244 East 94 Street
Brooklyn, NY 11212BBL 3-04629-0026Map
Owner of record: 244 East 94th LLC
244 East 94 Street is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 4 residential units across 2 floors. The owner of record is 244 East 94th LLC. HPD has recorded 131 housing violations here, most recently on May 4, 2026. 43 of the 50 most recent violations are still open.
- HPD violations
- 131
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 96
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 131
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from south at west wall door in the foyer located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the 1st room from north located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass at the lower sash at the 2nd window from east at south in the 4th room from north at east located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass at the lower sash window in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceed the maximum allowable temperature of 130 f ( 133 f found) in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the foyer located at apt 2r, 2nd story, 1st apartment from east at south
Feb 2, 2024 · Apt 2R
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls , buildind's vestibule at public hall, 1st story
Nov 27, 2022
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials plaster at ceiling and west wall at public hall, 2nd story
Nov 27, 2022
Open — Nov sent out - BHazardous
Replace with new the broken or defective bowed steel lintel with missing and deteriorated mortar at joints , 2nd window from east , building front , 2nd story
Nov 27, 2022
Open — Nov sent out - BHazardous
Replace with new the missing guardrail at stairs at building front , 1st story
Nov 27, 2022
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials plaster at ceiling and all walls , buildind's vestibule at public hall, 1st story
Nov 27, 2022
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , east wall, at public hall, 1st story
Nov 27, 2022
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges , at stairwell door leading to basement at public hall, 1st story
Nov 27, 2022
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of the storage of wood door and frame and construction material at intermediate landing to roof bulkhead at public hall stairs, 2nd story
Nov 27, 2022
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective connection at waste pipe atsink in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective base cabinet at wash basin in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in bathtub waste line in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the smoke detector inoprative in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass at lower sash window, 2nd from east at south wall in the 4th room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass at lower sash window , 2nd from east at south, in the 4th room from north at east located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass at lower sash window to east wall in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked masonry stairs , entrance to building, at front , 1st story
Nov 27, 2022
Open — Nov sent out - CImmediately hazardous
Replace with new the missing wood cap at newel posts at public hall stairs, 2nd story
Nov 27, 2022
Open — Nov sent out - ANon-hazardous
Properly secure the loose electric outlet at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective gaskets at refrigerator doors in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures, (132f found) in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Nov 27, 2022 · Apt 2R
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2022
Closed — Violation dismissed - ANon-hazardous
Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations. at public hall, 1st story
Jun 10, 2022
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall, south wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 2f, 2nd story, 1st apartment from north at east
Mar 31, 2022 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Mar 31, 2022 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east located at apt 2f, 2nd story, 1st apartment from north at east
Mar 31, 2022 · Apt 2F
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Garbage/recycling storage
Feb 9, 2024 · Apt BLDG
Close - Plumbing
Water supply
Feb 9, 2024 · Apt 1F
Close - Flooring/stairs
Floor
Feb 9, 2024 · Apt 1F
Close - Safety
Carbon monoxide detector
Feb 9, 2024 · Apt 1F
Close - Safety
Smoke detector
Feb 9, 2024 · Apt 1F
Close - Door/window
Door
Feb 9, 2024 · Apt 1F
Close - Paint/plaster
Ceiling
Feb 9, 2024 · Apt 1F
Close - Door/window
Door
Feb 9, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Feb 9, 2024 · Apt BLDG
Close - Electric
Lighting
Feb 9, 2024 · Apt BLDG
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Feb 9, 2024 · Apt BLDG
Close - Flooring/stairs
Floor
Feb 9, 2024 · Apt BLDG
Close - Door/window
Door
Feb 9, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Feb 9, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 1, 2024 · Apt 2R
Close - Plumbing
Water supply
Feb 1, 2024 · Apt 2R
Close - Door/window
Window pane
Feb 1, 2024 · Apt 2R
Close - Paint/plaster
Wall
Feb 1, 2024 · Apt 2R
Close - Safety
Window guard broken/missing
Feb 1, 2024 · Apt 2R
Close - Safety
Carbon monoxide detector
Feb 1, 2024 · Apt 2R
Close - Safety
Smoke detector
Feb 1, 2024 · Apt 2R
Close - Unsanitary condition
Pests
Feb 1, 2024 · Apt 2R
Close - Door/window
Door
Feb 1, 2024 · Apt 2R
Close - Water leak
Heavy flow
Nov 3, 2022 · Apt 2R
Close - Appliance
Electric/gas range
Sep 4, 2022 · Apt 2F
Close - General
Cooking gas
Apr 22, 2022 · Apt 2F
Close - Unsanitary condition
Mold
Apr 22, 2022 · Apt 2F
Close - Paint/plaster
Wall
Mar 24, 2022 · Apt 2F
Close - Unsanitary condition
Mold
Mar 24, 2022 · Apt 2F
Close - General
Mailbox
Mar 24, 2022 · Apt 2F
Close - Door/window
Door
Mar 24, 2022 · Apt 2F
Close - Plumbing
Bathtub/shower
Mar 3, 2022 · Apt 2F
Close - Electric
No lighting
Mar 3, 2022 · Apt 2F
Close - Unsanitary condition
Mold
Mar 3, 2022 · Apt 2F
Close - Plumbing
Water supply
Feb 17, 2022 · Apt 2F
Close - Heat/hot water
Entire building
Feb 9, 2022 · Apt 2F
Close - Unsanitary condition
Mold
Nov 11, 2021 · Apt 2F
Close - Flooring/stairs
Floor
Oct 29, 2021 · Apt 2F
Close - Electric
No lighting
Oct 29, 2021 · Apt 2F
Close - Plumbing
Bathtub/shower
Oct 29, 2021 · Apt 2F
Close - Unsanitary condition
Mold
Oct 29, 2021 · Apt 2F
Close - Plumbing
Radiator
Oct 29, 2021 · Apt 2F
Close - Heat/hot water
Apartment only
Oct 29, 2021 · Apt 2F
Close - Unsanitary condition
Mold
Sep 3, 2020 · Apt 1F
Close - Heat/hot water
Apartment only
Nov 9, 2019 · Apt 1F
Close - Unsanitary condition
Mold
Dec 8, 2018 · Apt 2F
Close - Heat/hot water
Apartment only
Apr 18, 2018 · Apt 1F
Close - Heat/hot water
Apartment only
Apr 5, 2018 · Apt 1F
Close - Heat/hot water
Entire building
Dec 28, 2017 · Apt 2F
Close - Heat/hot water
Entire building
Feb 11, 2017 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1930
- Floors
- 2
- Residential units
- 4
- Building area
- 3,600 ft²
- Lot area
- 2,700 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4629 / 26
- Assessed value
- $216,000
- Landmark / historic district
- No
HPD registration #352469, last renewed Jun 30, 2026.
Questions about 244 East 94 Street
Who owns 244 East 94 Street?
The owner of record in NYC Department of City Planning PLUTO data is 244 East 94th LLC.
Does 244 East 94 Street have violations?
Yes. NYC HPD has recorded 131 housing violations at this property.
Is 244 East 94 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 244 East 94 Street built?
City records list 1930 as the year it was built.
How many apartments are in 244 East 94 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.