 Street is a walk-up apartment building built in 1931 in Brooklyn, 11212. It has 4 residential units across 2 floors. The owner of record is Baptiste, Gabriel. HPD has recorded 65 housing violations here, most recently on May 4, 2026. 34 of the 50 most recent violations are still open.
- HPD violations
- 65
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 25
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window counter balance, lower sashes at 1st and 2nd windows from east at south in the 2nd room from east located at apt 1f, 1st story, 1st apartment from south at west
Jun 4, 2023 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... 10 square feet at ceiling, 10 square feet south wall, 10 square feet east wall in the bathroom located at apt 1f, 1st story, 1st apartment from south at west
Jun 4, 2023 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles cut hazard in the bathroom located at apt 1f, 1st story, 1st apartment from south at west
Jun 4, 2023 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles cut hazard in the foyer located at apt 1f, 1st story, 1st apartment from south at west
Jun 4, 2023 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1f, 1st story, 1st apartment from south at west
Jun 4, 2023 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at south wall in the 2nd room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall, 1st door frame from south at west wall in the 2nd room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall wall, 2nd window frame from north at east wall, 1st door frame from south at west wall, 1st window frame from north at east wall, 1st closet from south at west wall door frame in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st closet from west at north wall door frame, ceiling, 1st closet from west at north wall door in the foyer located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective upper window sash inner glass pane 2nd window from north at east in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the foyer located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 2nd room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 16, 2023 · Apt 1F
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 24, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 8, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 30, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 17, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 20, 2015
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Jun 25, 2012 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Jul 30, 2008 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from east at south wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Jul 30, 2008 · Apt 1R
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 1st room from east, the kitchen located at apt 1r, 1st story, 1st apartment from south at west
Jul 30, 2008 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st closet from south at west wall door, 2nd closet from south at west wall door frame in the private hallway located at apt 1r, 1st story, 1st apartment from south at west
Jul 30, 2008 · Apt 1R
Open — Invalid certification
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Class - 2
Residence converted from a legal 4 family to 5 family by creating class a apt at cellar level. dob records indicates residence as a 4 family and now converted and occupied as a 5 family by creating class a apt
Dec 28, 2021 · Penalty $2,500
Active - Class - 2
Work without a permit. noted at cellar level erected full height partition wall for rooms and bathroom. installed water and waste lines for 3 pc bathroom (sink, toilet, and shower) and residential sink. install
Dec 28, 2021 · Penalty $6,250
Active
Complaints
- Paint/plaster
Window/frame
Jul 12, 2023 · Apt 1F
Close - Unsanitary condition
Mold
Jun 2, 2023 · Apt 1F
Close - Flooring/stairs
Floor
Jun 2, 2023 · Apt 1F
Close - Paint/plaster
Ceiling
Jun 2, 2023 · Apt 1F
Close - Door/window
Window frame
Jun 2, 2023 · Apt 1F
Close - Paint/plaster
Ceiling
Apr 13, 2023 · Apt 1F
Close - Unsanitary condition
Mold
Apr 13, 2023 · Apt 1F
Close - Door/window
Window frame
Apr 13, 2023 · Apt 1F
Close - Unsanitary condition
Sewage
Apr 13, 2023 · Apt 1F
Close - Heat/hot water
Entire building
Aug 14, 2019 · Apt BLDG
Close
Show 15 more ↓
- Electric
Wiring
Jun 14, 2012 · Apt 1F
Close - Paint/plaster
Ceiling
Jul 20, 2008 · Apt 1R
Close - Paint/plaster
Ceiling
Jul 20, 2008 · Apt 1R
Close - Paint/plaster
Wall
Jul 20, 2008 · Apt 1R
Close - Paint/plaster
Wall
Jul 20, 2008 · Apt 1R
Close - Plumbing
Water-leaks
Jul 20, 2008 · Apt 1R
Close - Nonconst
Vermin
Jul 20, 2008 · Apt 1R
Close - Nonconst
Vermin
Apr 17, 2007 · Apt 1R
Close - Plumbing
Toilet
Apr 17, 2007 · Apt 1R
Close - Electric
Electric-supply
Apr 17, 2007 · Apt 1R
Close - Heating
Heat related
Jan 24, 2004 · Apt 1R
Close - Paint/plaster
Ceiling
Aug 4, 2003 · Apt 1R
Close - Plumbing
Water-leaks
Aug 4, 2003 · Apt 1R
Close - Paint/plaster
Ceiling
Aug 4, 2003 · Apt 1R
Close - General
Mold
Aug 4, 2003 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1931
- Floors
- 2
- Residential units
- 4
- Building area
- 3,280 ft²
- Lot area
- 2,675 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4647 / 25
- Assessed value
- $196,650
- Landmark / historic district
- No
HPD registration #301986, last renewed Nov 24, 2025.
Questions about 322 East 93 Street
Who owns 322 East 93 Street?
The owner of record in NYC Department of City Planning PLUTO data is Baptiste, Gabriel.
Does 322 East 93 Street have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 322 East 93 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 322 East 93 Street built?
City records list 1931 as the year it was built.
How many apartments are in 322 East 93 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.