roofy

280 East 91 Street

Brooklyn, NY 11212BBL 3-04645-0006Map

Owner of record: Bronx Brooklyn Housing Development Fund Corporatio

280 East 91 Street is a walk-up apartment building built in 1920 in Brooklyn, 11212. It has 31 residential units across 4 floors. The owner of record is Bronx Brooklyn Housing Development Fund Corporatio. HPD has recorded 358 housing violations here, most recently on March 26, 2026. 25 of the 50 most recent violations are still open.

HPD violations
358
DOB violations
38
ECB violations
12
HPD complaints
424

What to know

Concern
11 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 26, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 358

  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 2f, 2nd story, 1st apartment from south at west

    Mar 26, 2026 · Apt 2F

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft window recess in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Mar 26, 2026 · Apt 2F

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft window recess in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west original violation 18741947 issued 26-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Mar 26, 2026 · Apt 2F

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Mar 26, 2026 · Apt 2F

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Mar 26, 2026 · Apt 2F

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Mar 26, 2026 · Apt 2F

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from south at west

    Mar 26, 2026 · Apt 2F

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling in the 1st room from east located at apt 2f, 2nd story, 1st apartment from south at west

    Mar 26, 2026 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at south wall and all walls in the bathroom located at apt 1f, 1st story, 1st apartment from north at east

    Feb 17, 2026 · Apt 1F

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of water inside dome at light fixture at ceiling in the kitchen located at apt 1f, 1st story, 1st apartment from north at east

    Feb 17, 2026 · Apt 1F

    Open — Nov sent out
Show 40 more ↓
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at center located at apt 1f, 1st story, 1st apartment from north at east

    Feb 17, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 1f, 1st story, 1st apartment from north at east

    Feb 17, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and south wall in the kitchen located at apt 1f, 1st story, 1st apartment from north at east original violation 18651274 issued 17-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Feb 17, 2026 · Apt 1F

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and south wall in the kitchen located at apt 1f, 1st story, 1st apartment from north at east

    Feb 17, 2026 · Apt 1F

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 1f, 1st story, 1st apartment from north at east

    Feb 17, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 1f, 1st story, 1st apartment from north at east

    Feb 17, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from west at north

    Jan 29, 2026 · Apt 2F

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north

    Jan 29, 2026 · Apt 2F

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system locked door at celler at boiler room

    Jan 29, 2026

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north

    Jan 29, 2026 · Apt 2F

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north

    Jan 29, 2026 · Apt 2F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north

    Jan 29, 2026 · Apt 2F

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north

    Jan 29, 2026 · Apt 2F

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from west at north

    Jan 29, 2026 · Apt 2F

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north

    Jan 29, 2026 · Apt 2F

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of hopper door compactor closet taped shut at west at public hall, 2nd story

    Nov 26, 2025

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north

    Nov 26, 2025 · Apt 2F

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 19, 2025

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west , section ''south''

    Jul 18, 2025 · Apt 1C

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 1c, 1st story, 1st apartment from south at west , section ''south''

    Jul 18, 2025 · Apt 1C

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1c, 1st story, 1st apartment from south at west , section ''south''

    Jul 18, 2025 · Apt 1C

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate 2nd window from north in the 3rd room from east located at apt 1c, 1st story, 1st apartment from south at west , section ''south''

    Jul 18, 2025 · Apt 1C

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the foyer located at apt 1c, 1st story, 1st apartment from south at west , section ''south''

    Jul 18, 2025 · Apt 1C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west , section ''south''

    Jul 18, 2025 · Apt 1C

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd stack from south, at east at fire escape, 3rd story

    Jun 27, 2025

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of stove with doors attached at public hall, 1st story, section ''north''

    Jun 27, 2025

    Open — Invalid certification
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 9, 2025

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective counter balance at lower sash window at fire escape at north wall in the kitchen located at apt 3g, 3rd story, 1st apartment from west at north

    Apr 21, 2025 · Apt 3G

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3g, 3rd story, 1st apartment from north at east

    Feb 14, 2025 · Apt 3G

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 1st room from north at east, the kitchen located at apt 3g, 3rd story, 1st apartment from north at east

    Feb 14, 2025 · Apt 3G

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in the waste line in the bathroom located at apt 3g, 3rd story, 1st apartment from north at east

    Feb 14, 2025 · Apt 3G

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3g, 3rd story, 1st apartment from north at east

    Feb 14, 2025 · Apt 3G

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective spring balance at lower sash window at north wall first window from west in the 1st room from north at east located at apt 3g, 3rd story, 1st apartment from north at east

    Feb 14, 2025 · Apt 3G

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective spring balance at lower sash window at north wall in the kitchen located at apt 3g, 3rd story, 1st apartment from north at east

    Feb 14, 2025 · Apt 3G

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective hinges at vestibule door, 1st story , 1st story

    Jan 18, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story

    Jan 18, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling near sky light, section # b. at public hall, 4th story

    Sep 27, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling near sky light, section #b at public hall, 4th story

    Sep 27, 2024

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north

    Aug 28, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet leak from flushometer in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north

    Aug 28, 2024 · Apt 2F

    Closed — Violation closed

DOB building violations · 38

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 3, 2017

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - active
Show 28 more ↓
  • Elevator elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspectio n

    Sep 15, 2017

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    Vio issued to elevator-fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    Vio issued to elevator-fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 1, 2016

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspectio n

    Dec 13, 2011

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    Violation issued to elevator-failure to file category 1 2009 inspectio n

    Oct 8, 2010

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Vcat1-elevator annual inspection / test elevatorrequired

    Oct 8, 2010

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2009 inspection report

    Dec 31, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    Violation issued to elevator-failure to file category 1 2006 inspectio n

    Apr 2, 2007

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - active
  • Elevator elevatorrequired

    Violation issued to elevator-failure to file category 1 2005 inspectio n

    Oct 1, 2005

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Oct 1, 2005

    Dob violation - active
  • Boilers boiler required

    Violation issued for failure to file annual boiler 2002 inspection report

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 12, 1992

    Vp*-violation unserved ecb- dismissed

ECB violations · 12

  • Class - 1

    Class 2: 2.x.10 phone inoperative repair & program to 24 hr emergency operator. 2.x.10 alarm bell inoperative repair & tie into emergency stop switch. 15.m.7 certificate frame missing. provide fram & inspection

    Jan 3, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    In car phone not working. walking pit door not self locking or closing. maintenance log not being filled out no entry for 2022. machine room extremely hot. no mechanical outside ventilation for the machine room

    Oct 25, 2022 · Penalty $625

    Resolve
  • Class - 2

    Provide designated lobby braille tags. replace worn gibs where needed. provide readily available keys in order to perform inspection of machine room

    Apr 14, 2021 · Penalty $312

    Resolve
  • Class - 2

    Boiler room sump pump is defective; submit the certificate of correction

    Apr 2, 2019 · Penalty $312

    Resolve
  • Class - 1

    5x17,6x10,2r7,32l10,15m7,61r7,68m7. 5x-repair door zone restrictor and call dob for reinspecftion. 6x-repair door stop on door operator. 2r-provide current elevator company phone #for phone in the car; 32l

    Jan 10, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    8v1,16e1,17h11,29j1,28l10,67l10-8v1)car floor to landing sill not level, adjust. 16e1)hoistway door rubbing, adjust. 17h11)hoistway door gibs worn, replace. 29j1)door operator misaligned, adjust. 28l10)door han

    Feb 5, 2018 · Penalty $500

    Resolve
  • Class - 2

    40c7. provide access to elevator m.r.

    Nov 1, 2017

    Resolve
  • Class - 2

    2x10,41w10,70o2,99bb5. (2x)outside comm inoperative,repair. (41w)machine room door need lock,provide. (70o)pit dirty,clean. (99bb)1 year tag expired perform a file test.

    Oct 30, 2017 · Penalty $250

    Resolve
  • Class - 1

    07m07,67b10,29q03,39b07. 07m07-car door zone restrictor missing provide; 67b10-communication insufficient repair in car phone; 29q03-door operator unguarded install guard; 39b07-car top light insufficient pro

    Jul 22, 2016 · Penalty $2,500

    Resolve
  • Class - 1

    *05m07,*38m07; 100m07,17h11,17d06,18m07,32h11,67l10,68m07,40m07,40b07,69b11,29q03. *class one items: 05m-according to dept records, zone lock restrictor is required for the device; 39m-insp box stop switch*

    May 24, 2016 · Penalty $2,500

    Resolve
Show 2 more ↓
  • Class - 2

    100m07,17h11,17d05,14j01,08v01,21q03,10j01,77r11,05m07,40#07,70#07,97x10. 100m-in case of fire signage, 17h,d-where needed; 14j-adjust for proper view of cab; 08v-adjust floor stops; 21q-covers missing; 10j-

    Apr 11, 2016 · Penalty $1,250

    Resolve
  • Class - 1

    97-x-10/42-g-11/42-d-06/64-m-07/100-m-07/81-m-07/69-m-07/41-t-07/48-u-15/48-o-02/97-

    Dec 6, 2010 · Penalty $1,000

    Resolve

Complaints

  • General

    Bell/buzzer/intercom

    Jul 17, 2026 · Apt 4B

    Close
  • Appliance

    Electric/gas range

    Jul 17, 2026 · Apt 4B

    Close
  • General

    Cabinet

    Jul 17, 2026 · Apt 4B

    Close
  • Paint/plaster

    Wall

    Jul 17, 2026 · Apt 4B

    Close
  • Flooring/stairs

    Floor

    Jul 17, 2026 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Mar 25, 2026 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Mar 24, 2026 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Mar 11, 2026 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Feb 4, 2026 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Jan 29, 2026 · Apt 1F

    Close
  • Electric

    Lighting

    Jan 29, 2026 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Jan 29, 2026 · Apt 1F

    Close
  • Electric

    No lighting

    Jan 29, 2026 · Apt 1F

    Close
  • Water leak

    Heavy flow

    Jan 29, 2026 · Apt 1F

    Close
  • Water leak

    Heavy flow

    Jan 28, 2026 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Jan 28, 2026 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Jan 28, 2026 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2026 · Apt 3E

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2025 · Apt 4B

    Close
  • Plumbing

    Toilet

    Nov 26, 2025 · Apt 2F

    Close
  • Door/window

    Window frame

    Nov 6, 2025 · Apt 2F

    Close
  • Water leak

    Heavy flow

    Oct 24, 2025 · Apt 2F

    Close
  • Plumbing

    Toilet

    Oct 23, 2025 · Apt 2F

    Close
  • Water leak

    Slow leak

    Oct 19, 2025 · Apt 2F

    Close
  • Door/window

    Window frame

    Jul 10, 2025 · Apt 1C

    Close
  • Flooring/stairs

    Floor

    Jul 10, 2025 · Apt 1C

    Close
  • Door/window

    Door

    Jul 10, 2025 · Apt 1C

    Close
  • Flooring/stairs

    Floor

    Jul 10, 2025 · Apt 1C

    Close
  • Water leak

    Slow leak

    Jun 24, 2025 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Jun 24, 2025 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Feb 5, 2025 · Apt 3G

    Close
  • Plumbing

    Toilet

    Feb 5, 2025 · Apt 3G

    Close
  • Paint/plaster

    Wall

    Feb 5, 2025 · Apt 3G

    Close
  • Unsanitary condition

    Pests

    Feb 5, 2025 · Apt 3G

    Close
  • Paint/plaster

    Wall

    Feb 5, 2025 · Apt 3G

    Close
  • Plumbing

    Toilet

    Jan 26, 2025 · Apt 2F

    Close
  • Door/window

    Window frame

    Jan 26, 2025 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Jan 4, 2025 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2024 · Apt 4A

    Close
  • Flooring/stairs

    Floor

    Dec 26, 2024 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Dec 13, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 7, 2024 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Sep 24, 2024 · Apt 4E

    Close
  • Door/window

    Door

    Sep 24, 2024 · Apt 4E

    Close
  • Plumbing

    Toilet

    Aug 3, 2024 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Aug 3, 2024 · Apt 2F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1920
Floors
4
Residential units
31
Building area
30,556 ft²
Lot area
10,000 ft²
Zoning
R6
Community board
317
Council district
41
Block / lot
4645 / 6
Assessed value
$1,924,650
Landmark / historic district
No

HPD registration #383914, last renewed Dec 24, 2025.

Questions about 280 East 91 Street

Who owns 280 East 91 Street?

The owner of record in NYC Department of City Planning PLUTO data is Bronx Brooklyn Housing Development Fund Corporatio.

Does 280 East 91 Street have violations?

Yes. NYC HPD has recorded 358 housing violations at this property.

Is 280 East 91 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 280 East 91 Street built?

City records list 1920 as the year it was built.

How many apartments are in 280 East 91 Street?

It has 31 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.