918 New Lots Avenue
Brooklyn, NY 11208BBL 3-04455-0003Map
Owner of record: 918 New Lots Ave LLC
918 New Lots Avenue is a mixed residential and retail building built in 1910 in Brooklyn, 11208. It has 2 residential units across 2 floors. The owner of record is 918 New Lots Ave LLC. HPD has recorded 106 housing violations here, most recently on July 22, 2026. 49 of the 50 most recent violations are still open.
- HPD violations
- 106
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 39
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 106
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Jul 22, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor
Jul 22, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 22, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox sign missing
Jul 22, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jul 22, 2026
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination .. at public hall, 2nd story
Jul 22, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at junction box at ceiling at public hall, 2nd story
Jul 22, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 2r, 2nd story, 1st apartment from east at south
Jul 22, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at the lower sash window in the 2nd room from north at east located at apt 2r, 2nd story, 1st apartment from east at south
Jul 22, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixtures at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Jul 22, 2026 · Apt 2R
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective glass pane at the upper sash window first from east at south in the 2nd room from north at east located at apt 2r, 2nd story, 1st apartment from east at south
Jul 22, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Open — Info nov sent out - ANon-hazardous
Properly repair or replace the broken or defective wood door in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from east at south
Oct 24, 2025 · Apt 2R
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective wood door in the 1st room from east located at apt 2r, 2nd story, 1st apartment from east at south
Oct 24, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 1st apartment from east at south
Oct 24, 2025 · Apt 2R
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Oct 24, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq feet at ceiling in the 1st room from east located at apt 2r, 2nd story, 1st apartment from east at south
Oct 24, 2025 · Apt 2R
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling, north wall, and east wall in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from east at south
Oct 24, 2025 · Apt 2R
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, and east wall in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from east at south
Oct 24, 2025 · Apt 2R
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective spring balance at lower sash window in the 1st room from east located at apt 2r, 2nd story, 1st apartment from east at south
Oct 24, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 3rd room from east at north located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall in the foyer located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 3rd room from east at north located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Notice of issuance sent to tenant - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light switch plate cover at north wall in the foyer located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - BHazardous
Replace with new the missing electrical light switch plate cover at east wall in the foyer located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from north at east wall in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st door frame from north at east wall, 1st door frame from south at west wall in the foyer located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq/ft at the ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Oct 16, 2025 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq/ft at the ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at west original violation 18303630 issued 16-oct-25 has been upgraded to class c per administrative code 27-2017.3a(5)(a) or (b).
Oct 16, 2025 · Apt 1R
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 23, 2025
Open — Nov sent out - BHazardous
Repair or replace the smoke detector that is missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Feb 23, 2025 · Apt 2R
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Feb 23, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Feb 23, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box that is missing at public hall, 1st story
Feb 23, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor that is missing at public hall, 1st story
Feb 23, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Feb 23, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system that is missing at public hall, 1st story
Feb 23, 2025
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective plaster with fire retardant material at ceiling at public hall, 1st story
Feb 23, 2025
Open — Nov sent out - BHazardous
Replace with new the missing electrical light fixture at ceiling at public hall, 2nd story
Feb 23, 2025
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective closet doors at south wall in the private hallway located at apt 2r, 2nd story, 1st apartment from east at south
Feb 23, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass for upper sash window, 1st window from east in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from east at south
Feb 23, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance for upper and lower sash window, 1st window from east in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from east at south
Feb 23, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above the ceiling in the 2nd room from east at south located at apt 2r, 2nd story, 1st apartment from east at south
Feb 23, 2025 · Apt 2R
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Mold
Jul 17, 2026 · Apt 2R
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Plumbing
Toilet
Oct 15, 2025 · Apt 1R
Close - Plumbing
Bathtub/shower
Oct 15, 2025 · Apt 1R
Close - Unsanitary condition
Pests
Oct 15, 2025 · Apt 1R
Close - Water leak
Heavy flow
Oct 15, 2025 · Apt 1R
Close - Paint/plaster
Cabinet
Oct 15, 2025 · Apt 1R
Close - Unsanitary condition
Mold
Oct 15, 2025 · Apt 1R
Close - Plumbing
Steam pipe/riser
Oct 15, 2025 · Apt 1R
Close - Water leak
Slow leak
Sep 19, 2025 · Apt 2R
Close
Show 29 more ↓
- General
Cooking gas
Sep 19, 2025 · Apt 2R
Close - Appliance
Refrigerator
Sep 19, 2025 · Apt 2R
Close - Paint/plaster
Wall
Sep 19, 2025 · Apt 2R
Close - Door/window
Window frame
Sep 19, 2025 · Apt 2R
Close - Electric
Wiring
Sep 19, 2025 · Apt 2R
Close - Heat/hot water
Apartment only
Feb 19, 2025 · Apt 2R
Close - Electric
Power outage
Feb 11, 2025 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Feb 11, 2025 · Apt 2R
Close - Electric
No lighting
Feb 11, 2025 · Apt 2R
Close - General
Bell/buzzer/intercom
Feb 11, 2025 · Apt 2R
Close - Electric
Power outage
Feb 10, 2025 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Feb 10, 2025 · Apt 2R
Close - General
Bell/buzzer/intercom
Jan 31, 2025 · Apt 2R
Close - Electric
No lighting
Jan 31, 2025 · Apt 2R
Close - Door/window
Window frame
Jan 31, 2025 · Apt 2R
Close - Door/window
Door
Jan 31, 2025 · Apt 2R
Close - Appliance
Electric/gas range
Jan 31, 2025 · Apt 2R
Close - Door/window
Window pane
Jan 31, 2025 · Apt 2R
Close - Unsanitary condition
Pests
Jan 31, 2025 · Apt 2R
Close - Paint/plaster
Ceiling
Jan 31, 2025 · Apt 2R
Close - Plumbing
Basin/sink
Jan 31, 2025 · Apt 2R
Close - Unsanitary condition
Pests
Jan 31, 2025 · Apt 2R
Close - General
Bell/buzzer/intercom
Jun 6, 2024 · Apt 2R
Close - Electric
No lighting
Jun 6, 2024 · Apt 2R
Close - Nonconst
Vermin
Mar 12, 2012 · Apt 1R
Close - General
Mold
Mar 12, 2012 · Apt 1R
Close - Heating
Heat related
Dec 5, 2009 · Apt 1R
Close - Nonconst
Vermin
Dec 5, 2009 · Apt 1R
Close - Paint/plaster
Wall
Dec 5, 2009 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1910
- Floors
- 2
- Residential units
- 2
- Building area
- 3,696 ft²
- Lot area
- 2,000 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 42
- Block / lot
- 4455 / 3
- Assessed value
- $72,180
- Landmark / historic district
- No
HPD registration #322351, last renewed Aug 29, 2023.
Questions about 918 New Lots Avenue
Who owns 918 New Lots Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 918 New Lots Ave LLC.
Does 918 New Lots Avenue have violations?
Yes. NYC HPD has recorded 106 housing violations at this property.
Is 918 New Lots Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 918 New Lots Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 918 New Lots Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.