199 East 91 Street
Brooklyn, NY 11212BBL 3-04610-0048Map
Owner of record: Francella R Webb
199 East 91 Street is a walk-up apartment building built in 1925 in Brooklyn, 11212. It has 3 residential units across 2 floors. The owner of record is Francella R Webb. HPD has recorded 65 housing violations here, most recently on May 4, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 65
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 15
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft of mold at east wall ,south wall, west wall and ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall in the 1st private hallway located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 6th room from east located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the 1st room from east at north located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 5th room from east located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 3rd room from east at north located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, west wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, south wall, east wall, south wall, east wall, south wall in the kitchen located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, west wall, 1st closet from south at west wall door, north wall in the 1st room from east at north located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at north located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 5th room from east located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 5th room from east located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Notice of issuance sent to tenant - CImmediately hazardous
Remove the illegal fastening double cylinder lock install at the building entrance gate , 1st story
Apr 14, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , 1st door frame from south at west wall, west wall, 1st closet from south at west wall door frame, 1st closet from south at west wall door, north wall in the 1st room from east at north located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , south wall, west wall in the 5th room from east located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , north wall, east wall, south wall, west wall, ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1stfl, 1st story, 1st apartment from north at east
Apr 14, 2026 · Apt 1STFL
Open — Certification postponment denied - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 4th room from east located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall in the 5th room from east located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from north at east wall in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from south at west wall door frame, 1st closet from south at west wall door in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 4th room from east located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east
Aug 30, 2024 · Apt 1FL
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Mold
Apr 9, 2026 · Apt 1STFL
Close - Unsanitary condition
Mold
Aug 28, 2024 · Apt 1FL
Close - Door/window
Window frame
Dec 29, 2016 · Apt 2NDFL
Close - Paint/plaster
Wall
Dec 29, 2016 · Apt 2NDFL
Close - Electric
Lighting
Dec 29, 2016 · Apt 2NDFL
Close - Door/window
Window frame
Dec 29, 2016 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Dec 29, 2016 · Apt 2NDFL
Close - Unsanitary condition
Mold
Dec 29, 2016 · Apt 2NDFL
Close - Safety
Window guard broken/missing
Dec 29, 2016 · Apt 2NDFL
Close - Door/window
Window frame
Jul 24, 2016 · Apt 2
Close
Show 5 more ↓
- Paint/plaster
Wall
Jul 24, 2016 · Apt 2
Close - Safety
Window guard broken/missing
Jul 24, 2016 · Apt 2
Close - Electric
Outlet/switch
Jul 24, 2016 · Apt 2
Close - Unsanitary condition
Mold
Jul 24, 2016 · Apt 2
Close - Heating
Heat related
Jan 8, 2004 · Apt 2 FLR
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1925
- Floors
- 2
- Residential units
- 3
- Building area
- 4,140 ft²
- Lot area
- 2,050 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4610 / 48
- Assessed value
- $102,720
- Landmark / historic district
- No
HPD registration #381765, last renewed Sep 4, 2025.
Questions about 199 East 91 Street
Who owns 199 East 91 Street?
The owner of record in NYC Department of City Planning PLUTO data is Francella R Webb.
Does 199 East 91 Street have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 199 East 91 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 199 East 91 Street built?
City records list 1925 as the year it was built.
How many apartments are in 199 East 91 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.