346 East 92 Street
Brooklyn, NY 11212BBL 3-04646-0035Map
Owner of record: Elva Carr
346 East 92 Street is a walk-up apartment building built in 1920 in Brooklyn, 11212. It has 3 residential units across 2 floors. The owner of record is Elva Carr. HPD has recorded 91 housing violations here, most recently on May 4, 2026. 40 of the 50 most recent violations are still open.
- HPD violations
- 91
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 59
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 91
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from east at north located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the 5th room from east at north located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from east at north located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective the 3 , 4 and 5th wood door at base cabinet at sink from south at west wall in the kitchen located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wall cabinet 4th wood door from north at east wall in the kitchen located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from east at south located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at all hot water fixtures in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the 5th room from east at south located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 2nd room from east located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the bathroom located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the kitchen located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the foyer located at apt 1, 1st story, 2nd apartment from south at west
Apr 15, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at 1st story leading to cellar at boiler room
Jan 14, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west
Jan 14, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from east at north located at apt 1, 1st story, 2nd apartment from south at west
Jan 14, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1, 1st story, 2nd apartment from south at west
Jan 14, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the private hallway located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st room from north located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd room from north located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st door frame from south at west wall, south wall in the 3rd room from north at east located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the 3rd room from north at east located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door frame from west at north wall in the 5th room from north at east located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st door frame from west at north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 5th room from north at west located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the private hallway located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall in the 1st room from north located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at baseboard at east wall in the 2nd room from north located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from north at east wall in the bathroom located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north at west located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures no volume in the entire apartment located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from north located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from north at east located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the 5th room from north at east located at apt 2, 1st story, 2nd apartment from east at south
Jan 6, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 6, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 3rd apartment from south at west
Jan 3, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 3rd apartment from south at west
Jan 3, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1, 1st story, 3rd apartment from south at west
Jan 3, 2026 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east at north located at apt 4, 1st story, 1st apartment from south at west
Apr 2, 2025 · Apt 4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th bathroom from east at north located at apt 4, 1st story, 1st apartment from south at west
Apr 2, 2025 · Apt 4
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4, 1st story, 1st apartment from south at west
Apr 2, 2025 · Apt 4
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Hazardous
Failre to provide at least 2 means of egress from room or space where provided:noted:the basement at premises is occupied as a dwelling under certificate of occupancy (c of o) #161510.at time of inspection,all
Feb 9, 2005 · Penalty $2,500
Active
Complaints
- Heat/hot water
Apartment only
Apr 14, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Apr 14, 2026 · Apt 1
Close - Paint/plaster
Wall
Apr 14, 2026 · Apt 1
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BASEME
Close - Heat/hot water
Apartment only
Jan 12, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 1
Close - Door/window
Door frame
Jan 4, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Dec 31, 2025 · Apt 1
Close - Electric
Outlet/switch
Oct 22, 2025 · Apt BASEME
Close - Electric
No lighting
Oct 22, 2025 · Apt BASEME
Close
Show 40 more ↓
- Plumbing
Toilet
Oct 22, 2025 · Apt BASEME
Close - Heat/hot water
Apartment only
Oct 22, 2025 · Apt BASEME
Close - Heat/hot water
Apartment only
Jan 6, 2025 · Apt 1STFLO
Close - Water leak
Slow leak
Jan 3, 2025 · Apt 4
Close - Paint/plaster
Ceiling
Jan 3, 2025 · Apt 4
Close - Heat/hot water
Apartment only
Dec 22, 2024 · Apt 1
Close - Electric
Power outage
Dec 22, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Dec 21, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Dec 15, 2024 · Apt 2ND
Close - Heat/hot water
Apartment only
Dec 14, 2024 · Apt 1STFLO
Close - Electric
No lighting
Nov 19, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Nov 19, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Nov 18, 2023 · Apt 1
Close - Electric
Power outage
Nov 18, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Feb 15, 2022 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Jan 17, 2022 · Apt TOPFLO
Close - Heating
Heat related
Dec 30, 2010 · Apt 1FL
Close - Heating
Heat related
Nov 9, 2010 · Apt 2
Close - Electric
Electric-supply
Nov 9, 2010 · Apt 2
Close - Electric
Electric-supply
Oct 8, 2010 · Apt 2
Close - Electric
Electric-supply
Oct 8, 2010 · Apt 2
Close - Electric
Electric-supply
Oct 8, 2010 · Apt 2
Close - Electric
Electric-supply
Jul 26, 2010 · Apt 1FL
Close - Plumbing
Toilet
Apr 23, 2010 · Apt 2
Close - Plumbing
Toilet
Apr 23, 2010 · Apt 2
Close - Electric
Wiring
Feb 11, 2010 · Apt 1FL
Close - Heating
Heat related
Feb 11, 2010 · Apt 1FL
Close - Heating
Heat related
Feb 3, 2010 · Apt 2
Close - Heating
Heat related
Mar 10, 2005 · Apt 1FL
Close - Heating
Heat related
Mar 2, 2005 · Apt 1FL
Close - Heating
Heat related
Feb 24, 2005 · Apt 1FL
Close - Plumbing
Toilet
Feb 24, 2005 · Apt 1FL
Close - Electric
Electric-supply
Jan 24, 2005 · Apt 1FL
Close - Heating
Heat related
Jan 24, 2005 · Apt BASRE
Close - Electric
Electric-supply
Jan 24, 2005 · Apt BASRE
Close - Heating
Heat related
Jan 23, 2005 · Apt 1FL
Close - Electric
Electric-supply
Jan 23, 2005 · Apt 1FL
Close - Heating
Heat related
Jan 23, 2005 · Apt BASRE
Close - Heating
Heat related
Jan 21, 2005 · Apt 1FL
Close - Plumbing
Water supply
Dec 12, 2004 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 2
- Residential units
- 3
- Building area
- 2,560 ft²
- Lot area
- 2,550 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4646 / 35
- Assessed value
- $56,100
- Landmark / historic district
- No
HPD registration #359507, last renewed Jan 12, 2015.
Questions about 346 East 92 Street
Who owns 346 East 92 Street?
The owner of record in NYC Department of City Planning PLUTO data is Elva Carr.
Does 346 East 92 Street have violations?
Yes. NYC HPD has recorded 91 housing violations at this property.
Is 346 East 92 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 346 East 92 Street built?
City records list 1920 as the year it was built.
How many apartments are in 346 East 92 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.