992 Rutland Road
Brooklyn, NY 11212BBL 3-04612-0002Map
Owner of record: 992 Rutland Rd LLC
992 Rutland Road is a mixed residential and retail building built in 1931 in Brooklyn, 11212. It has 5 residential units across 3 floors. The owner of record is 992 Rutland Rd LLC. HPD has recorded 159 housing violations here, most recently on May 5, 2026. 8 of the 50 most recent violations are still open.
- HPD violations
- 159
- DOB violations
- 22
- ECB violations
- 3
- HPD complaints
- 187
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 159
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots north front building at fire escape, 2nd story
Jan 10, 2023
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd story balcony north stack, building front
Dec 23, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead roof door at public hall, 3rd story
Dec 23, 2022
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of lockable door knob assembly installed on door to room with fire escape window in the 4th room from north at west located at apt 3r, 3rd story, 1st apartment from east at south
Dec 23, 2022 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of lockable door knob assembly installed on door to room with fire escape window in the 4th room from north at east located at apt 3r, 3rd story, 1st apartment from east at south
Dec 23, 2022 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of a device (sliding bolt with pad lockable eye) installed at door in the entrance located at apt 3r, 3rd story, 1st apartment from east at south
Dec 23, 2022 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Dec 23, 2022 · Apt 3R
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Sep 27, 2022 · Apt 3R
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioning unit installed at window leading to fire escape in the 4th room from north at west located at apt 3r, 3rd story, 1st apartment from east at south
Sep 27, 2022 · Apt 3R
Open — Violation will be reinspected - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Sep 27, 2022 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Sep 27, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead at public hall, 3rd story
Sep 27, 2022
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 3r, 3rd story, 1st apartment from east at south
Sep 27, 2022 · Apt 3R
Open — Violation will be reinspected - CImmediately hazardous
Remove the illegal fastening slide bolt arranged for padlock installed at door in the entrance located at apt 3r, 3rd story, 1st apartment from east at south
Sep 27, 2022 · Apt 3R
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
Sep 27, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at ceiling apprx 50 square feet at west wall apprx 20 square feet at east wall apprx 5 square feet and south wall apprx 10 square feet in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
Sep 27, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape in the 4th room from north at east located at apt 3r, 3rd story, 1st apartment from east at south
Sep 27, 2022 · Apt 3R
Open — Violation will be reinspected - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape in the 4th room from north at west located at apt 3r, 3rd story, 1st apartment from east at south
Sep 27, 2022 · Apt 3R
Open — Violation will be reinspected - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Apr 27, 2022 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Apr 27, 2022 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east at south, the kitchen , the 4th room from north, the 5th room from north located at apt 1r, 1st story, 1st apartment from east at south
Apr 27, 2022 · Apt 1R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 13, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2019
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors at bulkhead to roof
Sep 19, 2018
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air contioning units at 3rd story balcony building rear fire escape , 3rd story
Sep 19, 2018
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north at west located at apt 2f, 2nd story, 1st apartment from west at north
Sep 19, 2018 · Apt 2F
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of key operated lock installed on door to room with fire escape window in the 1st room from north at west located at apt 2f, 2nd story, 1st apartment from west at north
Sep 19, 2018 · Apt 2F
Closed — Violation closed - ANon-hazardous
Refit door in the entrance located at apt 2f, 2nd story, 1st apartment from west at north
Sep 19, 2018 · Apt 2F
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2017
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective lock at building entrance door
Sep 13, 2017
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material. at basement
Sep 13, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 6, 2017
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 6, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Sep 6, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 6, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 6, 2017
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 6, 2017
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2017 · Apt 1R
Closed — Violation closed - BHazardous
Replace with new the missing light fixture at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2017 · Apt 1R
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2017 · Apt 1R
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at tub in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2017 · Apt 1R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum allowable operating temperature of 130 f (146 degress found) located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2017 · Apt 1R
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate . . . located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2017 · Apt 1R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2017 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color . . . north wall, west wall, ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2017 · Apt 1R
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 23, 2017
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 23, 2017
Closed — Violation closed
DOB building violations · 22
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active
Show 12 more ↓
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 3
Noted: at time of inspection, observed a yellow for rent banner at exposure 1, 3rd floor window that is approximately 3' x 5' which is more than the allowable square footage for a for rent sign in a residential
May 19, 2022
Resolve - Class - 2
Noted: at time of inspection, observed a business accessory awning with electric installed with a red background, white letters and wording "mouth in motion". no permits on file for that sign or electrical work
May 19, 2022
Resolve - Class - 2
As per class 1 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.
May 9, 2017
Resolve
Complaints
- Water leak
Heavy flow
May 4, 2026 · Apt 2F
Close - Water leak
Heavy flow
Jan 2, 2025 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Nov 30, 2023 · Apt 1R
Close - Unsanitary condition
Pests
Sep 23, 2022 · Apt 3BR
Close - Electric
Outlet/switch
Sep 23, 2022 · Apt 3BR
Close - Unsanitary condition
Pests
Sep 10, 2022 · Apt 1R
Close - Plumbing
Basin/sink
May 14, 2022 · Apt 1R
Close - Plumbing
Basin/sink
May 14, 2022 · Apt 1R
Close - Paint/plaster
Wall
May 14, 2022 · Apt 1R
Close - Unsanitary condition
Pests
May 14, 2022 · Apt 1R
Close
Show 40 more ↓
- Plumbing
Basin/sink
Apr 26, 2022 · Apt 1R
Close - Paint/plaster
Ceiling
Apr 26, 2022 · Apt 1R
Close - Plumbing
Toilet
Apr 26, 2022 · Apt 1R
Close - Paint/plaster
Wall
Apr 26, 2022 · Apt 1R
Close - Plumbing
Bathtub/shower
Apr 26, 2022 · Apt 1R
Close - Electric
Lighting
Apr 26, 2022 · Apt 1R
Close - Electric
Power outage
May 30, 2021 · Apt 3R
Close - Plumbing
Toilet
May 30, 2021 · Apt 3R
Close - Plumbing
Basin/sink
May 30, 2021 · Apt 3R
Close - Unsanitary condition
Pests
May 30, 2021 · Apt 3R
Close - Flooring/stairs
Floor
May 30, 2021 · Apt 3R
Close - Water leak
Heavy flow
May 30, 2021 · Apt 3R
Close - Door/window
Door
Sep 18, 2018 · Apt 2F
Close - Door/window
Door
Sep 18, 2018 · Apt BLDG
Close - Outside building
Roof door/hatch
Sep 18, 2018 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 18, 2018 · Apt BLDG
Close - Safety
Fire escape
Sep 18, 2018 · Apt 2R
Close - Safety
Fire escape
Sep 18, 2018 · Apt 2F
Close - Safety
Fire escape
Sep 18, 2018 · Apt BLDG
Close - Safety
Fire escape
Sep 18, 2018 · Apt 3R
Close - Unsanitary condition
Pests
Mar 13, 2018 · Apt 3R
Close - Unsanitary condition
Pests
Mar 13, 2018 · Apt 3R
Close - Paint/plaster
Wall
Aug 24, 2017 · Apt 1R
Close - Unsanitary condition
Pests
Aug 24, 2017 · Apt 1R
Close - Unsanitary condition
Pests
Aug 24, 2017 · Apt 1R
Close - General
Cooking gas
Aug 24, 2017 · Apt 1R
Close - Unsanitary condition
Mold
Aug 24, 2017 · Apt 1R
Close - Water leak
Slow leak
Aug 24, 2017 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Aug 24, 2017 · Apt 1R
Close - Electric
Wiring
Aug 24, 2017 · Apt 1R
Close - Unsanitary condition
Mold
Aug 8, 2017 · Apt 1R
Close - Paint/plaster
Wall
Aug 8, 2017 · Apt 1R
Close - Unsanitary condition
Pests
Aug 8, 2017 · Apt 1R
Close - Plumbing
Water supply
Aug 8, 2017 · Apt 1R
Close - Electric
Wiring
Aug 8, 2017 · Apt 1R
Close - Water leak
Damp spot
Jul 19, 2017 · Apt 2F
Close - Door/window
Door
Jul 19, 2017 · Apt BLDG
Close - Flooring/stairs
Floor
Jul 19, 2017 · Apt BLDG
Close - Paint/plaster
Ceiling
Jul 19, 2017 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Jul 19, 2017 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1931
- Floors
- 3
- Residential units
- 5
- Building area
- 3,480 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4612 / 2
- Assessed value
- $234,000
- Landmark / historic district
- No
HPD registration #357607, last renewed Jul 20, 2026.
Questions about 992 Rutland Road
Who owns 992 Rutland Road?
The owner of record in NYC Department of City Planning PLUTO data is 992 Rutland Rd LLC.
Does 992 Rutland Road have violations?
Yes. NYC HPD has recorded 159 housing violations at this property.
Is 992 Rutland Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 992 Rutland Road built?
City records list 1931 as the year it was built.
How many apartments are in 992 Rutland Road?
It has 5 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.