623 Cleveland Street
Brooklyn, NY 11208BBL 3-04065-0020Map
Owner of record: Torres, Carlos
623 Cleveland Street is a walk-up apartment building built in 1901 in Brooklyn, 11208. It has 3 residential units across 2 floors. The owner of record is Torres, Carlos. HPD has recorded 155 housing violations here, most recently on January 9, 2014.
- HPD violations
- 155
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 17
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 155
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1fl, 1st story
Jan 9, 2014 · Apt 1FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor broken 2 story public hall at entrance hall.
Jul 15, 2005
Closed — Violation dismissed - BHazardous
Replace with new the missing balusters 1 story to 2nd story public hall.
Jul 15, 2005
Closed — Violation closed - BHazardous
Abate the nuisance consisting of exposed electric wire west wall 2 story apt. 2 rear room.
Jul 15, 2005
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets bathtub bathroom 2 story apt. 2.
Jul 15, 2005
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall 1 story public hall near entrance door to bldg.
Jul 15, 2005
Closed — Violation closed - ANon-hazardous
Refit windows throughout upper and lower sashes 2 story apt. 2.
Jul 15, 2005
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings, walls, trim, throughout 2nd story apt. 2.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the broken or defective wood frame at entrance door rear east room 2nd story apt. 2.
Jul 15, 2005
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor 2nd story apt. 2 kitchen.
Jul 15, 2005
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall 1st story public hall.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the broken or defective balusters and newel post at balustrade 2nd story public hall.
Jul 15, 2005
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor at vestibule 1st story public hall.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the missing mortise lock and assembly at entrance door to bldg.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the missing architrave door.
Jul 15, 2005
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin mice and roaches 2nd story apt. 2.
Jul 15, 2005
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile, at 2nd story apt. 2 bathroom.
Jul 15, 2005
Closed — Violation closed - BHazardous
Properly secure the loose wash basin 2nd story apt. 2, bathroom.
Jul 15, 2005
Closed — Violation closed - BHazardous
Provide door knob, 2nd story apt. 2, bathroom.
Jul 15, 2005
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl 2nd story apt. 2, bathroom.
Jul 15, 2005
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at cellar. legal fixtures may be retained; for information call the borough code enforcement office. throughout cellar.
Jul 15, 2005
Closed — Violation closed - ANon-hazardous
Refit window sashes north east room 2 story apt. 2 floor.
Jul 15, 2005
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections cellar throughout.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the broken or defective window glass top sash northeast room 2 story apt. 2 floor.
Jul 15, 2005
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceilings 2 story public hall.
Jul 15, 2005
Closed — Violation closed - BHazardous
Abate the nuisance consisting of exposed wiring ceilings throughout 2 story apt. 2 floor.
Jul 15, 2005
Closed — Violation closed - BHazardous
Abate the nuisance consisting of exposed wiring ceiling 2 story public hall.
Jul 15, 2005
Closed — Violation dismissed - BHazardous
Replace with new the missing electrical wall fixture 2 story public hall.
Jul 15, 2005
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective electric ceiling fixture north room 2 story apt. 2 floor.
Jul 15, 2005
Closed — Violation closed - BHazardous
Properly repair the broken or defective balustrade 2 story public hall.
Jul 15, 2005
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical outlets wall front and north center rooms, 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the missing light fixture ceiling private hall front and north center rooms, 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling front room 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective concrete and ceramic tiles floor vestibule, 1st story public hall.
Jul 15, 2005
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor 2nd story public hall.
Jul 15, 2005
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective glass upper and lower sashes window, kitchen and south east room, 2nd story apt. 2.
Jul 15, 2005
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak ceillngs over kitchen, bath south east and north east rooms, 2nd story apt. 2.
Jul 15, 2005
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceilings of 2 story apt. 2 .floor.
Jul 15, 2005
Closed — Violation closed - BHazardous
Abate the nuisance consisting of rotted broken cabinet base and counter top sink kitchen 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Properly secure the loose ceiling electrical light fixture kitchen 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood floor kitchen southeast and center room 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the missing baseboard southeast room, 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the missing light fixtures ceiling, rooms throughout 2nd story apt. 2.
Jul 15, 2005
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective plaster walls and ceiling bathroom, 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceramic tiles and wood floor bathroom, 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the missing interior door molding bathroom 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the missing faucet handle bathtub bathroom 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Replace with new the missing ceiling electrical light fixture southwest and center rooms 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings west, center, southeast rooms and bathroom, 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed - BHazardous
Properly secure the loose wall electrical light switch bathroom, 1st story apt. 1.
Jul 15, 2005
Closed — Violation closed
DOB building violations · 1
- Construction other optional
C-construction other optional
Apr 8, 1992
Vp*-violation unserved ecb- dismissed
ECB violations · 1
- Hazardous
Occupancy contrary to that allowed by the certificate of occupancy or building department records. cellar changed from storing and ordinary use to an apartment. partitions erected and kitchen and bath facilitie
Jan 14, 1994 · Penalty $800
Resolve
Complaints
- Safety
Window guard broken/missing
May 25, 2016 · Apt 2
Close - Heating
Heat related
Jan 21, 2014 · Apt 1FL
Close - Heating
Heat related
Jan 19, 2014 · Apt NA
Close - Heating
Heat related
Jan 9, 2014 · Apt 1
Close - Heating
Heat related
Jan 7, 2014 · Apt NA
Close - Heating
Heat related
Jan 4, 2014 · Apt 1FL
Close - General
Mold
Dec 3, 2012 · Apt 1STFL
Close - General
Doors
Dec 3, 2012 · Apt 1STFL
Close - Plumbing
Toilet
Dec 3, 2012 · Apt 1STFL
Close - Heating
Heat related
Nov 25, 2012 · Apt NA
Close
Show 7 more ↓
- Plumbing
Water-leaks
Oct 3, 2012 · Apt 1STFL
Close - General
Doors
Oct 3, 2012 · Apt 1STFL
Close - General
Mold
Oct 3, 2012 · Apt 1STFL
Close - General
Windows
Sep 2, 2008 · Apt 1
Close - Nonconst
Vermin
Sep 2, 2008 · Apt 1
Close - Nonconst
Vermin
Sep 2, 2008 · Apt 1
Close - Plumbing
Basin/sink
Sep 2, 2008 · Apt 1
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jan 20, 2026 | Non-market transfer | Three family dwellings | 3 |
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1901
- Floors
- 2
- Residential units
- 3
- Building area
- 2,008 ft²
- Lot area
- 1,917 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 42
- Block / lot
- 4065 / 20
- Assessed value
- $57,900
- Landmark / historic district
- No
Questions about 623 Cleveland Street
Who owns 623 Cleveland Street?
The owner of record in NYC Department of City Planning PLUTO data is Torres, Carlos.
Does 623 Cleveland Street have violations?
Yes. NYC HPD has recorded 155 housing violations at this property.
Is 623 Cleveland Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 623 Cleveland Street built?
City records list 1901 as the year it was built.
How many apartments are in 623 Cleveland Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.