571 Van Siclen Avenue
Brooklyn, NY 11207BBL 3-04088-0018Map
Owner of record: Bronx View Realty LLC
571 Van Siclen Avenue is a mixed residential and retail building built in 1901 in Brooklyn, 11207. It has 1 residential unit across 2 floors. The owner of record is Bronx View Realty LLC. HPD has recorded 13 housing violations here, most recently on February 4, 2016. 11 of the 13 most recent violations are still open.
- HPD violations
- 13
- DOB violations
- 20
- ECB violations
- 2
- HPD complaints
- 17
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 13
- BHazardous
Provide electricity in the entire apartment located at apt 2fl, 2nd story
Feb 4, 2016 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit located at apt 2ndfl, 2nd story
Mar 27, 2015 · Apt 2NDFL
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling . in the 1st room from east located at apt flr2, 2nd story
Mar 27, 2015 · Apt FLR2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak .. in the entire apartment located at apt flr2, 2nd story
Mar 27, 2015 · Apt FLR2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor and vinyl tiles . in the kitchen located at apt flr2, 2nd story
Mar 27, 2015 · Apt FLR2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt flr2, 1st story
Mar 27, 2015 · Apt FLR2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt flr2, 1st story
Mar 27, 2015 · Apt FLR2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 2ndfl, 2nd story
Mar 27, 2015 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at entrance door
Jul 22, 2010
Open — Nov sent out - BHazardous
Properly secure the loose stair hand rail at north wall 1 to 2 sty public hall
Jul 22, 2010
Open — Nov sent out
Show 3 more ↓
- CImmediately hazardous
Abate the nuisance consisting of no electric supply to entire apt. 2. supply cut off due non payment in the entire apartment located at apt 2nd, 2nd story
Jul 22, 2010 · Apt 2ND
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1, 2nd story
Jun 26, 2003 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective mortice lock entrance door to 1 story at public hall, 1st story
Jun 26, 2003
Open — Nov sent out
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active
Show 10 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active
ECB violations · 2
- Class - 2
B265. as per class 2 b265 28-303.7 failure to file a complete boilerinspeciton as per dob recods. submit a current b09 report.
May 15, 2017 · Penalty $500
Active - Non-hazardous
Failure to maintain defect is fire rated cellar ceiling throughout missing remedy replace entire fire rated cellar ceiling
Mar 5, 1997 · Penalty $350
Active
Complaints
- Electric
Power outage
Feb 1, 2016 · Apt 2FL
Close - General
Cooking gas
Feb 1, 2016 · Apt 2FL
Close - General
Signage missing
Oct 27, 2015 · Apt TOPFL
Close - Heat/hot water
Apartment only
Mar 24, 2015 · Apt 2NDFL
Close - Unsanitary condition
Mold
Mar 24, 2015 · Apt FLR2
Close - Water leak
Damp spot
Mar 24, 2015 · Apt FLR2
Close - Water leak
Damp spot
Mar 24, 2015 · Apt FLR2
Close - Paint/plaster
Ceiling
Mar 24, 2015 · Apt FLR2
Close - Paint/plaster
Wall
Mar 24, 2015 · Apt FLR2
Close - Unsanitary condition
Mold
Mar 24, 2015 · Apt FLR2
Close
Show 7 more ↓
- Electric
Electric-supply
Jul 20, 2010 · Apt 2ND
Close - Electric
Electric-supply
Jul 20, 2010 · Apt 2ND
Close - Plumbing
Water-leaks
Jun 23, 2003 · Apt TOP
Close - General
Cabinet
Jun 23, 2003 · Apt TOP
Close - General
Mold
Jun 23, 2003 · Apt TOP
Close - Nonconst
Vermin
Jun 23, 2003 · Apt TOP
Close - General
Locks
Jun 23, 2003 · Apt TOP
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S1)
- Year built
- 1901
- Floors
- 2
- Residential units
- 1
- Building area
- 1,800 ft²
- Lot area
- 1,000 ft²
- Zoning
- R6
- Community board
- 305
- Council district
- 42
- Block / lot
- 4088 / 18
- Assessed value
- $45,900
- Landmark / historic district
- No
Questions about 571 Van Siclen Avenue
Who owns 571 Van Siclen Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bronx View Realty LLC.
Does 571 Van Siclen Avenue have violations?
Yes. NYC HPD has recorded 13 housing violations at this property.
Is 571 Van Siclen Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 571 Van Siclen Avenue built?
City records list 1901 as the year it was built.
How many apartments are in 571 Van Siclen Avenue?
It has 1 residential units and 2 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.