180 Bethel Loop
Brooklyn, NY 11239BBL 3-04452-0085Map
Owner of record: Bsc Housing Company, INC.
180 Bethel Loop is an elevator apartment building built in 1970 in Brooklyn, 11239. It has 2,926 residential units across 20 floors. The owner of record is Bsc Housing Company, INC.. HPD has recorded 962 housing violations here, most recently on October 15, 2026. 14 of the 50 most recent violations are still open.
- HPD violations
- 962
- DOB violations
- 377
- ECB violations
- 211
- HPD complaints
- 2,543
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 962
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at cieling in the bathroom located at apt 7d, 7th story, 1st apartment from south at west , section at east
Oct 15, 2026 · Apt 7D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to first fire stairs from south at west wall (labeled stair b) at public hall, 5th story
Sep 23, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd private hallway from north located at apt 5g, 5th story, 1st apartment from west at north , section ''e-h''
Sep 23, 2026 · Apt 5G
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from north located at apt 5g, 5th story, 1st apartment from west at north , section ''e-h''
Sep 23, 2026 · Apt 5G
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at west located at apt 5g, 5th story, 1st apartment from west at north , section ''e-h''
Sep 23, 2026 · Apt 5G
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5g, 5th story, 1st apartment from west at north , section ''e-h''
Sep 23, 2026 · Apt 5G
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective warping wood floor in the 1st room from north located at apt 5c, 5th story, 1st apartment from west at north
Sep 10, 2026 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 7c, 7th story, 1st apartment from north at east
Sep 7, 2026 · Apt 7C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 8d, 8th story, 1st apartment from south at west
Aug 19, 2026 · Apt 8D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 8d, 8th story, 1st apartment from south at west
Aug 19, 2026 · Apt 8D
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 1o sqft observed at ceiling in the bathroom located at apt 7b, 7th story, 2nd apartment from west at north
Aug 19, 2026 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 2nd apartment from north at east
Jun 30, 2026 · Apt 3B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at east, west and south wall in the closet in the foyer located at apt 8d, 8th story, 2nd apartment from north at east
Jun 24, 2026 · Apt 8D
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 8d, 8th story, 2nd apartment from north at east
Jun 24, 2026 · Apt 8D
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at west wall in the kitchen located at apt 8d, 8th story, 2nd apartment from north at east
Jun 24, 2026 · Apt 8D
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4f, 4th story, 2nd apartment from north at east
Jun 21, 2026 · Apt 4F
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 4f, 4th story, 2nd apartment from north at east
Jun 21, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4f, 4th story, 2nd apartment from north at east
Jun 21, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective 1st and 2nd electrical outlets from west at north wall in the kitchen located at apt 4f, 4th story, 2nd apartment from north at east
Jun 21, 2026 · Apt 4F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story
Jun 21, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4f, 4th story, 2nd apartment from north at east
Jun 21, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 10h, 10th story, 2nd apartment from north at east
Jun 9, 2026 · Apt 10H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling west and south wall in the bathroom located at apt 3g, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 3G
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sq feet at ceiling in the bathroom located at apt 3g, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 3G
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8h, 8th story, 1st apartment from east at south
May 4, 2026 · Apt 8H
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 8h, 8th story, 1st apartment from east at south
May 4, 2026 · Apt 8H
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Apr 11, 2026 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the bathroom located at apt 11d, 11th story, 2nd apartment from east at south
Mar 30, 2026 · Apt 11D
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 11d, 11th story, 2nd apartment from east at south
Mar 30, 2026 · Apt 11D
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling great than 10sq ft in the bathroom located at apt 11d, 11th story, 2nd apartment from east at south
Mar 30, 2026 · Apt 11D
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 9e, 9th story, 1st apartment from west at north
Mar 25, 2026 · Apt 9E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north and east wall in the 2nd bathroom from north located at apt 3g, 3rd story
Mar 13, 2026 · Apt 3G
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. in the 1st bathroom from east at south located at apt 3g, 3rd story, 1st apartment from west at north
Jan 25, 2026 · Apt 3G
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 3rd bathroom from east located at apt 3g, 3rd story, 1st apartment from west at north
Jan 25, 2026 · Apt 3G
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock on the vestibule door at public hall, 1st story
Jan 21, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 3b, 3rd story, 2nd apartment from north at east , section at south
Dec 24, 2025 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl . in the 2nd bathroom from east located at apt 3b, 3rd story, 2nd apartment from north at east , section at south
Dec 24, 2025 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 2nd apartment from north at east , section at south
Dec 24, 2025 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 2nd apartment from north at east , section at south
Dec 24, 2025 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective heating and cooling unit at the east wall in the 1st room from north located at apt 10h, 10th story, 3rd apartment from north at east
Dec 6, 2025 · Apt 10H
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at west wall in the bathroom located at apt 17c, 17th story, 1st apartment from east at south
Dec 6, 2025 · Apt 17C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 17c, 17th story, 1st apartment from east at south
Dec 6, 2025 · Apt 17C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2h, 2nd story, 1st apartment from west at north
Dec 4, 2025 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2h, 2nd story, 1st apartment from west at north
Dec 4, 2025 · Apt 2H
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2025
Closed — Violation dismissed - BHazardous
Replace with new the missing electric outlet cover at south wall in the 2nd bathroom from north located at apt 13b, 13th story, 2nd apartment from north at east
Nov 11, 2025 · Apt 13B
Closed — Violation dismissed - BHazardous
Replace with new the missing electric outlet cover at north wall in the 1st bathroom from north located at apt 13b, 13th story, 2nd apartment from north at east
Nov 11, 2025 · Apt 13B
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing electric outlet cover at north wall in the kitchen located at apt 13b, 13th story, 2nd apartment from north at east
Nov 11, 2025 · Apt 13B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 2nd apartment from north at east
Nov 11, 2025 · Apt 3B
Closed — Violation dismissed
DOB building violations · 377
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2024
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2022
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 28, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2020
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 13, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 23, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 23, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2017
Dob violation - resolved
ECB violations · 211
- Class - 1
Observed at exp#3 rear of building balcony located on the 16fl of building has stated to crack and show section of rebar. balcony is located over upk playground and secondary means of egress. creating a hazardo
Jul 17, 2025 · Penalty $6,250
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons #39038893n issued on 4/6/2021, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable certif
May 15, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons #39038894p issued on 4/6/2021, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable certif
May 15, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code compliant manner.lack of emergency lighting for exits,exit discharges & public corridors per bc 1006.1;27-542 note:at 1st fl near rear exit door emergency light non operatio
Jan 25, 2023
Resolve - Class - 2
Failure to maintain building in code compliant manner lack of emergency lighting for exits,exit discharges & public corridors per bc 1006.1;27-542 noted:at 1st fl near rear exit emergency light was non operatio
Jan 25, 2023
Resolve - Class - 1
Failed to notify dept of incident that resulted in fatality or injury note:worker fell aprx5' off ladder to grade level.worker suffered footinjury.worker taken to hosp.as per check of dept records permit holder
Oct 20, 2022 · Penalty $5,000
Resolve - Class - 2
At time of inspection ,i observed that an approved ladder that was used for workers accessing overhead protection on job site at exposure 3 approximately 9 feet from grade level was not secured that may create
Sep 27, 2022
Resolve - Class - 1
At of inspection ,i observed over head protection at exposure 3 with workers and suspended scaffold operations, upon further inspection i observed that there were no guard rail protection provided to protect wo
Sep 27, 2022 · Penalty $2,500
Resolve - Class - 1
Active site, observed horizontal tie-backs not installed perpendicular to the face of the building without opposing lines. code stipulates that horizontal tiebacks shall be installed perpendicular to the face o
Aug 16, 2022 · Penalty $2,500
Resolve - Class - 1
Plan view drops locations contrary to that shown on the cd-5; 2. frame base missing 2inch styrofoam, and b>" plywood throughout; 3. installation for a truss system contrary to that shown on the drawings - missi
Aug 16, 2022 · Penalty $2,500
Resolve
Show 40 more ↓
- Class - 1
1. bulkhead wrap details with unprotected wire not provided or missing; 2. anchorage details not provided; 3. platform and strrips details/specs not provided; 4. no manufacture spec for a-frame system
Aug 16, 2022 · Penalty $2,500
Resolve - Class - 1
At the time of an inspection of an active site, observed a-frame setup with no counter weight securement installed. code stipulates that counterweights shall be secured by mechanical means to the outrigger to p
Aug 16, 2022 · Penalty $2,500
Resolve - Class - 1
Frame set-up details and plan view do not correspond to actual field conditions -missing single frame details/counterweight calculations and inadequate drop locations; lifeline anchorage missing protected from
Jul 30, 2022 · Penalty $2,500
Resolve - Class - 1
Observed three suspended scaffold outriggers in use. upon request to see dob approved rigger foreman card mr. eruviel rojas claimed he was the site foreman and provided inadequate card which did not belong to a
Jul 30, 2022 · Penalty $2,500
Resolve - Class - 2
Active jobsite, upon request to see designated qualified person ( qsp) letter signed and dated by the permit holder, none was provided. designate qsp as per the code
Jul 30, 2022
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35507761p issued on 06/13/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner,@
Jul 28, 2021 · Penalty $1,250
Resolve - Class - 1
Failures to maintain bldg in a code compliant manner.noted:entry door to stairway "a" at the 2nd fl is defective and can not open. remedy: repair & replace.
Jun 13, 2021 · Penalty $1,280
Active - Class - 2
Seal hoist machine leaks
Apr 6, 2021 · Penalty $625
Resolve - Class - 2
Seal hoist machine leaks
Apr 6, 2021 · Penalty $310
Resolve - Class - 2
Seal hoist machine leaks. shorten gov ropes.
Apr 6, 2021 · Penalty $625
Resolve - Class - 2
Shorten hoist ropes
Apr 6, 2021 · Penalty $310
Resolve - Class - 2
Shorten hoist ropes
Apr 6, 2021 · Penalty $310
Resolve - Class - 2
Shorten gov rope
Apr 6, 2021 · Penalty $625
Resolve - Class - 2
Unguarded electrical panel in machine room
Apr 5, 2021 · Penalty $310
Resolve - Class - 2
Seal hoist machine leaks
Apr 5, 2021 · Penalty $310
Resolve - Class - 2
Seal hoist machine leaks
Apr 5, 2021 · Penalty $310
Resolve - Class - 2
Seal hoist machine leaks
Apr 5, 2021 · Penalty $310
Resolve - Class - 2
Seal hoist machine leaks
Apr 5, 2021 · Penalty $310
Resolve - Class - 2
Seal hoist machine leaks. shorten hoist ropes
Apr 5, 2021 · Penalty $625
Resolve - Class - 2
Shorten hoist ropes. seal hoist machine leaks
Mar 29, 2021 · Penalty $625
Resolve - Class - 3
File necessary paperwork in order to legalize the removal of this device
Mar 29, 2021 · Penalty $500
Active - Class - 2
Seal hoist machine leaks
Mar 29, 2021 · Penalty $310
Resolve - Class - 2
Seal hoist machine leaks
Mar 29, 2021 · Penalty $1,562
Resolve - Class - 2
Defective car phone. repair machine room door. unguarded cab light. expired fire extinguisher
Mar 29, 2021 · Penalty $625
Resolve - Class - 2
Seal hoist machine leaks
Mar 26, 2021 · Penalty $625
Resolve - Class - 2
Shorten hoist ropes. regroove sheave
Mar 26, 2021 · Penalty $625
Resolve - Class - 2
Seal hoist machine leaks
Mar 26, 2021 · Penalty $625
Resolve - Class - 2
Expired fire extinguisher
Mar 26, 2021 · Penalty $312
Resolve - Class - 2
Seal hoist machine leaks
Mar 26, 2021 · Penalty $1,562
Resolve - Class - 2
Seal hoist machine leaks. oil leaking into top of shaft. unguarded breaker panel in machine room
Mar 26, 2021 · Penalty $625
Resolve - Class - 2
Seal hoist machine leaks
Mar 26, 2021 · Penalty $625
Resolve - Class - 2
Seal hoist machine leaks
Mar 25, 2021 · Penalty $625
Active - Class - 2
Seal hoist machine leaks
Mar 25, 2021 · Penalty $310
Resolve - Class - 1
No application on file for 400 amp disconnect switch and feeder in boiler room, obtain permit; obtain permit
Jan 26, 2021 · Penalty $1,600
Resolve - Class - 2
Work w/o a permit. noted:at time of inspection,observation was made at1st fl level ground floor laundry room area of above premises. 4-5 worker performing construction work,consisting of new running drainage pl
Sep 30, 2020 · Penalty $3,125
Resolve - Class - 2
Adjust cwt toller guides. oil leaking into top of shaft. main line can be opened when power on. seal hoist machine leaks
Jul 16, 2020 · Penalty $1,562
Resolve - Class - 2
Main line can be opened when power on. seal hoist machine leaks
Jul 16, 2020 · Penalty $1,562
Resolve - Class - 2
Main line can be opened when power on. unreadable main line fuses. adjust phone volume
Jul 15, 2020 · Penalty $1,562
Resolve - Class - 2
Main line can be opened when power on. unreadable main line fuses.
Jul 15, 2020 · Penalty $1,562
Resolve - Class - 2
Shorten hosit ropes. main line can be opened when power on. unreadable main line fuses. seal hoist machine leaks
Jul 15, 2020 · Penalty $1,562
Resolve
Complaints
- Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Open - Heat/hot water
Apartment only
Oct 21, 2026 · Apt 7B
Close - Heat/hot water
Entire building
Oct 20, 2026 · Apt 2B
Open - Heat/hot water
Apartment only
Oct 18, 2026 · Apt 13E
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 14, 2026 · Apt 12G
Open - Paint/plaster
Ceiling
Oct 9, 2026 · Apt 7D
Close - Water leak
Slow leak
Oct 9, 2026 · Apt 7D
Close - Unsanitary condition
Mold
Oct 9, 2026 · Apt 7D
Close
Show 40 more ↓
- Plumbing
Steam pipe/riser
Oct 9, 2026 · Apt 3C
Close - Flooring/stairs
Floor
Sep 15, 2026 · Apt 5G
Close - Door/window
Door frame
Sep 15, 2026 · Apt 5G
Close - Unsanitary condition
Mold
Sep 15, 2026 · Apt 5G
Close - Unsanitary condition
Pests
Sep 15, 2026 · Apt 5G
Close - Paint/plaster
Ceiling
Sep 8, 2026 · Apt 7B
Close - General
Cabinet
Sep 8, 2026 · Apt 7B
Close - Unsanitary condition
Mold
Sep 8, 2026 · Apt 7B
Close - Flooring/stairs
Floor
Sep 8, 2026 · Apt 5C
Close - Unsanitary condition
Mold
Sep 8, 2026 · Apt 5C
Close - Unsanitary condition
Pests
Sep 1, 2026 · Apt PUBLIC
Close - Door/window
Door
Aug 13, 2026 · Apt 14A
Close - Unsanitary condition
Pests
Aug 11, 2026 · Apt 7C
Close - General
Cabinet
Aug 11, 2026 · Apt 7B
Close - General
Ventilation system
Aug 11, 2026 · Apt 7B
Close - Unsanitary condition
Mold
Aug 11, 2026 · Apt 7B
Close - Unsanitary condition
Mold
Aug 9, 2026 · Apt 8D
Close - Unsanitary condition
Garbage/recycling storage
Aug 4, 2026 · Apt 6B
Close - Unsanitary condition
Pests
Aug 4, 2026 · Apt 6B
Close - Plumbing
Water supply
Aug 2, 2026 · Apt APT6C
Close - Flooring/stairs
Floor
Jul 7, 2026 · Apt 9G
Close - Plumbing
Toilet
Jul 7, 2026 · Apt 9G
Close - Unsanitary condition
Garbage/recycling storage
Jul 5, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 27, 2026 · Apt 3B
Close - Door/window
Door
Jun 21, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jun 17, 2026 · Apt 8D
Close - Water leak
Heavy flow
Jun 15, 2026 · Apt 5F
Close - Water leak
Slow leak
Jun 15, 2026 · Apt 5F
Close - Water leak
Damp spot
Jun 15, 2026 · Apt 5F
Close - Water leak
Heavy flow
Jun 15, 2026 · Apt 5F
Close - Water leak
Slow leak
Jun 10, 2026 · Apt 8F
Close - Unsanitary condition
Mold
Jun 10, 2026 · Apt 8D
Close - Unsanitary condition
Pests
Jun 10, 2026 · Apt 8D
Close - Door/window
Door
Jun 10, 2026 · Apt 8D
Close - Unsanitary condition
Pests
Jun 10, 2026 · Apt 8D
Close - Flooring/stairs
Floor
Jun 5, 2026 · Apt 10H
Close - Door/window
Door
Jun 4, 2026 · Apt LOBBY
Close - Unsanitary condition
Pests
Jun 1, 2026 · Apt 6C
Close - Electric
Outlet/switch
May 30, 2026 · Apt 4FBUIL
Close - Appliance
Electric/gas range
May 26, 2026 · Apt 9E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1970
- Floors
- 20
- Residential units
- 2,926
- Building area
- 1,688,760 ft²
- Lot area
- 1,073,857 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 42
- Block / lot
- 4452 / 85
- Assessed value
- $88,622,550
- Landmark / historic district
- No
HPD registration #374639, last renewed Mar 17, 2026.
Questions about 180 Bethel Loop
Who owns 180 Bethel Loop?
The owner of record in NYC Department of City Planning PLUTO data is Bsc Housing Company, INC..
Does 180 Bethel Loop have violations?
Yes. NYC HPD has recorded 962 housing violations at this property.
Is 180 Bethel Loop rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 180 Bethel Loop built?
City records list 1970 as the year it was built.
How many apartments are in 180 Bethel Loop?
It has 2,926 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.