1217 Liberty Avenue
Brooklyn, NY 11208BBL 3-04184-0062Map
Owner of record: Ranaping Properties LLC
1217 Liberty Avenue is a mixed residential and retail building built in 1920 in Brooklyn, 11208. It has 2 residential units across 3 floors. The owner of record is Ranaping Properties LLC. HPD has recorded 32 housing violations here, most recently on April 24, 2026. 23 of the 32 most recent violations are still open.
- HPD violations
- 32
- DOB violations
- 42
- ECB violations
- 7
- HPD complaints
- 8
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 32
- ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel glazing at interior of bathtub in the bathroom located at apt 3rdfl, 3rd story, 1st apartment from north at east
Apr 24, 2026 · Apt 3RDFL
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective as required by nspire nfpa standard 72 in the private hallway located at apt 3rdfl, 3rd story, 1st apartment from north at east
Apr 24, 2026 · Apt 3RDFL
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective latch assembly at building front entrance door , 1st story
Apr 24, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective handrail at public hall, 1st story
Jun 10, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east and west walls in the private hallway located at apt 1, 2nd story, 1st apartment from north at east
Nov 29, 2022 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1, 2nd story, 1st apartment from north at east
Nov 29, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall in the 4th room from north located at apt 1, 2nd story, 1st apartment from north at east
Nov 29, 2022 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door at entrance in the 4th room from north located at apt 1, 2nd story, 1st apartment from north at east
Nov 29, 2022 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Nov 29, 2022 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing metal cover at baseboard radiator in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Nov 29, 2022 · Apt 1
Open — Nov sent out
Show 22 more ↓
- BHazardous
Properly repair the broken or defective locking device at entrance door in the 2nd room from north at east located at apt 1, 2nd story, 1st apartment from north at east
Nov 29, 2022 · Apt 1
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 16, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 16, 2022
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling at public hall, 3rd story
Sep 16, 2022
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Sep 16, 2022
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west
Apr 15, 2022 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood at floor in the private hallway located at apt 1, 2nd story, 1st apartment from south at west
Apr 15, 2022 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color .. in the kitchen located at apt 1, 2nd story, 1st apartment from south at west
Apr 15, 2022 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood sink base cabinet countertop in the kitchen located at apt 1, 2nd story, 1st apartment from south at west
Apr 15, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color .. east wall, west wall in the private hallway located at apt 1, 2nd story, 1st apartment from south at west
Apr 15, 2022 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color .. north wall, west wall, south wall, east wall in the 4th room from north located at apt 1, 2nd story, 1st apartment from south at west
Apr 15, 2022 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color .. north wall, south wall in the 5th room from north located at apt 1, 2nd story, 1st apartment from south at west
Apr 15, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the 2nd bathroom from north located at apt 1, 2nd story, 1st apartment from south at west
Apr 15, 2022 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from north, the 4th room from north, the 2nd room from north, the private hallway , the kitchen located at apt 1, 2nd story, 1st apartment from south at west
Apr 15, 2022 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor , at public hall, 1st story
Jul 16, 2021
Closed — Violation closed - BHazardous
And department rules and regulations: remove the encumbrance obstructing egress from fire escapes the storage of a heavy flower pot at balcony , building front at fire escape, 3rd story
Jul 16, 2021
Open — Not complied with - BHazardous
Properly secure the loose and cracked wood cap , above newel post ,at balustrade, at public hall stairs, 2nd story
Jul 16, 2021
Open — Not complied with - BHazardous
Properly repair the broken or defective mortise locking device at entrance to building at public hall, 1st story
Jul 16, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1fl, 2nd story, 1st apartment from north at east
May 13, 2021 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective - light fixture kitchen front room and front west room. 2 sty. apt.
Jul 5, 2005
Open — Nov sent out - BHazardous
Properly repair the broken or defective wall switch kitchen & 2 sty. apt. 1.
Aug 13, 2004
Open — Nov sent out - BHazardous
§ 27-2032, 2034 adnim. code: discontinue use of illegal space and/or hot water heater and provide filed for & approved heater which obtains combustion air directly from outside the building or approved central system gas hot water heater kitchen 2 sty. apt. 1.
Aug 13, 2004
Open — Nov sent out
DOB building violations · 42
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed
Show 32 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35346256j issued on 7/27/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for work w/o a permit:busi
Mar 19, 2019
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35346256j issued on 7/27/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. work w/o a permit. noted:i
Jan 4, 2019
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35346256j issued on 7/27/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. erected illegal illuminate
Nov 29, 2018
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35346256j issued on 7/27/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. note:no document file for
Oct 16, 2018
Resolve - Class - 1
Work w/out a permit noted:@exp#1 (front) 1st fl.erected/installed (cd)illuminated business sign reading "halal meat market" w/electrical work/wiring preformed for illuminated sign.rem:obatin required permits.
Jul 27, 2018
Resolve - Hazardous
19b-49a-49b-49c 49a flu pipe not sealed at breeching(steam boiler on left side)49b no check valve(back flow preventer)on boiler feed line 49c blow down value on 67 low watercutoff defective
May 23, 2001 · Penalty $800
Resolve - Hazardous
4a-19b-19a 49a flu pipe not sealed at breaching(hydronic boiler rightside)49b no check valve(back flow preventer on boilr feed line
May 23, 2001 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Pests
Mar 20, 2026 · Apt 2F
Close - Unsanitary condition
Pests
Mar 20, 2026 · Apt 2F
Close - Unsanitary condition
Pests
Mar 13, 2026 · Apt 2F
Close - Heat/hot water
Entire building
Nov 22, 2022 · Apt BLDG
Close - Plumbing
Basin/sink
Apr 12, 2022 · Apt 1
Close - Plumbing
Toilet
Jul 14, 2021 · Apt 2
Close - Flooring/stairs
Floor
May 11, 2021 · Apt 1FL
Close - Flooring/stairs
Floor
May 11, 2021 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1920
- Floors
- 3
- Residential units
- 2
- Building area
- 3,300 ft²
- Lot area
- 2,252 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 37
- Block / lot
- 4184 / 62
- Assessed value
- $57,600
- Landmark / historic district
- No
HPD registration #823050, last renewed Jul 15, 2025.
Questions about 1217 Liberty Avenue
Who owns 1217 Liberty Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Ranaping Properties LLC.
Does 1217 Liberty Avenue have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 1217 Liberty Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1217 Liberty Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 1217 Liberty Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.