192 Fountain Avenue
Brooklyn, NY 11208BBL 3-04209-0029Map
Owner of record: Echevarria, Ellis Ive
192 Fountain Avenue is an one-family home built in 1920 in Brooklyn, 11208. It has 1 residential unit across 2 floors. The owner of record is Echevarria, Ellis Ive. HPD has recorded 46 housing violations here, most recently on August 23, 2005. 46 of the 46 most recent violations are still open.
- HPD violations
- 46
- DOB violations
- 2
- ECB violations
- 0
- HPD complaints
- 0
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 46
- BHazardous
Replace with new the missing ceramic tile walls at bathtub bathroom 1st level apt. #1.
Aug 23, 2005
Open — Nov sent out - BHazardous
Replace with new the missing shower handle shower assembly, bathtub bathroom, apt. 1.
Aug 23, 2005
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom 1 sty. apt. 1. er-1.
Aug 23, 2005
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling front room,1st story apt.
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective water supply pipe north west wall,cellar rear.
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Abate the nuisance consisting of floor out of level approx 3 inches kitchen, 1st story apt.
Sep 14, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective steam radiator front room, 1st story apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls & ceiling throughout, 1st and 2nd story apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice & roaches, 1st story apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plaster board ceiling cellar rear.
Sep 14, 2004
Open — Nov sent out
Show 36 more ↓
- ANon-hazardous
Properly secure the loose water supply pipe shower bathtub bathroom, 1st story apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls throughout 1st story level apt. 1.
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall east room attic story building.
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls south west room, 1st story apt.
Sep 14, 2004
Open — Nov sent out - BHazardous
Replace with new the missing ceramic tiles, floor bathroom, 1st level apt. 1.
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Replace with new the missing ceramic tiles floor bathroom, 1st story apt.
Sep 14, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixtures ceiling, apt throughout apt. 1.
Sep 14, 2004
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective water supply pipe hot and cold water supply lines, under sink kitchen, apt. 1
Sep 14, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice thru/out 1 story duplex apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls front room 2nd. story duplex apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective connection drain pipe to sink kitchen 1 sty duplex apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass lower sashes window front room and center room 1st. story duplex apt. 1.
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Abate the nuisance consisting of concealed water leak ceiling front room and kitchen 1st sty duplex apt. 1.
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Replace with new the missing wood trim at south wall and ceiling closet area center room 1st sty. duplex apt. 1.
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling thru/ out duplex apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste pipe to wash basin bathroom, 1st story apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective cabinet at sink kitchen, 1st story apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice throughout, 1st story apt 1.
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling bathroom, 1st story apt 1.
Sep 14, 2004
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection locknut at wash line of wash basin, in 1st story apt 1, bathroom.
Sep 14, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceiling tiles in south west room, of 1st story of duplex house.
Sep 14, 2004
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in kitchen of duplex dwelling.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste pipe of wash hand basin in bathroom of duplex house.
Sep 14, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tles in bathroom of duplex house.
Sep 14, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sheet rock ceiling at basement rear.
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Abate the nuisance consisting of concealed leak ceiling front room of 1st story of duplex dwelling.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls throughout, 2nd floor level apt. 1.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls, ceiling and closet,all rooms, 1st and 2nd story apt building.
Sep 14, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixtures all rooms, 2nd story apt.,
Sep 14, 2004
Open — Nov sent out - CImmediately hazardous
Abate the nuisnace consisting of rodents evidence of rats excreta cellar rear.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the wasteline sink kitchen 1st sty. apt. 1
Sep 14, 2004
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective water supply pipe under sink kitchen, 1st story apt.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak south west room, of 1st story of duplex.
Sep 14, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling of front room on 2nd story of duplex dwelling.
Sep 14, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed leak ceiling center west room, of 1st story duplex dwelling.
Sep 14, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed leak ceiling,basement rear.
Sep 14, 2004
Open — Nov sent out
DOB building violations · 2
- Construction other optional
Failure to maintain building remedy; make all necessary repairs
Aug 7, 2009
Dob violation - active - Construction other optional
C-construction other optional
Aug 10, 2007
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- One-family home (A9)
- Year built
- 1920
- Floors
- 2
- Residential units
- 1
- Building area
- 1,113 ft²
- Lot area
- 2,000 ft²
- Zoning
- R5B
- Community board
- 305
- Council district
- 42
- Block / lot
- 4209 / 29
- Assessed value
- $37,500
- Landmark / historic district
- No
Questions about 192 Fountain Avenue
Who owns 192 Fountain Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Echevarria, Ellis Ive.
Does 192 Fountain Avenue have violations?
Yes. NYC HPD has recorded 46 housing violations at this property.
Is 192 Fountain Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 192 Fountain Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 192 Fountain Avenue?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.