roofy

199 East 91 Street

Brooklyn, NY 11212BBL 3-04610-0048Map

Owner of record: Francella R Webb

199 East 91 Street is a walk-up apartment building built in 1925 in Brooklyn, 11212. It has 3 residential units across 2 floors. The owner of record is Francella R Webb. HPD has recorded 65 housing violations here, most recently on May 4, 2026. 50 of the 50 most recent violations are still open.

HPD violations
65
DOB violations
0
ECB violations
0
HPD complaints
15

What to know

Concern
22 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 65

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft of mold at east wall ,south wall, west wall and ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — First no access to re- inspect violation
  • C

    Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall in the 1st private hallway located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 6th room from east located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the 1st room from east at north located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 5th room from east located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 3rd room from east at north located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
Show 40 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, west wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, south wall, east wall, south wall, east wall, south wall in the kitchen located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, west wall, 1st closet from south at west wall door, north wall in the 1st room from east at north located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at north located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the 5th room from east located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 5th room from east located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Notice of issuance sent to tenant
  • C

    Remove the illegal fastening double cylinder lock install at the building entrance gate , 1st story

    Apr 14, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , 1st door frame from south at west wall, west wall, 1st closet from south at west wall door frame, 1st closet from south at west wall door, north wall in the 1st room from east at north located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , south wall, west wall in the 5th room from east located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department , north wall, east wall, south wall, west wall, ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1stfl, 1st story, 1st apartment from north at east

    Apr 14, 2026 · Apt 1STFL

    Open — Certification postponment denied
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 9, 2025

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 4th room from east located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall in the 5th room from east located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from north at east wall in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from south at west wall door frame, 1st closet from south at west wall door in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 4th room from east located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east

    Aug 30, 2024 · Apt 1FL

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 22, 2023

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Mold

    Apr 9, 2026 · Apt 1STFL

    Close
  • Unsanitary condition

    Mold

    Aug 28, 2024 · Apt 1FL

    Close
  • Door/window

    Window frame

    Dec 29, 2016 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Dec 29, 2016 · Apt 2NDFL

    Close
  • Electric

    Lighting

    Dec 29, 2016 · Apt 2NDFL

    Close
  • Door/window

    Window frame

    Dec 29, 2016 · Apt 2NDFL

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2016 · Apt 2NDFL

    Close
  • Unsanitary condition

    Mold

    Dec 29, 2016 · Apt 2NDFL

    Close
  • Safety

    Window guard broken/missing

    Dec 29, 2016 · Apt 2NDFL

    Close
  • Door/window

    Window frame

    Jul 24, 2016 · Apt 2

    Close
Show 5 more ↓
  • Paint/plaster

    Wall

    Jul 24, 2016 · Apt 2

    Close
  • Safety

    Window guard broken/missing

    Jul 24, 2016 · Apt 2

    Close
  • Electric

    Outlet/switch

    Jul 24, 2016 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Jul 24, 2016 · Apt 2

    Close
  • Heating

    Heat related

    Jan 8, 2004 · Apt 2 FLR

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1925
Floors
2
Residential units
3
Building area
4,140 ft²
Lot area
2,050 ft²
Zoning
R6
Community board
317
Council district
41
Block / lot
4610 / 48
Assessed value
$102,720
Landmark / historic district
No

HPD registration #381765, last renewed Sep 4, 2025.

Questions about 199 East 91 Street

Who owns 199 East 91 Street?

The owner of record in NYC Department of City Planning PLUTO data is Francella R Webb.

Does 199 East 91 Street have violations?

Yes. NYC HPD has recorded 65 housing violations at this property.

Is 199 East 91 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 199 East 91 Street built?

City records list 1925 as the year it was built.

How many apartments are in 199 East 91 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.