196 Essex Street
Brooklyn, NY 11208BBL 3-03956-0063Map
Owner of record: Brooklyn Essex Street, LLC
196 Essex Street is a two-family home built in 1901 in Brooklyn, 11208. It has 2 residential units across 2 floors. The owner of record is Brooklyn Essex Street, LLC. HPD has recorded 62 housing violations here, most recently on June 25, 2014. 41 of the 50 most recent violations are still open.
- HPD violations
- 62
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 83
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 62
- BHazardous
Replace with new the broken or defective crack window pane in the 1st room from east at north located at apt 2, 2nd story
Jun 25, 2014 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective tread 12 up from bottom at public hall stairs, 2nd story
Jun 25, 2014
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection waste pipe at wash basin in the bathroom located at apt 2, 2nd story
Jun 25, 2014 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 2, 2nd story
Jun 25, 2014 · Apt 2
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets hot and cold water at bathtub in the bathroom located at apt 2, 2nd story
Jun 25, 2014 · Apt 2
Open — Nov sent out - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2, 2nd story
Jun 25, 2014 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures all stories at public hall
Jun 25, 2014
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures ... in the entire apartment located at apt 2, 2nd story
Jun 25, 2014 · Apt 2
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Jun 25, 2014 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective window frame in the 1st room from east at north located at apt 2, 2nd story
Jun 25, 2014 · Apt 2
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Repair the roof so that it will not leak at ceiling at public hall, 2nd story
Jun 25, 2014
Open — Nov sent out - BHazardous
Properly secure the loose east metal handrail at stairs building at front areaway
Jun 25, 2014
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
May 28, 2014 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace with new the missing seven balusters at private hall staircase located at apt 1, 1st story
May 28, 2014 · Apt 1
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1, 1st story
May 28, 2014 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace with new the missing 3 balusters at 1st to 2nd sty at public hall stairs
May 21, 2014
Closed — Violation closed - BHazardous
Properly repair the broken or defective lower sash north glass window at west wall. in the kitchen located at apt 1, 1st story
May 21, 2014 · Apt 1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
May 21, 2014 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the private hallway located at apt 1, 1st story
May 21, 2014 · Apt 1
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1, 1st story
May 21, 2014 · Apt 1
Open — Nov sent out - BHazardous
Properly secure the loose handrail at east at stoop front entrance to building
Mar 22, 2013
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete wall at east at stoop front entrance to building
Mar 22, 2013
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
Mar 22, 2013 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story
Mar 22, 2013 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures kitchen and bathroom in the entire apartment located at apt 1flr, 1st story
Feb 5, 2013 · Apt 1FLR
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east located at apt 1fl, 1st story, 1st apartment from south at west
Jan 25, 2011 · Apt 1FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story, 1st apartment from south at west
Jan 25, 2011 · Apt 1FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt pv, 1st story
Mar 11, 2010 · Apt PV
Open — Nov sent out - BHazardous
Abate the nuisance consisting of no electric supply to electrical light fixture at ceiling in the kitchen located at apt pv, 1st story
Mar 11, 2010 · Apt PV
Open — Nov sent out - BHazardous
Abate the nuisance consisting of no electric to all out lets at kitchen in the kitchen located at apt pv, 1st story
Mar 11, 2010 · Apt PV
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the ceiling and west wall - 4 sq ft in the kitchen located at apt pv, 1st story
Jan 24, 2010 · Apt PV
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the ceiling and west wall - 4 sq ft in the 2nd room from east located at apt pv, 1st story
Jan 24, 2010 · Apt PV
Open — Nov sent out - BHazardous
Replace with new the broken or defective cabinets under the sink in the kitchen located at apt pv, 1st story
Jan 24, 2010 · Apt PV
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the ceiling - 2 sq ft in the bathroom located at apt pv, 2nd story
Jan 24, 2010 · Apt PV
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and east wall in the bathroom located at apt pv, 2nd story
Jan 24, 2010 · Apt PV
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story
Apr 26, 2009 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at floor in the bathroom located at apt 1fl, 1st story
Apr 26, 2009 · Apt 1FL
Open — Nov sent out - BHazardous
Replace the broken or defective missing bathtub in the bathroom located at apt 1fl, 1st story
Apr 26, 2009 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak at ceiling in the 1st room from east located at apt pvt, 1st story
Feb 17, 2009 · Apt PVT
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt pvt, 1st story
Feb 17, 2009 · Apt PVT
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east located at apt pvt, 1st story
Feb 17, 2009 · Apt PVT
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall in the bathroom located at apt pvt, 2nd story
Feb 17, 2009 · Apt PVT
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cermic floor tiles in the bathroom located at apt pvt, 1st story
Feb 17, 2009 · Apt PVT
Open — Nov sent out - BHazardous
Repair the broken or defective connection cold water supply pipe at boiler room at basement
Feb 17, 2009
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall at bottom window sill in the 2nd room from east located at apt pvt, 2nd story
Feb 17, 2009 · Apt PVT
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... approx 20 sq ft at west wall in the 2nd room from east located at apt pvt, 2nd story
Feb 17, 2009 · Apt PVT
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east located at apt pvt, 1st story
Jan 24, 2009 · Apt PVT
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt pvt, 1st story
Jan 18, 2009 · Apt PVT
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at walls in the entire apartment located at apt pvt, 1st story
May 8, 2008 · Apt PVT
Open — Nov sent out - BHazardous
Properly repair the broken or defective window in the bathroom located at apt pvt, 1st story
May 8, 2008 · Apt PVT
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
B254,4,15,19,24,32,34,50. 24-boiler remote control switch outside bin room missing; 34-boiler room door not fire rated and self closin;50-spill switch missing.
Jul 30, 2014 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Nov 2, 2014 · Apt FLR1
Close - Heat/hot water
Entire building
Nov 2, 2014 · Apt 1
Close - Water leak
Heavy flow
Jun 18, 2014 · Apt BLDG
Close - Outside building
Roofing
Jun 18, 2014 · Apt BLDG
Close - Flooring/stairs
Stairs
Jun 18, 2014 · Apt BLDG
Close - Plumbing
Basin/sink
Jun 18, 2014 · Apt BLDG
Close - Plumbing
Bathtub/shower
Jun 18, 2014 · Apt BLDG
Close - Door/window
Window pane
Jun 18, 2014 · Apt BLDG
Close - Water leak
Heavy flow
Jun 18, 2014 · Apt BLDG
Close - Plumbing
Bathtub/shower
Jun 18, 2014 · Apt BLDG
Close
Show 40 more ↓
- Paint/plaster
Wall
Jun 18, 2014 · Apt BLDG
Close - Door/window
Window frame
Jun 18, 2014 · Apt BLDG
Close - Water leak
Slow leak
Jun 18, 2014 · Apt BLDG
Close - Plumbing
Toilet
Jun 18, 2014 · Apt BLDG
Close - Door/window
Window frame
May 19, 2014 · Apt BLDG
Close - Flooring/stairs
Stairs
May 19, 2014 · Apt BLDG
Close - Flooring/stairs
Stairs
May 19, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
May 19, 2014 · Apt BLDG
Close - Paint/plaster
Ceiling
May 19, 2014 · Apt BLDG
Close - Paint/plaster
Wall
May 19, 2014 · Apt BLDG
Close - Door/window
Window frame
May 19, 2014 · Apt BLDG
Close - Plumbing
Bathtub/shower
May 19, 2014 · Apt BLDG
Close - Door/window
Window pane
May 19, 2014 · Apt BLDG
Close - Door/window
Window pane
May 19, 2014 · Apt BLDG
Close - Plumbing
Toilet
May 19, 2014 · Apt BLDG
Close - Plumbing
Basin/sink
May 19, 2014 · Apt BLDG
Close - Water leak
Heavy flow
May 19, 2014 · Apt BLDG
Close - Heating
Heat related
Mar 21, 2013 · Apt NA
Close - General
Stairs
Mar 21, 2013 · Apt 1FLR
Close - General
Stairs
Mar 21, 2013 · Apt 1FLR
Close - Plumbing
Water supply
Jan 27, 2013 · Apt 1FLR
Close - Plumbing
Water-leaks
Dec 30, 2010 · Apt PV
Close - General
Cabinet
Dec 30, 2010 · Apt PV
Close - General
Mold
Dec 30, 2010 · Apt PV
Close - General
Mold
Dec 30, 2010 · Apt PV
Close - Plumbing
Water-leaks
Dec 30, 2010 · Apt PV
Close - Plumbing
Water-leaks
Dec 30, 2010 · Apt PV
Close - Plumbing
Water-leaks
Dec 30, 2010 · Apt PV
Close - General
Mold
Dec 30, 2010 · Apt PV
Close - Paint/plaster
Wall
Dec 30, 2010 · Apt PV
Close - Plumbing
Shower-stall
Dec 30, 2010 · Apt PV
Close - Plumbing
Water-leaks
Dec 30, 2010 · Apt PV
Close - Plumbing
Water-leaks
Dec 16, 2010 · Apt 1FL
Close - Heating
Heat related
Dec 16, 2010 · Apt 1FL
Close - Plumbing
Sewer
Dec 2, 2010 · Apt 1
Close - Plumbing
Water-leaks
Dec 2, 2010 · Apt 1
Close - Electric
Lighting
Mar 6, 2010 · Apt PV
Close - Heating
Heat related
Feb 3, 2010 · Apt PV
Close - Plumbing
Water supply
Mar 3, 2009 · Apt 1FL
Close - Plumbing
Sewer
Jan 18, 2009 · Apt PVT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1901
- Floors
- 2
- Residential units
- 2
- Building area
- 1,876 ft²
- Lot area
- 1,050 ft²
- Zoning
- R5B
- Community board
- 305
- Council district
- 37
- Block / lot
- 3956 / 63
- Assessed value
- $61,500
- Landmark / historic district
- No
Questions about 196 Essex Street
Who owns 196 Essex Street?
The owner of record in NYC Department of City Planning PLUTO data is Brooklyn Essex Street, LLC.
Does 196 Essex Street have violations?
Yes. NYC HPD has recorded 62 housing violations at this property.
Is 196 Essex Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 196 Essex Street built?
City records list 1901 as the year it was built.
How many apartments are in 196 Essex Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.