roofy

393 Montauk Avenue

Brooklyn, NY 11208BBL 3-04456-0078Map

Owner of record: Citimortgage, INC.

393 Montauk Avenue is a walk-up apartment building built in 1930 in Brooklyn, 11208. It has 4 residential units across 2 floors. The owner of record is Citimortgage, INC.. HPD has recorded 280 housing violations here, most recently on September 23, 2026. 50 of the 50 most recent violations are still open.

HPD violations
280
DOB violations
0
ECB violations
0
HPD complaints
148

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 280

  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st riser from south at west wall in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from north at east wall in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at north wall, east wall, south wall, 1st window frame from east at south wall, west wall in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall, east wall, south wall, west wall, 1st closet from south at west wall wall, 1st closet from south at west wall door frame, 1st closet from south at west wall door, ceiling, 1st window frame from north at east wall, east wall, south wall, west wall, 1st closet from south at west wall wall, 1st closet from south at west wall door frame, 1st closet from south at west wall door, ceiling, 1st window frame from north at east wall, east wall, south wall, west wall, 1st closet from south at west wall wall, 1st closet from south at west wall door frame, 1st closet from south at west wall door, ceiling in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower window sash spring balance at south wall in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at west wall in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective door at entrance in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at east and south walls in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Notice of issuance sent to tenant
  • B

    Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall, east wall, south wall in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall, ceiling, east wall, 1st closet from south at west wall door in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Replace with new the missing door knob at door at entrance in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from north at east

    Sep 23, 2026 · Apt 2A

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Open — Nov sent out
  • B

    Properly secure the loose ,shower curtain rod in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 26, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ,wooden floor in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 26, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ,all walls and ceiling in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 26, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules ,missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 26, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations ,missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 26, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ,ceramic wall tiles at south in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 26, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective ,wooden floor in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 26, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Apr 26, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Apr 7, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Apr 7, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings notice missing

    Apr 7, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox notice missing at public hall, 1st story

    Apr 7, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Apr 7, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east

    Apr 7, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall and east wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Apr 7, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Apr 7, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood base cabinet at north wall in the kitchen located at apt 1r, 1st story, 1st apartment from north at east

    Apr 7, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from north at east

    Apr 7, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Apr 7, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 1r, 1st story, 1st apartment from north at east

    Apr 7, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 1r, 1st story, 1st apartment from north at east

    Apr 7, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 7, 2026

    Open — Nov sent out
  • C

    Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at ceiling and all walls in the 1st room from east located at apt 1r, 1st story, 1st apartment from north at east

    Apr 7, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east wall, south wall in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    Oct 8, 2025 · Apt 2A

    Open — Certification postponment granted
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east

    Oct 8, 2025 · Apt 2A

    Open — Certification postponment granted
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east

    Oct 8, 2025 · Apt 2A

    Open — Certification postponment granted
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east

    Oct 8, 2025 · Apt 2A

    Open — Certification postponment granted

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Mold

    Sep 11, 2026 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Sep 11, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Sep 11, 2026 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Sep 11, 2026 · Apt 2A

    Close
  • Plumbing

    Bathtub/shower

    Sep 11, 2026 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Sep 11, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Sep 11, 2026 · Apt 2A

    Close
  • Door/window

    Window frame

    Sep 11, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Sep 11, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Apr 17, 2026 · Apt 2R

    Close
Show 40 more ↓
  • Plumbing

    Bathtub/shower

    Apr 17, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Apr 17, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Apr 17, 2026 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Apr 17, 2026 · Apt 2R

    Close
  • Door/window

    Window frame

    Apr 17, 2026 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Apr 17, 2026 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Apr 17, 2026 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Apr 17, 2026 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Mar 24, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Mar 24, 2026 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Mar 24, 2026 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2025 · Apt 2A

    Close
  • General

    Cooking gas

    Oct 3, 2025 · Apt 2A

    Close
  • Appliance

    Electric/gas range

    Sep 26, 2025 · Apt 2R

    Close
  • General

    Cooking gas

    Sep 24, 2025 · Apt 2R

    Close
  • Outside building

    Skylight

    Aug 22, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Aug 22, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Aug 22, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Aug 22, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Aug 22, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Aug 22, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Aug 22, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Aug 22, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Aug 22, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Jul 14, 2025 · Apt 2FLOOR

    Close
  • Door/window

    Window frame

    Jul 14, 2025 · Apt 2FLOOR

    Close
  • Paint/plaster

    Wall

    Jul 14, 2025 · Apt 2FLOOR

    Close
  • Unsanitary condition

    Pests

    Jul 14, 2025 · Apt 2FLOOR

    Close
  • Appliance

    Electric/gas range

    Jul 14, 2025 · Apt 2FLOOR

    Close
  • Unsanitary condition

    Pests

    Jul 14, 2025 · Apt 2FLOOR

    Close
  • Water leak

    Slow leak

    Jul 14, 2025 · Apt 2FLOOR

    Close
  • Outside building

    Gutter/leader

    Jul 14, 2025 · Apt STAIRS

    Close
  • Outside building

    Roof door/hatch

    Jul 14, 2025 · Apt STAIRS

    Close
  • Water leak

    Heavy flow

    Jul 14, 2025 · Apt STAIRS

    Close
  • Outside building

    Porch/balcony

    Jul 14, 2025 · Apt STAIRS

    Close
  • Electric

    Wiring

    Jul 14, 2025 · Apt 2FLOOR

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1930
Floors
2
Residential units
4
Building area
2,356 ft²
Lot area
4,100 ft²
Zoning
R5
Community board
305
Council district
42
Block / lot
4456 / 78
Assessed value
$185,850
Landmark / historic district
No

HPD registration #367269, last renewed Sep 10, 2025.

Questions about 393 Montauk Avenue

Who owns 393 Montauk Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Citimortgage, INC..

Does 393 Montauk Avenue have violations?

Yes. NYC HPD has recorded 280 housing violations at this property.

Is 393 Montauk Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 393 Montauk Avenue built?

City records list 1930 as the year it was built.

How many apartments are in 393 Montauk Avenue?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.