310 Hemlock Street
Brooklyn, NY 11208BBL 3-04147-0065Map
Owner of record: Sayeeda Akther
310 Hemlock Street is a walk-up apartment building built in 1910 in Brooklyn, 11208. It has 3 residential units across 2 floors. The owner of record is Sayeeda Akther. HPD has recorded 57 housing violations here, most recently on October 10, 2025. 17 of the 50 most recent violations are still open.
- HPD violations
- 57
- DOB violations
- 1
- ECB violations
- 6
- HPD complaints
- 44
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 57
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south
Oct 10, 2025 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the 1st room from east at north located at apt 2ndfl, 2nd story, 1st apartment from east at south
Oct 10, 2025 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east at south located at apt 2ndfl, 2nd story, 1st apartment from east at south
Oct 10, 2025 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndfl, 2nd story, 1st apartment from east at south
Oct 10, 2025 · Apt 2NDFL
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south original violation 18288987 issued 10-oct-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Oct 10, 2025 · Apt 2NDFL
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from east at south
Oct 10, 2025 · Apt 2NDFL
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2ndfl, 2nd story, 1st apartment from east at south
Oct 10, 2025 · Apt 2NDFL
Open — Nov certified late - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2ndfl, 2nd story, 1st apartment from east at south
Oct 10, 2025 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall south wall in the 1st room from east at north located at apt 2ndfl, 2nd story, 1st apartment from east at south
Oct 10, 2025 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall east wall in the 1st room from east at south located at apt 2ndfl, 2nd story, 1st apartment from east at south
Oct 10, 2025 · Apt 2NDFL
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 2ndfl, 2nd story, 1st apartment from east at south
Oct 10, 2025 · Apt 2NDFL
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 3, 2025
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 2, 2025 · Apt 2NDFLO
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door frame in the 3rd room from east at south located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 2, 2025 · Apt 2NDFLO
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 2, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective air vent at ceiling in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 2, 2025 · Apt 2NDFLO
Open — Nov certified late - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door in the 3rd room from east at south located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 2, 2025 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 2, 2025 · Apt 2NDFLO
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 2, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from east at south original violation 18270589 issued 02-oct-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Oct 2, 2025 · Apt 2NDFLO
Open — First no access to re- inspect violation - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt floor2, 2nd story, 1st apartment from south at west
Sep 29, 2025 · Apt FLOOR2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jan 13, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jan 13, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jan 13, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at upper and lower sash at window in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Aug 19, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance at upper and lower sash at window in the 3rd room from east at north located at apt fl2, 2nd story, 1st apartment from east at south
Aug 19, 2024 · Apt FL2
Closed — Violation closed - BHazardous
Replace with new the missing outlet cover at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Aug 19, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at east located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2024 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2024 · Apt 1
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or gates from window to fire escape lockable padlock at gate , 2nd window from west at north in the 1st room from north at west located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from north at east located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2024 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and west wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jun 30, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jun 30, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall, 1st door from north at east wall, 1st window frame from south at west wall in the 3rd room from east at south located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, 1st closet from north at east wall ceiling, 1st closet from north at east wall wall, 1st closet from north at east wall baseboard, 1st door frame from east at south wall, 1st door frame from north at east wall, 1st window frame from south at west wall in the 3rd room from east at north located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall in the kitchen located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east at north located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall, 1st window frame from east at south wall in the bathroom located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall, 1st radiator from east at south wall in the bathroom located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east at south located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall, baseboard at south wall in the 3rd room from east at south located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, north wall, ceiling in the bathroom located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on door in the entrance located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical switch wires at north wall in the bathroom located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 1floor, 1st story, 1st apartment from east at south
Feb 27, 2024 · Apt 1FLOOR
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 3rd room from north at west located at apt 2, 2nd story, 1st apartment from north at east
Jan 3, 2023 · Apt 2
Closed — Violation closed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed
ECB violations · 6
- Class - 1
Work without a permit.at the time of inspection a class a apartment observed created at basement level with walls and partitions installed giving rise to 2bedrooms a 3 piece bathroom,a kitchen fitted with gas s
Oct 22, 2019
Resolve - Class - 2
Residence converted maintained or occupied as a dwelling for more than the legally approved number of families authorized by the c of o or the offical records.at time of my inspection a class a apartment observ
Oct 22, 2019 · Penalty $1,250
Active - Class - 1
Failure to comply with the commissioners order contained in summons/violation#35302889p issued on 02/12/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit.not
Apr 21, 2018
Resolve - Class - 2
Residence altered as a dwelling for more than the number of families legally authorized by the cofo or dob recods. cofo #3p0008763 indicates 2 family dwelling basement (boiler room storage) 1st and 2nd flrs.
Feb 12, 2018 · Penalty $1,200
Active - Class - 1
Work w/o a permit. at basement level erected full height partitions to create bedroom and bathroom installed water and waste lines for 3pc bathrom toilet,sink,shower) residential sink. installed gas line
Feb 12, 2018
Resolve - Class - 3
Work w/o a permit.work noted observed at rear of premises at first (1st flr)level wood deck is created apprx 15'wide x 30'long. rmdy:makesite safe obtain permits and approvals if feasible or restore premises
Oct 22, 2014 · Penalty $200
Active
Complaints
- Safety
Carbon monoxide detector
Oct 6, 2025 · Apt 2NDFL
Close - Unsanitary condition
Mold
Oct 6, 2025 · Apt 2NDFL
Close - Door/window
Door
Oct 6, 2025 · Apt 2NDFL
Close - Paint/plaster
Wall
Oct 6, 2025 · Apt 2NDFL
Close - Plumbing
Steam pipe/riser
Oct 6, 2025 · Apt 2NDFL
Close - Unsanitary condition
Pests
Oct 6, 2025 · Apt 2NDFL
Close - Paint/plaster
Door/frame
Sep 30, 2025 · Apt FLOOR2
Close - Paint/plaster
Wall
Sep 30, 2025 · Apt 2NDFLO
Close - Paint/plaster
Wall
Sep 30, 2025 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Sep 23, 2025 · Apt FLOOR2
Close
Show 34 more ↓
- Unsanitary condition
Pests
Sep 23, 2025 · Apt FLOOR2
Close - Water leak
Heavy flow
Jan 9, 2025 · Apt 1
Close - Door/window
Window frame
Nov 22, 2024 · Apt 2
Close - Door/window
Window frame
Aug 14, 2024 · Apt 2
Close - Door/window
Window pane
Aug 14, 2024 · Apt 2
Close - Paint/plaster
Wall
Jul 26, 2024 · Apt FL2
Close - Electric
Lighting
Jul 26, 2024 · Apt FL2
Close - Door/window
Window frame
Jul 26, 2024 · Apt FL2
Close - Paint/plaster
Wall
Jul 17, 2024 · Apt 1
Close - Safety
Window guard broken/missing
Jul 17, 2024 · Apt 1
Close - Safety
Window guard broken/missing
Jun 26, 2024 · Apt 1
Close - Unsanitary condition
Mold
Feb 23, 2024 · Apt 1FLOOR
Close - Electric
No lighting
Feb 23, 2024 · Apt 1FLOOR
Close - Door/window
Door
Feb 23, 2024 · Apt 1FLOOR
Close - Paint/plaster
Wall
Feb 23, 2024 · Apt 1FLOOR
Close - Door/window
Window frame
Dec 28, 2022 · Apt 2
Close - Plumbing
Radiator
Dec 28, 2022 · Apt 2
Close - Flooring/stairs
Floor
Dec 28, 2022 · Apt 2
Close - Safety
Fire escape
Dec 28, 2022 · Apt 2
Close - Door/window
Window frame
Dec 28, 2022 · Apt 2
Close - Paint/plaster
Wall
Dec 28, 2022 · Apt 2
Close - Door/window
Window frame
Dec 28, 2022 · Apt 2
Close - General
Cabinet
Dec 28, 2022 · Apt 2
Close - Electric
Outlet/switch
Nov 17, 2021 · Apt 2
Close - Heat/hot water
Entire building
Nov 17, 2021 · Apt 2
Close - Unsanitary condition
Pests
Oct 7, 2021 · Apt PH
Close - Unsanitary condition
Pests
Oct 7, 2021 · Apt PH
Close - Unsanitary condition
Pests
Oct 7, 2021 · Apt PH
Close - Electric
Outlet/switch
Oct 7, 2021 · Apt PH
Close - Safety
Carbon monoxide detector
Jan 25, 2018 · Apt BSMNT
Close - Safety
Smoke detector
Jan 25, 2018 · Apt BSMNT
Close - General
Ventilation system
Jan 25, 2018 · Apt BSMNT
Close - Heat/hot water
Apartment only
Nov 20, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Nov 18, 2014 · Apt FL2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1910
- Floors
- 2
- Residential units
- 3
- Building area
- 2,160 ft²
- Lot area
- 2,003 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 37
- Block / lot
- 4147 / 65
- Assessed value
- $57,600
- Landmark / historic district
- No
HPD registration #824801, last renewed Nov 20, 2025.
Questions about 310 Hemlock Street
Who owns 310 Hemlock Street?
The owner of record in NYC Department of City Planning PLUTO data is Sayeeda Akther.
Does 310 Hemlock Street have violations?
Yes. NYC HPD has recorded 57 housing violations at this property.
Is 310 Hemlock Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 310 Hemlock Street built?
City records list 1910 as the year it was built.
How many apartments are in 310 Hemlock Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.