409 Elton Street
Brooklyn, NY 11208BBL 3-04018-0004Map
Owner of record: 409 Elton LLC
409 Elton Street is a two-family home built in 1901 in Brooklyn, 11208. It has 2 residential units across 2 floors. The owner of record is 409 Elton LLC. HPD has recorded 31 housing violations here, most recently on May 30, 2007. 31 of the 31 most recent violations are still open.
- HPD violations
- 31
- DOB violations
- 3
- ECB violations
- 3
- HPD complaints
- 25
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 31
- BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 2, 2nd story, apartment at south
May 30, 2007 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 4th room from east at south located at apt 2, 2nd story, apartment at south
May 30, 2007 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall in the 1st room from east located at apt 2, 2nd story, apartment at south
May 30, 2007 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet .. in the bathroom located at apt 2, 2nd story, apartment at south
May 30, 2007 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2, 2nd story, apartment at south
May 30, 2007 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story, apartment at south
May 30, 2007 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder lock at door in the entrance located at apt 2, 2nd story, apartment at south
May 30, 2007 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing electrical switch plate at west wall in the 1st room from east located at apt 2, 2nd story, apartment at south
May 30, 2007 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in waste line bathtub in the bathroom located at apt 2, 2nd story
May 26, 2007 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet .... in the bathroom located at apt 2, 2nd story
May 26, 2007 · Apt 2
Open — Nov sent out
Show 21 more ↓
- CImmediately hazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 2, 2nd story
May 26, 2007 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing electrical switch cover in the 5th room from north located at apt 2, 2nd story
May 26, 2007 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the 5th room from north located at apt 2, 2nd story
May 26, 2007 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and south wall in the 2nd room from north located at apt 2, 2nd story
May 26, 2007 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
May 24, 2007 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective cabinet at wash basin in the bathroom located at apt 2, 2nd story
Apr 29, 2007 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door frame in the entrance located at apt 2, 2nd story
Apr 29, 2007 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin (mice) in the entrance located at apt 2, 2nd story
Apr 29, 2007 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at sink in the bathroom located at apt 2, 2nd story
Apr 29, 2007 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective bell/buzzer system located at apt 2, 2nd story
Apr 29, 2007 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective light switch west wall in the 2nd room from east located at apt 2, 2nd story
Apr 29, 2007 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective mortise lock on door in the entrance located at apt 2, 2nd story
Apr 19, 2007 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective outlet at south wall. in the 2nd room from east located at apt 2, 2nd story
Apr 19, 2007 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ligth switch at west wall. in the 2nd room from east located at apt 2, 2nd story
Apr 19, 2007 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing ceramic tiles at west wall. in the bathroom located at apt 2, 2nd story
Apr 19, 2007 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection drain pipe at washbasin in the bathroom located at apt 2, 2nd story
Apr 19, 2007 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection drain pipe at sink. in the kitchen located at apt 2, 2nd story
Apr 19, 2007 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection drain pipe sink in the kitchen located at apt 2, 2nd story
Mar 20, 2007 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water in the entire apartment located at apt 2, 2nd story
Mar 20, 2007 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Mar 20, 2007 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock entrance door located at apt 2, 2nd story
Mar 20, 2007 · Apt 2
Open — Nov sent out
DOB building violations · 3
- Immediate emergency anythingoptional
Seal all accessible openings to prevent unauthorized entry
May 13, 2026
Dob violation - active - Construction other optional
Structure rendered non-compliant. at time of inspection observed building sustained moderate fire damage to exposure 2 consisting of charred wood joints, open fire rated walls, missing windows, minor smoke and water damage throughout.
May 12, 2026
Dob violation - active - Construction other optional
Requesting engineering report. at time of inspection due to fire at expo 2 with exposed charred joists, at interior 2nd floor sagging floors & bedroom stress cracks structural stability is in question.
May 12, 2026
Dob violation - active
ECB violations · 3
- Class - 1
1-failure to maintain building in code-compliant manner. at time of inspection at exposure 2(left), 4(right), 1- 2 floors vertical, horizontal cracks, large vertical crack at attachment points of addition, hous
May 12, 2026 · Penalty $2,500
Active - Class - 1
Work without a permit. at time of inspection observed at exposure 3(back) vertical & horizontal addition attached approximately 15'lx18'wx20'h. no permit on file., obtain permit
May 12, 2026 · Penalty $2,500
Active - Class - 3
Failure to maintain building in code-compliant manner. at time of inspection; noted, observed, building in state of disrepair, over grown weeds, excess debris and trash at exposure 1 and 2 which may cause or ha
Jan 14, 2026 · Penalty $500
Active
Complaints
- Nonconst
Vermin
May 25, 2007 · Apt 2
Close - Nonconst
Vermin
May 25, 2007 · Apt 2
Close - Plumbing
Toilet
May 25, 2007 · Apt 2
Close - Plumbing
Bathtub/shower
May 25, 2007 · Apt 2
Close - Plumbing
Basin/sink
May 25, 2007 · Apt 2
Close - Plumbing
Basin/sink
May 25, 2007 · Apt 2
Close - Paint/plaster
Wall
May 25, 2007 · Apt 2
Close - Paint/plaster
Wall
May 25, 2007 · Apt 2
Close - Paint/plaster
Wall
May 25, 2007 · Apt 2
Close - Paint/plaster
Wall
May 25, 2007 · Apt 2
Close
Show 15 more ↓
- Electric
Bell-buzzer/intercom
May 25, 2007 · Apt 2
Close - Plumbing
Water supply
May 25, 2007 · Apt 2
Close - Electric
Electric-supply
Mar 30, 2007 · Apt 2
Close - Paint/plaster
Wall
Mar 19, 2007 · Apt 2
Close - Plumbing
Basin/sink
Mar 19, 2007 · Apt 2
Close - Heating
Heat related
Mar 19, 2007 · Apt 2
Close - Heating
Heat related
Nov 23, 2006 · Apt 2
Close - Nonconst
Vermin
Apr 1, 2006 · Apt 2
Close - Nonconst
Vermin
Apr 1, 2006 · Apt 2
Close - Plumbing
Toilet
Apr 1, 2006 · Apt 2
Close - Electric
Bell-buzzer/intercom
Apr 1, 2006 · Apt 2
Close - Heating
Heat related
Apr 1, 2006 · Apt 2
Close - Plumbing
Basin/sink
Apr 1, 2006 · Apt 2
Close - Heating
Heat related
Dec 4, 2003 · Apt ATTIC
Close - Heating
Heat related
Oct 23, 2003 · Apt ATTIC
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1901
- Floors
- 2
- Residential units
- 2
- Building area
- 1,980 ft²
- Lot area
- 4,500 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 42
- Block / lot
- 4018 / 4
- Assessed value
- $79,680
- Landmark / historic district
- No
Questions about 409 Elton Street
Who owns 409 Elton Street?
The owner of record in NYC Department of City Planning PLUTO data is 409 Elton LLC.
Does 409 Elton Street have violations?
Yes. NYC HPD has recorded 31 housing violations at this property.
Is 409 Elton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 409 Elton Street built?
City records list 1901 as the year it was built.
How many apartments are in 409 Elton Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.