roofy

1042 Winthrop Street

Brooklyn, NY 11212BBL 3-04628-0010Map

Owner of record: Mitchell, Wayne

1042 Winthrop Street is a mixed residential and retail building built in 1920 in Brooklyn, 11212. It has 5 residential units across 3 floors. The owner of record is Mitchell, Wayne. HPD has recorded 93 housing violations here, most recently on May 6, 2026. 2 of the 50 most recent violations are still open.

HPD violations
93
DOB violations
6
ECB violations
11
HPD complaints
75

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 6, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 93

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 6, 2026

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of scalding hotwater exceeding 130 degrees in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Feb 4, 2026 · Apt 3

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Dec 31, 2025

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees at all hot water fixtures in the entire apartment located at apt 4, 3rd story, 1st apartment from south at west

    Dec 31, 2025 · Apt 4

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Dec 31, 2025 · Apt 1

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1, 1st story, 1st apartment from north at east

    Dec 31, 2025 · Apt 1

    Closed — Violation closed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at vestible door at public hall, 1st story

    Dec 31, 2025

    Open — Not complied with
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4, 3rd story, 1st apartment from south at west

    Dec 31, 2025 · Apt 4

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 1, 1st story, 1st apartment from north at east

    Dec 31, 2025 · Apt 1

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Dec 31, 2025 · Apt 1

    Closed — Violation closed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door

    Dec 31, 2025

    Open — Not complied with
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 19, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 11, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 12, 2024

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Dec 22, 2023 · Apt 1

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 1, 1st story, 1st apartment from east at south

    Dec 22, 2023 · Apt 1

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 1, 1st story, 1st apartment from east at south

    Dec 22, 2023 · Apt 1

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 3rd story

    Oct 20, 2023

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 2nd story

    Oct 20, 2023

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 1st story

    Oct 20, 2023

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retarded plaster at ceiling at public hall, 3rd story

    Oct 20, 2023

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of house hold items at public hall, 3rd story

    Oct 20, 2023

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective locking device at front entrance door to building , 1st story

    May 14, 2023

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 27, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 2, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 2, 2022

    Closed — Violation dismissed
  • B

    Remove the illegal fastening consisting of double cylinder key operated lock installed on front gate leading to building entrance

    Dec 17, 2021

    Closed — Violation closed
  • B

    Remove the illegal fastening consisting of key operated double cylinder lock installed at metal gate at front yard

    Sep 8, 2021

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling and north wall in the bathroom located at apt 5, 3rd story, 1st apartment from east at south

    Sep 8, 2021 · Apt 5

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from east at south

    Sep 8, 2021 · Apt 5

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south

    Sep 8, 2021 · Apt 5

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south

    Sep 8, 2021 · Apt 5

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story

    Aug 27, 2021

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story

    Aug 27, 2021

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling at public hall, 3rd story

    Aug 27, 2021

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling at public hall, 2nd story

    Aug 27, 2021

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department north wall at public hall, 1st story

    Aug 27, 2021

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 1st story

    Aug 27, 2021

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at north wall at public hall, 1st story

    Aug 27, 2021

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Aug 27, 2021

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story

    Aug 27, 2021

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 2nd story

    Aug 27, 2021

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 13, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 13, 2021

    Closed — Violation dismissed
  • B

    Replace with new the missing intercom system from building entrance to foyer located at apt 3, 2nd story, 1st apartment from east at south

    Jan 6, 2021 · Apt 3

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story

    Jan 6, 2021

    Closed — Violation closed
  • B

    Properly repair the broken or defective light fixture at ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from east at south

    Jan 6, 2021 · Apt 3

    Closed — Violation closed
  • B

    Properly repair the broken or defective light fixture at ceiling located at apt 3, 2nd story, 1st apartment from east at south

    Jan 6, 2021 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north and east walls in the bathroom located at apt 3, 2nd story, 1st apartment from east at south

    Jan 6, 2021 · Apt 3

    Closed — Violation closed

DOB building violations · 6

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 18, 2017

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active

ECB violations · 11

  • Class - 2

    Fresh air louver is defective-spill switch is defective-sewer cap is not in place-the hwh flue is back pitched; correct violations + submit the certificate of correction

    Nov 14, 2019 · Penalty $625

    Active
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation #35407871h issued on 03/28/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to provide uno

    May 23, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. noted;at time of inspection found exit passageway where drop ladder for fire escape,used asa storage area for steel plant stand and other household items. pathwa

    Mar 28, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Work w/o permit. noted;at time of inspection found workers installing new door w/ new steel lintel for main entrance of 2nd fl dwelling units. bricks removed at 2 doorways&2 windows removed w/ newly installed b

    Mar 28, 2019

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35005763l issued on 07/18/2017 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no permit or applicati

    Dec 22, 2017 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in summons/violation #3005763l issued on 7/18/17 and to file a certificate of correction pursuant to 28-201.1 and rcny 102-01.no permit or application

    Nov 24, 2017 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35005763l issued on 07/18/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit 1st fl. remedy: comply w/comm's order &/or file

    Nov 13, 2017 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35005763l issued on 07/18/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file

    Oct 13, 2017 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35005763l issued on 07/18/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a pemit. exp#2 of the bldg at 1st fl store front was

    Aug 30, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Work w/o a permit.@time of insp it was observed that const ops was ongoing @exp 2 of the bldg @1st fl.the storefront was being replaced & there was no permit on file for such work.observed masonry work with sec

    Jul 18, 2017 · Penalty $8,000

    Resolve
Show 1 more ↓
  • Class - 2

    Altered changed bldg occupied w/o a valid cert of occupancy as per 28-118.3.1-28-118.3.2 note bldg has an alteration type i permit #301219820 and is occupied throughout prior to final sign off rem: obtain valid

    Oct 29, 2009 · Penalty $500

    Active

Complaints

  • Heat/hot water

    Apartment only

    Feb 8, 2026 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Feb 4, 2026 · Apt 4

    Close
  • Plumbing

    Water supply

    Feb 4, 2026 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2026 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2026 · Apt 3RDFLO

    Close
  • Heat/hot water

    Apartment only

    Jan 13, 2026 · Apt 3RDFLO

    Close
  • Heat/hot water

    Apartment only

    Dec 30, 2025 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Nov 2, 2025 · Apt 4

    Close
  • Door/window

    Window frame

    Jan 6, 2025 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2023 · Apt BLDG

    Close
Show 40 more ↓
  • Door/window

    Door

    Dec 30, 2022 · Apt LOBBY

    Close
  • Water leak

    Slow leak

    Dec 30, 2022 · Apt 5

    Close
  • Paint/plaster

    Wall

    Dec 30, 2022 · Apt 5

    Close
  • Heat/hot water

    Apartment only

    Dec 30, 2022 · Apt 5

    Close
  • Door/window

    Door

    Dec 30, 2022 · Apt 5

    Close
  • Unsanitary condition

    Pests

    Dec 30, 2022 · Apt 5

    Close
  • Flooring/stairs

    Floor

    Dec 30, 2022 · Apt 5

    Close
  • Electric

    Outlet/switch

    Aug 30, 2022 · Apt 5

    Close
  • Plumbing

    Toilet

    Aug 30, 2022 · Apt 5

    Close
  • General

    Cabinet

    Aug 30, 2022 · Apt 5

    Close
  • General

    Bell/buzzer/intercom

    Aug 30, 2022 · Apt 5

    Close
  • Flooring/stairs

    Floor

    Aug 30, 2022 · Apt 5

    Close
  • Flooring/stairs

    Floor

    Aug 30, 2022 · Apt 5

    Close
  • Unsanitary condition

    Pests

    Aug 30, 2022 · Apt 5

    Close
  • Unsanitary condition

    Pests

    Aug 30, 2022 · Apt 5

    Close
  • Water leak

    Slow leak

    Aug 30, 2022 · Apt 5

    Close
  • Water leak

    Slow leak

    Aug 30, 2022 · Apt 5

    Close
  • General

    Janitor/super

    Dec 28, 2021 · Apt 3

    Close
  • General

    Bell/buzzer/intercom

    Dec 28, 2021 · Apt 3

    Close
  • Water leak

    Slow leak

    Dec 28, 2021 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Dec 28, 2021 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Dec 28, 2021 · Apt 3

    Close
  • Safety

    Smoke detector

    Nov 19, 2021 · Apt 5

    Close
  • Appliance

    Electric/gas range

    Nov 19, 2021 · Apt 5

    Close
  • Unsanitary condition

    Pests

    Nov 19, 2021 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Aug 27, 2021 · Apt 4

    Close
  • Water leak

    Heavy flow

    Aug 27, 2021 · Apt 4

    Close
  • Unsanitary condition

    Pests

    Aug 27, 2021 · Apt 5

    Close
  • Plumbing

    Basin/sink

    Aug 27, 2021 · Apt 5

    Close
  • Water leak

    Slow leak

    Aug 27, 2021 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Aug 27, 2021 · Apt 5

    Close
  • Paint/plaster

    Wall

    Aug 27, 2021 · Apt 5

    Close
  • Heat/hot water

    Apartment only

    Feb 20, 2021 · Apt 4

    Close
  • Plumbing

    Water supply

    Dec 30, 2020 · Apt 3

    Close
  • General

    Janitor/super

    Dec 30, 2020 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Dec 30, 2020 · Apt 3

    Close
  • General

    Bell/buzzer/intercom

    Dec 30, 2020 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2020 · Apt 3

    Close
  • Water leak

    Heavy flow

    Dec 25, 2020 · Apt 4

    Close
  • Plumbing

    Radiator

    Feb 3, 2020 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1920
Floors
3
Residential units
5
Building area
5,000 ft²
Lot area
2,000 ft²
Zoning
R6
Community board
317
Council district
41
Block / lot
4628 / 10
Assessed value
$274,500
Landmark / historic district
No

HPD registration #319740, last renewed Mar 6, 2026.

Questions about 1042 Winthrop Street

Who owns 1042 Winthrop Street?

The owner of record in NYC Department of City Planning PLUTO data is Mitchell, Wayne.

Does 1042 Winthrop Street have violations?

Yes. NYC HPD has recorded 93 housing violations at this property.

Is 1042 Winthrop Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1042 Winthrop Street built?

City records list 1920 as the year it was built.

How many apartments are in 1042 Winthrop Street?

It has 5 residential units and 6 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.