1325 Pennsylvania Avenue
Brooklyn, NY 11239BBL 3-04452-0020Map
Owner of record: Bsc Housing Company, INC.
1325 Pennsylvania Avenue is an elevator apartment building built in 1972 in Brooklyn, 11239. It has 2,222 residential units across 17 floors. The owner of record is Bsc Housing Company, INC.. HPD has recorded 675 housing violations here, most recently on October 5, 2026. 10 of the 50 most recent violations are still open.
- HPD violations
- 675
- DOB violations
- 345
- ECB violations
- 127
- HPD complaints
- 2,298
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 675
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 6a, 6th story, 1st apartment from north at east
Oct 5, 2026 · Apt 6A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 6a, 6th story, 1st apartment from north at east
Oct 5, 2026 · Apt 6A
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department around door frame in the entrance located at apt 1a, 1st story, 1st apartment from north at east
Sep 15, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sq feet but less than 30sq feet observed around door frame in the entrance located at apt 1a, 1st story, 1st apartment from north at east
Sep 15, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet at east wall in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Sep 15, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Sep 15, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate . in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Sep 15, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Sep 15, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Sep 15, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Sep 15, 2026 · Apt 1A
Open — Civ14 mailed
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and west wall in the bathroom located at apt 5b, 5th story, 2nd apartment from west at north
Aug 20, 2026 · Apt 5B
Closed — Violation closed - BHazardous
Repair the broken or defective connection at waste line at sink in the kitchen located at apt 12e, 12th story, 1st apartment from west at north
Jul 6, 2026 · Apt 12E
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 15c, 15th story, 1st apartment from east at south
Jul 5, 2026 · Apt 15C
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 15c, 15th story, 1st apartment from east at south
Jul 5, 2026 · Apt 15C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch, compactor closet at public hall, 5th story
Jun 8, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 9h, 9th story, 1st apartment from west at north , section at south
Jun 7, 2026 · Apt 9H
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 9h, 9th story, 1st apartment from west at north , section at south
Jun 7, 2026 · Apt 9H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 9h, 9th story, 1st apartment from west at north , section at south
Jun 7, 2026 · Apt 9H
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east
Apr 11, 2026 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 3b, 3rd story, 2nd apartment from west at north
Feb 19, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 4b, 4th story, 2nd apartment from west at north
Feb 19, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft at west and south wall in the private hallway located at apt 9h, 9th story, 1st apartment from west at north , section ''south'' original violation 18645306 issued 14-feb-26 has been upgraded to class c per administrative code 27-2017.3a(5)(a) or (b).
Feb 14, 2026 · Apt 9H
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft at west and south wall in the private hallway located at apt 9h, 9th story, 1st apartment from west at north , section ''south''
Feb 14, 2026 · Apt 9H
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 9h, 9th story, 1st apartment from west at north , section ''south''
Feb 14, 2026 · Apt 9H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 9h, 9th story, 1st apartment from west at north , section ''south''
Feb 14, 2026 · Apt 9H
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Feb 6, 2026
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling in the bathroom located at apt 16b, 16th story, 2nd apartment from east at south original violation 18569056 issued 14-jan-26 has been upgraded to class c per administrative code 27-2017.3a(5)(a) or (b).
Jan 14, 2026 · Apt 16B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 2nd apartment from west at north
Jan 14, 2026 · Apt 5B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling in the bathroom located at apt 16b, 16th story, 2nd apartment from east at south
Jan 14, 2026 · Apt 16B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 5b, 5th story, 2nd apartment from west at north
Jan 14, 2026 · Apt 5B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 16b, 16th story, 2nd apartment from east at south
Jan 7, 2026 · Apt 16B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north and west wall in the 1st bathroom from north located at apt 6g, 6th story, 1st apartment from west at north
Nov 28, 2025 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the 1st bathroom from north located at apt 6g, 6th story, 1st apartment from west at north
Nov 28, 2025 · Apt 6G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from north located at apt 12g, 12th story, 1st apartment from south at west
Nov 12, 2025 · Apt 12G
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 12g, 12th story, 1st apartment from south at west
Nov 12, 2025 · Apt 12G
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 12g, 12th story, 1st apartment from south at west
Nov 12, 2025 · Apt 12G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 12g, 12th story, 1st apartment from south at west
Nov 12, 2025 · Apt 12G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 12g, 12th story, 1st apartment from south at west
Nov 12, 2025 · Apt 12G
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 12g, 12th story, 1st apartment from south at west
Nov 12, 2025 · Apt 12G
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 12g, 12th story, 1st apartment from south at west
Nov 12, 2025 · Apt 12G
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at west at boiler room
Nov 12, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 12g, 12th story, 1st apartment from south at west
Nov 12, 2025 · Apt 12G
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 12g, 12th story, 1st apartment from south at west
Nov 12, 2025 · Apt 12G
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the 5th room from east at north located at apt 9g, 9th story, 1st apartment from south at west
Nov 8, 2025 · Apt 9G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 5th room from east at north located at apt 9g, 9th story, 1st apartment from south at west
Nov 8, 2025 · Apt 9G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd bathroom from east located at apt 9g, 9th story, 1st apartment from south at west
Nov 8, 2025 · Apt 9G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the 2nd bathroom from east located at apt 9g, 9th story, 1st apartment from south at west
Nov 8, 2025 · Apt 9G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 9g, 9th story, 1st apartment from east at south
Nov 3, 2025 · Apt 9G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and west wall in the bathroom located at apt 9g, 9th story, 1st apartment from east at south
Nov 3, 2025 · Apt 9G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 7f, 7th story, 2nd apartment from west at north
Oct 20, 2025 · Apt 7F
Closed — Violation dismissed
DOB building violations · 345
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2023
Dob violation - dismissed - Construction other optional
Emergency work order due to the defective in facade. immed install completely safety measures at exp1,2,and3(south, west and north elev) adequate to the building measures. install safety measures should be in five days. remedy: immed provide adequate safety measures to secure the public at exp 1,2 and 3
Jun 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2022
Dob violation - dismissed
Show 40 more ↓
- Construction other optional
Partial vacate-observed on 04/22/2022 there are cracks/spalling on balcony slab on the 3fl at exp 2 west elevation. also observed are damaged , broken, loose balustrade on the same balcony on the 6fl west elevation at apr 6a & 6b. due to these conditions the balcony for apt 6a & 6b to be vacated. remedy: vacate balcony for apt 6a and 6b
Apr 22, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 24, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 24, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 13, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed
ECB violations · 127
- Class - 2
1) the phone in the car rang out but nobody answered the phone. 2) remove the wood from the motor-room window (everything must have a 2 hour fire rating).
Mar 30, 2026 · Penalty $625
Active - Class - 2
Failure to comply with commissioner's order contained in summons #39041046j issued on 5/12/2021, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable certi
May 15, 2024 · Penalty $1,250
Resolve - Class - 2
Noted: avoid interference: at time of inspection, it was noticed that the installation of the sidewalk shed hindered the visibility of traffic signs, resulting in them being partially obscured and not fully vis
Aug 5, 2023 · Penalty $1,250
Resolve - Class - 1
At time of my inspection i observed in the laundry room new gas dryers installed under laa b00633150, register and replace gas dryers is not allowed on an laa 3 families or over and 4 stories or over. 100% of t
Jul 15, 2022
Resolve - Class - 1
At time of my inspection i observed in the laundry room new gas dryers installed under laa b00632323, register and replace gas dryers is not allowed on an laa 3 families or over and 4 stories or over. 100% of t
Jul 15, 2022
Resolve - Class - 1
At time of my inspection i observed in the laundry room new gas dryers installed under laa b00630418, register and replace gas dryers is not allowed on an laa 3 families or over and 4 stories or over. 100% of t
Jul 15, 2022
Resolve - Class - 1
At time of my inspection i observed in the laundry room new gas dryers installed under laa b00630286, register and replace gas dryers is not allowed on an laa 3 families or over and 4 stories or over. 100% of t
Jul 15, 2022
Resolve - Class - 1
At time of my inspection i observed in the laundry room new gas dryers installed under laa b00630430, register and replace gas dryers is not allowed on an laa 3 families or over and 4 stories or over. 100% of t
Jul 15, 2022
Resolve - Class - 1
Failure to maintain exterior building walls and appurtenances.as notedat time of inspection i observed on exposure#1 south elevation-broken window pane on 5th floor south east end;spalling masonry on 4th floor
Apr 22, 2022 · Penalty $2,500
Resolve - Class - 2
At apartment 9g balcony door inaccessible , door locking device inoperable., repair and/or replace
Aug 27, 2021 · Penalty $3,125
Active
Show 40 more ↓
- Class - 2
Repair phone. expired fire extinguisher
May 17, 2021 · Penalty $655
Resolve - Class - 2
Repair phone.
May 13, 2021 · Penalty $655
Resolve - Class - 2
Shorten hoist ropes. seal hoist machine leaks
May 13, 2021 · Penalty $655
Resolve - Class - 2
Shorten hoist ropes
May 12, 2021 · Penalty $625
Resolve - Class - 2
Seal hoist machine leaks
May 12, 2021 · Penalty $310
Resolve - Class - 2
Shorten hoist ropes. seal hoist machine leaks
May 12, 2021 · Penalty $655
Resolve - Class - 2
Shorten hoist ropes
May 11, 2021 · Penalty $655
Resolve - Class - 2
Seal hoist machine leaks. oil onto brake drum
May 11, 2021 · Penalty $655
Resolve - Class - 2
Shorten hoist ropes
May 10, 2021 · Penalty $655
Resolve - Class - 2
Main line can be opened when power on
Sep 13, 2019 · Penalty $1,562
Resolve - Class - 2
Main line can be opened when power on
Sep 13, 2019 · Penalty $1,562
Resolve - Class - 2
Work w/o permit. note: curb cut extended approx 10ft long at front entrance to bldg,making driveway widen than existing curb cut. remedy: obtain permit or restore premises to prior legal condition.
Dec 18, 2017 · Penalty $830
Active - Class - 2
Failure to maintain exterior bldg facade and appurtenances as noted exp3 damaged window sill under a/c barely hanging on.spalled brick on various exposures.rmdy: maintain exterior bldg masonry facade,provide
Jun 29, 2017 · Penalty $500
Resolve - Class - 2
Failure to maintain exterior bldg walls note: at time of inspeciton i observed on exp#1 east elevation on exp#2 south elevation; exp#3 west elevation and exp#4 north elevation. spalled facade blocks at various
Jun 29, 2017 · Penalty $500
Resolve - Class - 2
Failure to maintain exterior bldg facade and appurtenances as noted exp3 plant boxes hanging over side of balcon railing. rmdy: maintain exterior masonry facade provide safety measures, repair damaged facade
Jun 29, 2017 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. east elevation exp #1 noted at time of inspection, flower plant pots and planters hung ont eh outside of balcony railings on 7th and 8th floor
Jun 27, 2017 · Penalty $500
Resolve - Class - 2
28-317.3 failure to register cooling tower. rmdy: comply w/code.
Sep 21, 2015 · Penalty $4,000
Resolve - Class - 2
28-317.3 failure to register cooling tower. rmdy: comply w/code.
Sep 21, 2015
Resolve - Class - 2
58,h,10-58h play in worm/gear.
Feb 16, 2010
Resolve - Class - 2
Fail to file amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. file amended report following remedial pairs of the subjec
Dec 19, 2008
Resolve - Non-hazardous
86bb05.51b14
Mar 8, 2008
Resolve - Non-hazardous
51b14
Mar 8, 2008 · Penalty $350
Resolve - Hazardous
12q03.60t07.41r09.66o02. 60t-provi co sticker 41r-remove bypass switch
Feb 1, 2008
Resolve - Hazardous
12q03.60t07.41r09.55y13.39y0266o02. 12q-cab lights unguarded 60t-provide co. info 41r-remove bypass switches 55y-seal leaks 39y-oil on mr fl66o-clean pit
Feb 1, 2008
Resolve - Non-hazardous
39-h-10,14-m-11,52-h-11/52-brake pads
May 8, 2006 · Penalty $180
Resolve - Non-hazardous
83x10. 83x-repair x restore to service
Aug 31, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to submit a fifth round techincal report:periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998and the department of bldg rules and regulations.remedy:file the req
Jan 23, 2004 · Penalty $2,500
Resolve - Non-hazardous
Failure to submit a fifth round techincal report:periodic inspection of exterior walls and appurtenances as a required by local law 11 of 1998 and the department of bldg rules and regulations.remedy:file the
Jan 23, 2004 · Penalty $700
Resolve - Non-hazardous
Failure to submit a fifth round techincal report:periodic inspection of exterior walls and appurtenances as requried by local law 11 of 1998 and the department of bldg rules and regulations.remedy:file the
Jan 23, 2004 · Penalty $700
Resolve - Non-hazardous
10h12. (10) replace lobby door gibs.
Nov 20, 2002 · Penalty $350
Resolve - Non-hazardous
08i12-25h12. (08) replace car saddle, (25) replace hanger roller.
Nov 20, 2002 · Penalty $350
Resolve - Non-hazardous
74x*. 74x- fire service phase #.
Apr 13, 2000 · Penalty $2,500
Resolve - Non-hazardous
74y*. 74y- fire service phase ii inoperative.
Apr 13, 2000 · Penalty $2,500
Resolve - Non-hazardous
74x*, fire service phase 2 inoperative
Apr 12, 2000 · Penalty $350
Resolve - Non-hazardous
74x*, fire service phase 2 inoperative
Apr 12, 2000 · Penalty $350
Resolve - Non-hazardous
74x*, fire service phase 2 inoperative
Apr 12, 2000 · Penalty $350
Resolve - Non-hazardous
74x*, fire service phase 2 inoperative
Apr 12, 2000 · Penalty $350
Resolve - Non-hazardous
74x*, fire service phase 2 inoperative
Apr 12, 2000 · Penalty $350
Resolve - Non-hazardous
74x*, fire service phase 2 inoperative
Apr 12, 2000 · Penalty $350
Resolve - Non-hazardous
74x*, (74)fire service phase 2 in operative
Apr 5, 2000 · Penalty $350
Resolve
Complaints
- Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Open - Heat/hot water
Apartment only
Oct 20, 2026 · Apt 6D
Open - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Plumbing
Basin/sink
Oct 14, 2026 · Apt 8H
Close - General
Bell/buzzer/intercom
Oct 5, 2026 · Apt 13B
Open - Plumbing
Bathtub/shower
Sep 14, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Sep 14, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Sep 14, 2026 · Apt 1A
Close - Plumbing
Basin/sink
Sep 14, 2026 · Apt 1A
Close
Show 40 more ↓
- Plumbing
Water supply
Sep 10, 2026 · Apt 11D
Close - Unsanitary condition
Garbage/recycling storage
Aug 17, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Aug 14, 2026 · Apt 13B
Close - Paint/plaster
Window/frame
Aug 8, 2026 · Apt 5B
Close - Unsanitary condition
Mold
Aug 8, 2026 · Apt 5B
Close - Water leak
Slow leak
Aug 5, 2026 · Apt 10A
Close - Flooring/stairs
Floor
Aug 5, 2026 · Apt 10A
Close - Paint/plaster
Wall
Aug 5, 2026 · Apt 10A
Close - Paint/plaster
Ceiling
Aug 5, 2026 · Apt 10A
Close - Unsanitary condition
Mold
Aug 5, 2026 · Apt 10A
Close - Unsanitary condition
Mold
Jul 30, 2026 · Apt 5B
Close - Electric
Lighting
Jul 11, 2026 · Apt 1C
Close - Paint/plaster
Wall
Jul 11, 2026 · Apt 1C
Close - Plumbing
Basin/sink
Jul 11, 2026 · Apt 1C
Close - Plumbing
Water supply
Jul 5, 2026 · Apt H4
Close - Plumbing
Water supply
Jul 5, 2026 · Apt 2C
Close - Plumbing
Water supply
Jul 5, 2026 · Apt 5E
Close - Plumbing
Toilet
Jul 5, 2026 · Apt 11H
Open - Plumbing
Water supply
Jul 5, 2026 · Apt 11H
Open - Plumbing
Water supply
Jul 5, 2026 · Apt 10E
Close - Plumbing
Water supply
Jul 5, 2026 · Apt 9F
Close - Plumbing
Water supply
Jul 5, 2026 · Apt 11B
Close - Plumbing
Water supply
Jul 5, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 5, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 5, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 5, 2026 · Apt 7C
Close - Plumbing
Water supply
Jul 5, 2026 · Apt 7C
Close - Plumbing
Water supply
Jul 5, 2026 · Apt 12E
Close - Plumbing
Water supply
Jul 4, 2026 · Apt 8E
Close - Plumbing
Water supply
Jul 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 4, 2026 · Apt 12E
Close - Plumbing
Water supply
Jul 4, 2026 · Apt 7G
Close - Plumbing
Water supply
Jul 4, 2026 · Apt 17C
Close - Unsanitary condition
Mold
Jun 13, 2026 · Apt 6A
Close - Outside building
Skylight
Jun 3, 2026 · Apt 7H
Close - Flooring/stairs
Floor
May 18, 2026 · Apt 16D
Close - Paint/plaster
Wall
May 18, 2026 · Apt 16D
Close - Plumbing
Radiator
May 18, 2026 · Apt 16D
Close - Electric
Lighting
May 18, 2026 · Apt 16D
Close - Heat/hot water
Entire building
May 7, 2026 · Apt 6B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1972
- Floors
- 17
- Residential units
- 2,222
- Building area
- 1,485,000 ft²
- Lot area
- 883,293 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 42
- Block / lot
- 4452 / 20
- Assessed value
- $63,813,600
- Landmark / historic district
- No
HPD registration #374612, last renewed Sep 18, 2025.
Questions about 1325 Pennsylvania Avenue
Who owns 1325 Pennsylvania Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bsc Housing Company, INC..
Does 1325 Pennsylvania Avenue have violations?
Yes. NYC HPD has recorded 675 housing violations at this property.
Is 1325 Pennsylvania Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1325 Pennsylvania Avenue built?
City records list 1972 as the year it was built.
How many apartments are in 1325 Pennsylvania Avenue?
It has 2,222 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.