168 Linwood Street
Brooklyn, NY 11208BBL 3-03926-0042Map
Owner of record: Suarez, Aida
168 Linwood Street is a two-family home built in 1925 in Brooklyn, 11208. It has 2 residential units across 2.75 floors. The owner of record is Suarez, Aida. HPD has recorded 17 housing violations here, most recently on September 24, 2019. 16 of the 17 most recent violations are still open.
- HPD violations
- 17
- DOB violations
- 3
- ECB violations
- 3
- HPD complaints
- 20
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- CImmediately hazardous
Provide temporary seal-up for all accessible openings in the entire apartment located at apt attic, 3rd story
Sep 24, 2019 · Apt ATTIC
Closed — Violation closed - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for the attic, vacate posting number 149868
Sep 17, 2019
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 29, 2019
Open — Info nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at attic story (being occupied as an illegal class ''a'' apartment). , 3rd story
Aug 21, 2019
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible at attic
Aug 21, 2019
Open — Nov sent out - BHazardous
Abate the nuisance consisting of attic use for sleeping; water closet, wash basin, bathtub, and kitchen sink installed at attic
Aug 21, 2019
Open — Nov sent out - BHazardous
§ 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy
Aug 21, 2019
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1fl, 1st story, apartment at south
Aug 3, 2019 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, apartment at south
Aug 3, 2019 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at sink in the kitchen located at apt 1fl, 1st story, apartment at south
Aug 3, 2019 · Apt 1FL
Open — Nov sent out
Show 7 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1fl, 1st story, apartment at south
Aug 3, 2019 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 3, 2019
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 3, 2019
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 3fl, 3rd story, 1st apartment from east at south
Jul 27, 2018 · Apt 3FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings 1st story apt. #1 thro-out.
Jul 20, 2005
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets sink kitchen 1st story apt. #1
Nov 25, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling center room, 2nd story apt # 02.
Nov 25, 2004
Open — Nov sent out
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - active - Construction other optional
C-construction other optional
Aug 11, 2000
Dob violation - active - Construction other optional
Work without a permit work noted: installation of 2 piece bathroom at cellar rear north and attic rear south suggested remedy: obtain a permit, or remove the illegal bathrooms
Aug 11, 2000
Vw-violation work without permit - active
ECB violations · 3
- Class - 1
Occupancy contrary to that allowed by c of o and department of buildings records.an illegal class a apartment created at attic.unlawful gas range and kitchen sink present.also full bathroom present completed wi
Aug 21, 2019 · Penalty $12,500
Active - Non-hazardous
Falure to maintain building inferior defects are:broken and missing ceiling in the boiler room,various location thoughout the cellar.suggested rem:repair/replace ceiling.
Aug 11, 2000 · Penalty $2,500
Active - Non-hazardous
Work without a permit work noted:installation of 2 piece bathroom at cellar rear north and attic rear south.suggested remedy:obtain a permitor remove the illegal bathrooms.
Aug 11, 2000 · Penalty $2,500
Active
Complaints
- Heat/hot water
Entire building
Dec 31, 2023 · Apt BLDG
Close - Electric
No lighting
Aug 21, 2019 · Apt ATTIC
Close - Electric
Power outage
Aug 20, 2019 · Apt ATTIC
Close - Unsanitary condition
Pests
Jul 31, 2019 · Apt 1FL
Close - Unsanitary condition
Garbage/recycling storage
Aug 26, 2018 · Apt BLDG
Close - General
Cooking gas
Jul 13, 2018 · Apt 2
Close - Plumbing
Water supply
Jul 6, 2018 · Apt ATTIC
Close - General
Cooking gas
Jul 6, 2018 · Apt ATTIC
Close - General
Cooking gas
Jun 29, 2018 · Apt 3FL
Close - Plumbing
Water supply
Jun 29, 2018 · Apt 3FL
Close
Show 10 more ↓
- Unsanitary condition
Pests
Jun 29, 2018 · Apt 3FL
Close - Unsanitary condition
Pests
Jun 29, 2018 · Apt 3FL
Close - Heat/hot water
Apartment only
Jun 20, 2018 · Apt ATTIC
Close - Water leak
Slow leak
Jun 20, 2018 · Apt ATTIC
Close - Unsanitary condition
Pests
Jun 20, 2018 · Apt ATTIC
Close - Heat/hot water
Apartment only
May 10, 2018 · Apt ATTIC
Close - Unsanitary condition
Pests
May 10, 2018 · Apt ATTIC
Close - Plumbing
Water supply
May 10, 2018 · Apt ATTIC
Close - Heating
Heat related
Dec 20, 2005 · Apt 1FL
Close - Electric
Electric-supply
Sep 16, 2005 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B9)
- Year built
- 1925
- Floors
- 2.75
- Residential units
- 2
- Building area
- 2,192 ft²
- Lot area
- 2,500 ft²
- Zoning
- R4
- Community board
- 305
- Council district
- 37
- Block / lot
- 3926 / 42
- Assessed value
- $57,180
- Landmark / historic district
- No
Questions about 168 Linwood Street
Who owns 168 Linwood Street?
The owner of record in NYC Department of City Planning PLUTO data is Suarez, Aida.
Does 168 Linwood Street have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 168 Linwood Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 168 Linwood Street built?
City records list 1925 as the year it was built.
How many apartments are in 168 Linwood Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.