roofy

3052 Fulton Street

Brooklyn, NY 11208BBL 3-03957-0025Map

Owner of record: 3052 Fulton Street LLC

3052 Fulton Street is a two-family home built in 1920 in Brooklyn, 11208. It has 2 residential units across 3 floors. The owner of record is 3052 Fulton Street LLC. HPD has recorded 13 housing violations here, most recently on October 14, 2004. 13 of the 13 most recent violations are still open.

HPD violations
13
DOB violations
4
ECB violations
9
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Oct 14, 2004

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 13

  • B

    Replace with new the broken or defective glass pf windows, front east & front west rooms. 3rd sty. apt.

    Oct 14, 2004

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor of private hall, 3rd sty. apt.

    Oct 14, 2004

    Open — Nov sent out
  • B

    Properly secure the loose electric receptacle, west wall of rear east room 3rd sty. apt.

    Oct 14, 2004

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household articles stored, public hall.

    Oct 14, 2004

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color wall of kitchen, adjacent to cooking range, 3rd sty. apt.

    Oct 14, 2004

    Open — Nov sent out
  • A

    Replace with new the broken or defective sash chain lower sash southeast room window 3 sty. apt.

    Oct 14, 2004

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling & walls southeast room 3 sty. apt.

    Oct 14, 2004

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tile floor bathroom 3 sty. apt.

    Oct 14, 2004

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin mice & roaches throughout 3 sty. apt.

    Oct 14, 2004

    Open — Nov sent out
  • B

    Abate the nuisance consisting of key operated lock, fastened to vestibule side of door.

    Oct 14, 2004

    Open — Nov sent out
Show 3 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department ceilings of rear east room and private hall, 3rd sty. apt.

    Oct 14, 2004

    Open — Nov sent out
  • A

    Replace with new the missing bulb of light fixture, public hall 2nd sty.

    Oct 14, 2004

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceilings & walls throughout 3 sty. apt.

    Oct 14, 2004

    Open — Nov sent out

DOB building violations · 4

  • Construction other optional

    Emergency work.ent bldg leaning apprx 6"to8"@top towards exp4(west), that begins!1st stry.receivng wall intact@all lvls but also leaning severely(@exp4side).cosmetic rpairs done w/o prmy since 2023.1.immed instll minor 2lines or tmp shorng&bracng frm cellar to roof as pe per, 2.all wrk to be drctly sprvsd&drctd

    Oct 9, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner-building out o f plumb with 0" -8" to roof level -facade building @ right rear esposu re #4 multiple cracks at several locations exposure 1/3 owner to hire nyspe to submit engineers report

    May 5, 2023

    Dob violation - active
  • Construction other optional

    At time of inspection observed building out of plumb ,leaning has space between adjacent building. facade at exposure 4 bulging , at exposure 1 cracks at multiple locations.

    Feb 13, 2023

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations · 9

  • Class - 1

    Unlawful acts. failure to comply with commissioner's order .violation 050523ccne01kc in connection with ecb 39085684z dated 5/5/2023, no cfc filed, previous ecb #37025589n no cfc., comply with commissioner's or

    Jan 30, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain building in code complaint manner at time of inspection observed building out of plumb leaning to the left at expo #3 also at expo #3 observed a large amount of debris level . and backyard f

    Dec 27, 2023 · Penalty $1,250

    Active
  • Class - 1

    Failure to comply with the commissioner's order in dob violation vio23-00422, dated 2/13/2023. respondent was required to submit an engineer's report concerning structurally deficient conditions. as of 10/11/20

    Oct 11, 2023

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order in dob violation 050523cne01kc/339454/050523ccne01kc,dated 5/5/2023.respondent was required to submit an engineer's report concerning structurally deficient condi

    Oct 11, 2023 · Penalty $2,530

    Active
  • Class - 1

    Failure to maintain building in a code compliant manner at time of inspection observed building out of plumb, leaning has space between adjacent building. facade at exposure 4 bulging, at exposure 1 cracks at m

    May 5, 2023

    Resolve
  • Class - 1

    At time of inspection observed building out of plumb ,leaning has space between adjacent building. facade at exposure 4 bulging , at exposure 1 cracks at multiple locations., repair and/replace

    Feb 13, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Sec 28-201.1 fail to comply with comm order to obtain a permit per vio# 34654047m- for erecting a structure at rear of bldg w/o a permit. remedy: correct violation 34634047m.

    Dec 10, 2008 · Penalty $4,000

    Active
  • Hazardous

    Failure to comply with an order of comm to correct violation 34634047m.for erect structure at rear of bld approx20 wide x40 ft long x 1 story. completed with masonary block etc. without a permit. no record of c

    Jun 27, 2008 · Penalty $1,500

    Active
  • Hazardous

    Work w/o a permit work noted at rear of bldg 20ftwide by 40ft length and 1 sty masonry (block) enclosed structure attached to rear of exisisting 3 sty bldg noted no permit was been obtain for work completed

    Feb 27, 2008 · Penalty $800

    Resolve

Complaints

  • Nonconst

    Vermin

    Apr 24, 2005 · Apt 2FL

    Close
  • Heating

    Heat related

    Apr 24, 2005 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B9)
Year built
1920
Floors
3
Residential units
2
Building area
3,000 ft²
Lot area
2,013 ft²
Zoning
R6A
Community board
305
Council district
37
Block / lot
3957 / 25
Assessed value
$54,240
Landmark / historic district
No

Questions about 3052 Fulton Street

Who owns 3052 Fulton Street?

The owner of record in NYC Department of City Planning PLUTO data is 3052 Fulton Street LLC.

Does 3052 Fulton Street have violations?

Yes. NYC HPD has recorded 13 housing violations at this property.

Is 3052 Fulton Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 3052 Fulton Street built?

City records list 1920 as the year it was built.

How many apartments are in 3052 Fulton Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.