Owner of record: Brooklyn NY Portfolio LLC
Powell Street is a walk-up apartment building built in 2019 in Brooklyn, 11212. It has 8 residential units across 4 floors. The owner of record is Brooklyn NY Portfolio LLC. HPD has recorded 17 housing violations here, most recently on September 11, 2026. 7 of the 17 most recent violations are still open.
- HPD violations
- 17
- DOB violations
- 4
- ECB violations
- 11
- HPD complaints
- 20
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 11, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door
Aug 7, 2026
Open — Invalid certification - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 4a, 4th story, 1st apartment from north at east
May 21, 2026 · Apt 4A
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 4a, 4th story, 1st apartment from north at east
May 21, 2026 · Apt 4A
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from north at east
May 21, 2026 · Apt 4A
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from north at east
May 21, 2026 · Apt 4A
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
May 21, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 3b, 3rd story, 1st apartment from south at west
May 21, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
May 21, 2026
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak ceiling under roof in the 1st room from north at east located at apt 4a, 4th story, 1st apartment from north at east
May 21, 2026 · Apt 4A
Open — Not complied with
Show 7 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 3b, 3rd story, 1st apartment from south at west
May 21, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 4a, 4th story, 1st apartment from north at east
Oct 20, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 4a, 4th story, 1st apartment from north at east
Oct 20, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the foyer located at apt 4a, 4th story, 1st apartment from north at east
Oct 20, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 4a, 4th story, 1st apartment from north at east
Oct 20, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycle, suitcases at intermediate landen leading to roof at public hall, 4th story
Sep 18, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 11, 2023
Closed — Violation dismissed
DOB building violations · 4
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 11, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Apr 11, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Apr 11, 2019
Vp*-violation unserved ecb- dismissed
ECB violations · 11
- Class - 1
Owner failed to ensure each constructed or demolition worker successfully competed tag required training under 3321.1 during my inspection iobserved unidentified worker #1 @ a jobsite for which a const super is
Apr 11, 2019
Resolve - Class - 1
Owner failed to ensure each const or demo worker successfully completed the required training under 3321.1. during my inspection i observed unidentified worker #2 @ a jobsite for which a const super is required
Apr 11, 2019
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. attime of inspection on an active jobsite observed inadequate housekeeping consisting of large amounts of debris,construction material & insul
Apr 11, 2019 · Penalty $2,500
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition worker successfully completed the required training under 3321.1. during my inspection i observed unidentified worker #1 at jobsite for which a con
Apr 11, 2019
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition worker successfully completed the required training under 3321.1. during my inspection i observed unidentified worker#2 at jobsite for which a cons
Apr 11, 2019
Resolve - Class - 1
Failure to have a construction superintendent present at site as required. at time of inspection on an active jobsite,observed that superintendent or completent person was not on site. stop all work entire site
Apr 11, 2019
Resolve - Class - 1
Construction superintendent failed to perform duties as per code.(inadequate log book). at time of inspection on an active jobsite,observed that construction superintendent was not on site & the following condi
Apr 11, 2019
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. at time of inspection on an active jobsite,observed construction fence partially missing at exp#2. at adjoining bldg,contrary to
Apr 11, 2019
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails. at time of inspection on an active jobsite of inspection on an active jobsite of a 4 sty bldg,observed guardrails
Apr 11, 2019
Resolve - Class - 1
Owner failed to ensure each construction or demolition worker successfully completed the required training under 3321.1, observed wilfredo ortega @requiured a building site for which a const super is required,
Apr 11, 2019
Resolve
Show 1 more ↓
- Class - 1
Failure to maintain/display on-site documents required by bc chapter 33(no site safety plan)at the time of inspection it was observed it was observed that the site safety plan was not onsite to verify the ongoi
Nov 1, 2018 · Penalty $625
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jun 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 20, 2026 · Apt 3B
Close - Water leak
Heavy flow
May 20, 2026 · Apt 3B
Close - Water leak
Heavy flow
May 20, 2026 · Apt 3B
Close - Water leak
Slow leak
Mar 24, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Oct 19, 2025 · Apt 4A
Close - Plumbing
Water supply
Oct 13, 2025 · Apt 4A
Close - Plumbing
Basin/sink
Feb 9, 2025 · Apt 1B
Close - Electric
No lighting
Sep 17, 2024 · Apt 4B
Close - Electric
Power outage
Sep 17, 2024 · Apt 4B
Close
Show 10 more ↓
- Plumbing
Toilet
Jun 19, 2024 · Apt 1B
Close - Plumbing
Bathtub/shower
Jun 19, 2024 · Apt 1B
Close - Plumbing
Toilet
Feb 24, 2024 · Apt 1A
Close - Plumbing
Bathtub/shower
Feb 24, 2024 · Apt 1A
Close - Plumbing
Toilet
Dec 22, 2023 · Apt 1A
Close - General
Bell/buzzer/intercom
Dec 22, 2023 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 22, 2023 · Apt 1A
Close - Plumbing
Toilet
Nov 26, 2022 · Apt 1A
Close - Plumbing
Basin/sink
Mar 22, 2022 · Apt 3B
Close - Unsanitary condition
Garbage/recycling storage
Sep 21, 2021 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2019
- Floors
- 4
- Residential units
- 8
- Building area
- 5,379 ft²
- Lot area
- 2,410 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 3847 / 143
- Assessed value
- $322,200
- Landmark / historic district
- No
HPD registration #389711, last renewed Jan 30, 2026.
Questions about Powell Street
Who owns Powell Street?
The owner of record in NYC Department of City Planning PLUTO data is Brooklyn NY Portfolio LLC.
Does Powell Street have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is Powell Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was Powell Street built?
City records list 2019 as the year it was built.
How many apartments are in Powell Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.