399 Essex Street
Brooklyn, NY 11208BBL 3-04004-0137Map
Owner of record: Essex Glenmore LLC
399 Essex Street is a walk-up apartment building built in 2004 in Brooklyn, 11208. It has 3 residential units across 2 floors. The owner of record is Essex Glenmore LLC. HPD has recorded 21 housing violations here, most recently on July 10, 2026. 1 of the 21 most recent violations are still open.
- HPD violations
- 21
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 13
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jul 10, 2026 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the 1st bathroom from east located at apt 2, 1st story, 1st apartment from north at east
Jun 25, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at in the entrance located at apt 2, 1st story, 1st apartment from north at east
Jun 25, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of key operated double cylinder lock at metal security door in the entrance located at apt 2, 1st story, 1st apartment from north at east
Jun 25, 2026 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 6th concrete/masonary tread, up from bottom, at building front at stoop
Jun 25, 2026
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 1, 1st apartment from north at east
Jun 20, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st apartment from north at east
Jun 20, 2025 · Apt 1
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 1, 1st apartment from north at east
Jun 20, 2025 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1, 1st apartment from north at east
Jun 20, 2025 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the kitchen located at apt 2, 1st story, 1st apartment from north at east
Sep 25, 2024 · Apt 2
Closed — Violation dismissed
Show 11 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Apr 11, 2024 · Apt 1FL
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at apt entrance door in the entrance located at apt 2, 1st story, 1st apartment from north at east
Feb 29, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the private hallway located at apt 2, 1st story, 1st apartment from north at east
Feb 29, 2024 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Feb 29, 2024 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Feb 29, 2024 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Feb 29, 2024 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Feb 29, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd bathroom from east located at apt 2, 1st story, 1st apartment from north at east
Feb 29, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 9, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 11, 2017
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Paint/plaster
Ceiling
Jun 18, 2025 · Apt 1
Close - Paint/plaster
Ceiling
Jun 18, 2025 · Apt 1
Close - Unsanitary condition
Pests
Jun 18, 2025 · Apt 1
Close - Unsanitary condition
Mold
Jun 18, 2025 · Apt 1
Close - Paint/plaster
Ceiling
Jun 15, 2025 · Apt 1
Close - Unsanitary condition
Mold
Jun 15, 2025 · Apt 1
Close - Unsanitary condition
Pests
Jun 15, 2025 · Apt 1
Close - Unsanitary condition
Pests
Feb 15, 2024 · Apt 2
Close - Unsanitary condition
Pests
Nov 8, 2023 · Apt 1FL
Close - Unsanitary condition
Sewage
Feb 17, 2020 · Apt 1
Close
Show 3 more ↓
- Heat/hot water
Apartment only
Feb 17, 2020 · Apt 1
Close - Door/window
Window frame
Feb 17, 2020 · Apt 1
Close - Plumbing
Toilet
Feb 17, 2020 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2004
- Floors
- 2
- Residential units
- 3
- Building area
- 2,673 ft²
- Lot area
- 1,875 ft²
- Zoning
- R7A
- Community board
- 305
- Council district
- 42
- Block / lot
- 4004 / 137
- Assessed value
- $59,280
- Landmark / historic district
- No
HPD registration #382980, last renewed Aug 30, 2025.
Questions about 399 Essex Street
Who owns 399 Essex Street?
The owner of record in NYC Department of City Planning PLUTO data is Essex Glenmore LLC.
Does 399 Essex Street have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 399 Essex Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 399 Essex Street built?
City records list 2004 as the year it was built.
How many apartments are in 399 Essex Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.