19 Cox Place
Brooklyn, NY 11208BBL 3-04105-0110Map
Owner of record: Jsa Real Estate Holdings INC
19 Cox Place is a walk-up apartment building built in 1925 in Brooklyn, 11208. It has 6 residential units across 3 floors. The owner of record is Jsa Real Estate Holdings INC. HPD has recorded 428 housing violations here, most recently on May 11, 2026. 30 of the 50 most recent violations are still open.
- HPD violations
- 428
- DOB violations
- 19
- ECB violations
- 17
- HPD complaints
- 254
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 428
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
May 11, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule , 1st story
May 11, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
May 11, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at 2nd from west at north wall in the 1st room from north located at apt 2l, 2nd story, 1st apartment from east at south
May 11, 2026 · Apt 2L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and south wall in the 1st room from north located at apt 2l, 2nd story, 1st apartment from east at south
May 11, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north original violation 18574520 issued 16-jan-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jan 16, 2026 · Apt 3R
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Jan 16, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Jan 16, 2026 · Apt 3R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Jan 16, 2026 · Apt 3R
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Dec 24, 2025
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective vestibule door at public hall, 1st story
Dec 24, 2025
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Dec 24, 2025
Open — Nov sent out - ANon-hazardous
Replace with standard wire glass the present glass at bldg front entrance door
Dec 24, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls throughout in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 24, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from south at west
Dec 24, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 24, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 24, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Sep 6, 2025 · Apt 1R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair or replace the broken or defective glass, lower sash at 1st window from south at west in the 3rd room from north located at apt 1r, 1st story, 2nd apartment from east at south
Sep 6, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Sep 6, 2025 · Apt 1R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at entire apt in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Sep 6, 2025 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective latch at building entrance door , 1st story
Jun 22, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective hinges in the entrance located at apt 3r, 3rd story, 2nd apartment from east at south
Jun 22, 2025 · Apt 3R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south original violation 18047182 issued 22-jun-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 22, 2025 · Apt 3R
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south
Jun 22, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south original violation 17899938 issued 16-may-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 16, 2025 · Apt 3R
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 3r, 3rd story, 1st apartment from east at south
May 16, 2025 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3r, 3rd story, 1st apartment from east at south
May 16, 2025 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective hinges in the entrance located at apt 3r, 3rd story, 1st apartment from east at south
May 16, 2025 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door .. in the entrance located at apt 3r, 3rd story, 1st apartment from east at south
May 16, 2025 · Apt 3R
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
May 16, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges to boiler room door at cellar
Dec 18, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 2nd apartment from east at south
Dec 18, 2024 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3r, 3rd story, 2nd apartment from east at south
Dec 18, 2024 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 1l, 1st story
Dec 12, 2024 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Dec 12, 2024 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Dec 12, 2024 · Apt 1L
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed - ANon-hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Feb 21, 2024 · Apt 1L
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Feb 21, 2024 · Apt 1L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceilings and all walls throughout in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Feb 21, 2024 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ; missing at public hall, 1st story
Feb 21, 2024
Open — Not complied with - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Feb 21, 2024 · Apt 1L
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective upper wall cabinet at east wall in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Feb 21, 2024 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective counter balance at lower sash at 1st window from east at south in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Feb 21, 2024 · Apt 1L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector that is defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Feb 1, 2024 · Apt 2L
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Feb 1, 2024 · Apt 2L
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 2l, 2nd story, 1st apartment from east at south
Feb 1, 2024 · Apt 2L
Open — Not complied with
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 11, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 16, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - active
Show 9 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active
ECB violations · 17
- Class - 1
Failure to maintain building in code compliant manner. facade has bulging paneling at all exposures. floor in apartment 1l has sloping in kitchen area., repair and/replace
Dec 18, 2025 · Penalty $25,000
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept. of buildings for violation #39103450m, file a certificate of correction
Dec 18, 2025 · Penalty $6,250
Active - Class - 2
Gsa-300 boiler=no access to chimney base/missing fresh air louver/safety valve not piped down/hwh flue inadequate support;correct violation and submit the certificate of correction
Feb 5, 2024 · Penalty $3,125
Active - Class - 2
Gsa-300 299,000btu date stamp 2013 boiler is installed and operating without a dob permit;correct violation and submit the certificate of correction
Feb 5, 2024 · Penalty $6,250
Active - Class - 1
Failure to maintain building in a code compliant manner. at time of inspection observed 3 story building with walk-up apartments exposure # 3 fire escape blocked with household debris. boxes/cases of beer bottl
Jan 12, 2024 · Penalty $6,250
Active - Class - 2
Failure to comply with the commission order to file a certificate of correction with the department of building for notice of violation # 39064412m issued on 06/18/2022 pursuant to 28-204.4 : noted: violation c
Jan 12, 2024 · Penalty $3,125
Resolve - Class - 1
The exterior has holes in various locations, the siding is bulging in various locations, the floor in apartment 1l is sloping at time of inspection, repair and/replace; repair,replace maintain bulding
Jun 18, 2022 · Penalty $12,500
Active - Class - 1
Failure to maintain building in code compliant manner.at exp1 roof cornice on left side open exposure to element at midsection hole allowingpidgeons come in and out.several mortar are missing.remedy:repair and
Feb 17, 2022 · Penalty $12,500
Active - Class - 1
Failure to maintain bldg in code compliant manner. noted: observed at exp#1 of the bldg at roof level the cornice has several holes throughout. remedy: repair & replace.
Nov 15, 2021 · Penalty $12,500
Active - Class - 1
Failure to maintain building in code-compliant manner.noted:at time ofinspection,observed at exposure 1(front)roof level;the wood cornice has excessive spotting paint,have holes and sections missing in various
Sep 22, 2021 · Penalty $12,500
Active
Show 7 more ↓
- Class - 1
Failure to maintain building in code compliant manner. noted:at time of inspection observed at exp #1 (front of building)roof level; wood cornice has several areas will holes and sections missing in various are
Aug 9, 2021 · Penalty $12,500
Active - Class - 1
Failure to maintain bldg walls or appurtenances. at the time of inspection & observed at exp#1 facade above 3rd fl windows. architectural cornice are in deteriorated condition w/gaps on left side & 2 opening in
Jun 21, 2021 · Penalty $25,000
Active - Class - 1
Failure to maintain bldg walls or appurtenance. note: the wood ornamental cornice new roof is in disrepair w/openings allowing the elements & varmints to enter premises. remedy: maintain bldg exterior walls.
Mar 24, 2021 · Penalty $25,000
Active - Class - 1
Failure to maintain building walls or appurtenances.note the wood framoranment corner is rotting has opening allowing rain water and varmints to enter premise.remedy:maintain building walls.
Dec 8, 2020 · Penalty $12,500
Active - Hazardous
Failure to comply with an order of the commissioner to correct the violating condition of ecb #34480103j in that the fire stopping material in the 1st fl east apt was removed while the bldg was occupied.
Dec 8, 2006 · Penalty $1,500
Resolve - Non-hazardous
No access. violation written based upon no records of correction for ecb #34480103j for wk w/o permit the removal fire stopping @ 1fl east apt while bldg occupied.remedy:comply w/commission obbtain permit.
Jul 22, 2006 · Penalty $1,500
Active - Hazardous
Work without a permit: hazardous work noted: having illegally removed all the fire stopping from the first floor east apartment, while the building is still partially occupied, missing fire stagging also
Jun 9, 2005 · Penalty $800
Resolve
Complaints
- Paint/plaster
Wall
May 4, 2026 · Apt 2L
Close - Door/window
Door
Jan 15, 2026 · Apt BLDG
Close - Door/window
Door to dumbwaiter
Jan 15, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 15, 2026 · Apt 1L
Close - Safety
Smoke detector
Jan 15, 2026 · Apt 1L
Close - Safety
Carbon monoxide detector
Jan 15, 2026 · Apt 1L
Close - Door/window
Door
Jan 15, 2026 · Apt 1L
Close - Heat/hot water
Apartment only
Jan 15, 2026 · Apt 3R
Close - Door/window
Door
Jan 15, 2026 · Apt 3R
Close - Unsanitary condition
Pests
Jan 15, 2026 · Apt 3R
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jan 15, 2026 · Apt 3R
Close - Heat/hot water
Entire building
Nov 19, 2025 · Apt 3
Close - Heat/hot water
Entire building
Nov 14, 2025 · Apt 2L
Close - Electric
Power outage
Sep 4, 2025 · Apt 1R
Close - Appliance
Refrigerator
Sep 4, 2025 · Apt 1R
Close - Unsanitary condition
Pests
Sep 4, 2025 · Apt 1R
Close - Water leak
Slow leak
May 16, 2025 · Apt 3R
Close - Appliance
Electric/gas range
May 16, 2025 · Apt 3R
Close - Paint/plaster
Ceiling
May 16, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Dec 16, 2024 · Apt BLDG
Close - General
Cooking gas
Dec 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2024 · Apt 2L
Close - Door/window
Window frame
Jan 26, 2024 · Apt 2L
Close - Paint/plaster
Window/frame
Jan 26, 2024 · Apt 2L
Close - Heat/hot water
Apartment only
Jan 23, 2024 · Apt 2L
Close - Heat/hot water
Apartment only
Dec 21, 2023 · Apt 2L
Close - Door/window
Window frame
Dec 21, 2023 · Apt 2L
Close - Unsanitary condition
Pests
Dec 21, 2023 · Apt 2L
Close - Paint/plaster
Ceiling
Dec 21, 2023 · Apt 2L
Close - Unsanitary condition
Pests
Dec 21, 2023 · Apt 2L
Close - Heat/hot water
Entire building
Dec 11, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 7, 2023 · Apt 2L
Close - Heat/hot water
Entire building
Dec 22, 2022 · Apt 2L
Close - Door/window
Window frame
Dec 22, 2022 · Apt 2L
Close - Unsanitary condition
Pests
Dec 22, 2022 · Apt 2L
Close - Safety
Window guard broken/missing
Jul 19, 2022 · Apt 2R
Close - Unsanitary condition
Mold
Jun 17, 2022 · Apt 1L
Close - Unsanitary condition
Pests
Jun 17, 2022 · Apt 1L
Close - Plumbing
Basin/sink
Jun 17, 2022 · Apt 1L
Close - Door/window
Window frame
Jun 17, 2022 · Apt 1L
Close - Electric
Outlet/switch
Jun 17, 2022 · Apt 1L
Close - General
Cabinet
Jun 17, 2022 · Apt 1L
Close - Electric
Lighting
Jun 17, 2022 · Apt 1L
Close - Door/window
Window frame
Jan 31, 2022 · Apt 2L
Close - Paint/plaster
Wall
Jan 31, 2022 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1925
- Floors
- 3
- Residential units
- 6
- Building area
- 4,950 ft²
- Lot area
- 3,600 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 37
- Block / lot
- 4105 / 110
- Assessed value
- $309,150
- Landmark / historic district
- No
HPD registration #313105, last renewed Aug 29, 2025.
Questions about 19 Cox Place
Who owns 19 Cox Place?
The owner of record in NYC Department of City Planning PLUTO data is Jsa Real Estate Holdings INC.
Does 19 Cox Place have violations?
Yes. NYC HPD has recorded 428 housing violations at this property.
Is 19 Cox Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 19 Cox Place built?
City records list 1925 as the year it was built.
How many apartments are in 19 Cox Place?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.