999 Blake Avenue
Brooklyn, NY 11208BBL 3-04051-0001Map
Owner of record: Community Family Plannin
999 Blake Avenue is an office building built in 2019 in Brooklyn, 11208. The owner of record is Community Family Plannin. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 6
- ECB violations
- 17
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 6
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2019
Dob violation - dismissed - Construction other optional
Stop all work immediately and make site safe
Nov 28, 2018
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
ECB violations · 17
- Class - 2
Failure to maintain/display on site document required by bc chapter 33. noted: at time of inspection of an active jobsite. upon request to see the installation report or sidewalk shed/pipe scaffold none was pro
May 5, 2020 · Penalty $1,280
Resolve - Class - 1
Sec. 3303.7.2 fire extinguishers. noted: at time of inspection of an active jobsite. observed on 1st/2nd fl fire extinguisher was last inspected on october 2019. remedy: comply w/nyc fire code.
May 5, 2020 · Penalty $6,250
Resolve - Class - 1
Failure to instite/maintain safety equipment measures or temporary construction-no handrails.at time of inspection of a 2 story building under construction i observed no handrails to the basement or leading to
Apr 14, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to institute maintain safety equipment measures or temporary construction-no guardrails.at time of inspection i observed missing guardrails at stairs landings i also observed no guardrails at roof level
Apr 14, 2020 · Penalty $2,500
Resolve - Class - 1
Overhead protection,adjacent property. at time of inspection on an active jobsite,i observed no ohp @ exp#3 next to an active walkway next to a adjacent property. overhead protection is needed for safe entrance
Jan 31, 2020 · Penalty $10,030
Resolve - Class - 1
Work does not conform w/ssp. at time of inspection on an active jobsite,i observed part of the sws missing after looking at the ssp. it was observed that the shed was on the ssp this condition of in adequate
Jan 31, 2020 · Penalty $2,530
Resolve - Class - 2
3308.5-failure to install or maintain safety vertical as required note:at time of my inspection of a 2 story building at 2 story stage construction work in progres i observed that there was vertical netting bet
Jan 16, 2020 · Penalty $625
Resolve - Class - 1
Failure to designate and or have superintendent present at site as required note at time of my inspection of a 2 story bdlg at 2 story stage construction work in rpogress i observed that the superintendent rich
Jan 16, 2020 · Penalty $10,000
Resolve - Class - 2
3309.19-protection of roof note at time of my inspection fo a 2 story building at 12 story stage construction work in progress i observed that no roof protetction existed at exp #3 of adjacent building which is
Jan 16, 2020 · Penalty $625
Resolve - Class - 2
Bc 3307.7 failure to provide an adequate construction fence.inadequacies noted.observed at time of the construction,fence at exposure #3 is inadequate missing fence sections & fence not as per code(fence made o
May 20, 2019 · Penalty $620
Resolve
Show 7 more ↓
- Class - 2
Failure to provide approved/accepted plans.at jobsite at time of inspection.observed at time of inspection the contractor has installed soe-soldier piles at exp#'s 1,2,&3 and no approved plans were provided to
May 20, 2019 · Penalty $312
Resolve - Class - 1
Failure to notify dob within 24-48 hours of the start of excavation.observed at time of inspection contractor has excavated for the new building foundation walls and earthwork notification was provided.excavati
May 20, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3304.4.4 failure to provide 3'6" guard rail or solid enclosure around open & accessible sides of excavation.observed at time of inspectionthe construction site is missing 3'6"guard rail or solid enclosure aro
May 20, 2019 · Penalty $625
Resolve - Class - 2
Failure to provide/install panel for side walk shed as required.at time of inspection of a demolition site.active job site with 7 demolition workers on site,i observed that the parapet panel at sidewalk shed wa
Oct 18, 2018 · Penalty $625
Resolve - Class - 2
Sidewalk shed roof not clean of debris.at time of inspection of a 1 story demolition site.under demolition active job site i observed that there were materials from the erection of the side work shed- frames &
Oct 18, 2018 · Penalty $625
Resolve - Class - 3
Work does not conform to approved construction documents or amendmentsjob#320217853/a2/permit expired 12/23/11.noted: 1-ground floor reception (rm) nr.06 installed double door w/exit sign (paa dwg page a-002.01
Mar 18, 2013 · Penalty $250
Resolve - Class - 2
Sidewalk shed does not meet code specifications no vandal proof light fixtures noted installation of procelin fixtures light bulbs busted out of fixtures permit 302251809 remedy: comply with code specs
Feb 26, 2009 · Penalty $10,000
Resolve
Complaints
- Heating
Heat related
Dec 20, 2004 · Apt 0
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O7)
- Year built
- 2019
- Floors
- 2
- Residential units
- —
- Building area
- 7,046 ft²
- Lot area
- 3,740 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 42
- Block / lot
- 4051 / 1
- Assessed value
- $675,900
- Landmark / historic district
- No
Questions about 999 Blake Avenue
Who owns 999 Blake Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Community Family Plannin.
Does 999 Blake Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 999 Blake Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 999 Blake Avenue built?
City records list 2019 as the year it was built.