655 Hemlock Street
Brooklyn, NY 11208BBL 3-04269-0015Map
Owner of record: Orville Blythe
655 Hemlock Street is a walk-up apartment building built in 1930 in Brooklyn, 11208. It has 4 residential units across 2 floors. The owner of record is Orville Blythe. HPD has recorded 40 housing violations here, most recently on August 26, 2025. 2 of the 40 most recent violations are still open.
- HPD violations
- 40
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 2
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 40
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Aug 26, 2025 · Apt 2A
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and all ceilings in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Aug 26, 2025 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Aug 26, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story
Aug 26, 2025
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles at vestibule at public hall, 1st story
Aug 26, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Dec 8, 2023 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Oct 12, 2023 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Oct 12, 2023 · Apt 2A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective water supply pipe at water closet in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
Oct 12, 2023 · Apt 2A
Closed — Violation closed
Show 30 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
Oct 12, 2023 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the 2nd room from east located at apt 2a, 2nd story, 1st apartment from south at west
Oct 12, 2023 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the 3rd room from east located at apt 2a, 2nd story, 1st apartment from south at west
Oct 12, 2023 · Apt 2A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell/buzzer system in the entire apartment located at apt 2a, 2nd story, apartment at west
Aug 30, 2017 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls and the ceiling in the kitchen located at apt 2a, 2nd story, apartment at west
Aug 30, 2017 · Apt 2A
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of scuttle hatch opening nailed shut, blocking. means of egress at public hall, 2nd story
Aug 24, 2015
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder lock metal gate at building entrance
Jan 12, 2002
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective plasterboard ceiling northeast room 1 sty apt 1fl. , section '' ''
Dec 21, 1998 · Apt 1FL
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective water damaged sink base wood cabinet kitchen 1 sty apt 1fl. , section '' ''
Dec 21, 1998 · Apt 1FL
Closed — Violation closed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceilings thru out 1 sty apt 1fl. , section '' ''
Dec 21, 1998 · Apt 1FL
Closed — Violation closed - BHazardous
D26-13.03 adm code abate the nuisance consisting of vermin mice and roaches kitchen and bathromm 1 sty apt.
Aug 3, 1990
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code refit bathroom door 1 sty apt.
Aug 3, 1990
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls and clg pvt hall 1 sty apt.
Aug 3, 1990
Closed — Violation closed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling installed all rooms 1 sty apt 1 , section '' ''
Aug 3, 1990 · Apt 1
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective masonry coping of parapet wall roof front.
Jul 27, 1990
Closed — Violation closed - BHazardous
D26-10.01 adm code make safe by properly repairing the structural defect out of plumb brick parapet wall roof front.
Jul 27, 1990
Closed — Violation closed - BHazardous
D26-10.01 adm code make safe by properly repairing the structural defect out of plumb & hanging brick parapet wall roof front.
Jul 27, 1990
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective masonry sill 2 sty north window front.
Jul 27, 1990
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair the broken or defective eroded mortar joints of brickwork front wall 2 sty.
Jul 27, 1990
Closed — Violation closed - ANon-hazardous
Section 62 m/d law rearrange television and/or radio antenna to be at least 10 feet above roof and not attached to any fire escape or soil or vent line roof front & center
Jul 27, 1990
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling vestibule and 1 sty public hall
Jul 27, 1990
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors boiler room cellar
Jul 27, 1990
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of excessive storage boiler room cellar
Jul 27, 1990
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections cellar thru out
Jul 27, 1990
Closed — Violation closed - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, cellar rear east
Jul 27, 1990
Closed — Violation closed - ANon-hazardous
Repair the broken or defective rain leader rear yard
Jul 27, 1990
Closed — Violation closed - ANon-hazardous
Paint to the satisfaction of this department the exterior window frames and sashes front and rear all stys all sides
Jul 27, 1990
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of wood panel installed floor to ceiling cellar thru out
Jul 27, 1990
Closed — Violation closed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling installed cellar thru out
Jul 27, 1990
Closed — Violation closed
DOB building violations · 1
- Construction other optional
Ecb hazardous
Sep 6, 2001
Dob violation - active
ECB violations · 1
- Hazardous
Failure to provide adequate protection for side walk and walkways during construction operation removal of brock work at roof over front entrance without providing protection to the public suggested remedy stop
Sep 6, 2001
Resolve
Complaints
- Paint/plaster
Wall
Sep 26, 2017 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 9, 2015 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1930
- Floors
- 2
- Residential units
- 4
- Building area
- 2,583 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 42
- Block / lot
- 4269 / 15
- Assessed value
- $193,950
- Landmark / historic district
- No
HPD registration #312045, last renewed Aug 13, 2025.
Questions about 655 Hemlock Street
Who owns 655 Hemlock Street?
The owner of record in NYC Department of City Planning PLUTO data is Orville Blythe.
Does 655 Hemlock Street have violations?
Yes. NYC HPD has recorded 40 housing violations at this property.
Is 655 Hemlock Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 655 Hemlock Street built?
City records list 1930 as the year it was built.
How many apartments are in 655 Hemlock Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.