roofy

649 Vermont Street

Brooklyn, NY 11207BBL 3-03842-0011Map

Owner of record: Realty 649 LLC

649 Vermont Street is a walk-up apartment building built in 1930 in Brooklyn, 11207. It has 5 residential units across 3 floors. The owner of record is Realty 649 LLC. HPD has recorded 143 housing violations here, most recently on May 1, 2025. 1 of the 50 most recent violations are still open.

HPD violations
143
DOB violations
0
ECB violations
0
HPD complaints
51

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 1, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 143

  • A

    Paint with light colored paint to the satisfaction of this department the picture moulding at east wall in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east

    May 1, 2025 · Apt 3R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east

    May 1, 2025 · Apt 3R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east

    May 1, 2025 · Apt 3R

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage bags at front of buildind , 1st story

    May 1, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective eroded joint brick work at parapet wall at front of building , 1st story

    May 1, 2025

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    May 1, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 3rd story

    May 1, 2025

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east

    May 1, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east

    May 1, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) picture moulding at east wall in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east

    May 1, 2025 · Apt 3R

    Closed — Violation closed
Show 40 more ↓
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 3rd room from east at south located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from east at south wall, west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at 1st closet from south at west wall wall in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at south wall, north wall, baseboard at north wall, ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the 3rd room from east at north located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door frame from east at south wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from east at north located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st window frame from west at north wall in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, chair rails at north wall, chair rails at south wall, chair rails at west wall, north wall, south wall, west wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from east at south located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, east wall, west wall in the private hallway located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall wall, 1st closet from north at east wall door frame, 2nd closet from north at east wall wall, 2nd closet from north at east wall ceiling in the private hallway located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall in the foyer located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 3rd room from east at north located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective door hinges in the entrance located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective door hinges in the entrance located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) chair rails at south wall, chair rails at east wall, north wall, south wall, east wall, west wall in the 2nd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, south wall in the foyer located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall in the private hallway located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 7, 2025 · Apt 3R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north

    Apr 7, 2025 · Apt 2F

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3f, 3rd story, 1st apartment from west at north

    Mar 31, 2025 · Apt 3F

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Mar 31, 2025 · Apt 3R

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Mar 31, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2f, 2nd story, 1st apartment from west at north

    Mar 31, 2025 · Apt 2F

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panels at ceiling in the 1st room from east at north located at apt 1a, 1st story

    Oct 25, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story

    Oct 25, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at west wall and north wall in the bathroom located at apt 1a, 1st story

    Oct 25, 2024 · Apt 1A

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panels at ceiling in the foyer located at apt 1a, 1st story

    Oct 25, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 4th room from east located at apt 1a, 1st story

    Oct 25, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Refit west 1 and west 2 window at west wall in the 6th room from east located at apt 1a, 1st story

    Oct 25, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 5th room from east located at apt 1a, 1st story

    Oct 25, 2024 · Apt 1A

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panels at ceiling in the private hallway located at apt 1a, 1st story

    Oct 25, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 1a, 1st story

    Oct 25, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood closet door at south wall in the bathroom located at apt 1a, 1st story

    Oct 25, 2024 · Apt 1A

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Safety

    Window guard broken/missing

    Oct 2, 2024 · Apt 1A

    Close
  • Plumbing

    Basin/sink

    Sep 11, 2018 · Apt 1

    Close
  • Paint/plaster

    Wall

    Sep 11, 2018 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Sep 11, 2018 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Sep 11, 2018 · Apt 1

    Close
  • Paint/plaster

    Wall

    Sep 11, 2018 · Apt 1

    Close
  • Door/window

    Door

    Sep 11, 2018 · Apt 1

    Close
  • Electric

    No lighting

    Sep 11, 2018 · Apt 1

    Close
  • Door/window

    Door

    Sep 11, 2018 · Apt 1

    Close
  • Paint/plaster

    Wall

    Aug 29, 2018 · Apt 1

    Close
Show 40 more ↓
  • Flooring/stairs

    Floor

    Aug 29, 2018 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Aug 29, 2018 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Aug 29, 2018 · Apt 1

    Close
  • Paint/plaster

    Wall

    Aug 29, 2018 · Apt 1

    Close
  • Door/window

    Door

    Aug 29, 2018 · Apt 1

    Close
  • Electric

    No lighting

    Aug 29, 2018 · Apt 1

    Close
  • Door/window

    Door

    Aug 29, 2018 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Aug 29, 2018 · Apt 1

    Close
  • Water leak

    Slow leak

    Aug 27, 2018 · Apt 1

    Close
  • Electric

    Lighting

    Aug 27, 2018 · Apt 1

    Close
  • Water leak

    Slow leak

    Aug 27, 2018 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Aug 27, 2018 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Aug 27, 2018 · Apt 1

    Close
  • Paint/plaster

    Wall

    May 25, 2017 · Apt 2R

    Close
  • Flooring/stairs

    Stairs

    May 25, 2017 · Apt 2R

    Close
  • Door/window

    Door

    May 25, 2017 · Apt 2R

    Close
  • Water leak

    Damp spot

    May 25, 2017 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    May 25, 2017 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    May 25, 2017 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    May 25, 2017 · Apt 2R

    Close
  • Paint/plaster

    Wall

    May 25, 2017 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    May 25, 2017 · Apt 2R

    Close
  • Water leak

    Damp spot

    May 25, 2017 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    May 25, 2017 · Apt 2R

    Close
  • Door/window

    Door

    May 25, 2017 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2016 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Nov 26, 2016 · Apt BLDG

    Close
  • General

    Mold

    Jul 4, 2013 · Apt 3F

    Close
  • General

    Mold

    Jul 4, 2013 · Apt 3F

    Close
  • Electric

    Electric-supply

    Jul 4, 2013 · Apt 3F

    Close
  • Heating

    Heat related

    Nov 26, 2012 · Apt 3F

    Close
  • Electric

    Lighting

    Aug 23, 2011 · Apt BLDG

    Close
  • General

    Windows

    May 24, 2011 · Apt 3F

    Close
  • General

    Windows

    May 24, 2011 · Apt 3F

    Close
  • Heating

    Heat related

    Nov 9, 2010 · Apt 3F

    Close
  • Heating

    Heat related

    Dec 19, 2005 · Apt 3F

    Close
  • Heating

    Heat related

    Dec 3, 2005 · Apt 3F

    Close
  • Nonconst

    Vermin

    Dec 2, 2005 · Apt 3F

    Close
  • Nonconst

    Vermin

    Dec 2, 2005 · Apt 3F

    Close
  • Heating

    Heat related

    Dec 2, 2005 · Apt 3F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1930
Floors
3
Residential units
5
Building area
4,296 ft²
Lot area
2,767 ft²
Zoning
R6
Community board
305
Council district
42
Block / lot
3842 / 11
Assessed value
$297,900
Landmark / historic district
No

HPD registration #337070, last renewed Aug 22, 2025.

Questions about 649 Vermont Street

Who owns 649 Vermont Street?

The owner of record in NYC Department of City Planning PLUTO data is Realty 649 LLC.

Does 649 Vermont Street have violations?

Yes. NYC HPD has recorded 143 housing violations at this property.

Is 649 Vermont Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 649 Vermont Street built?

City records list 1930 as the year it was built.

How many apartments are in 649 Vermont Street?

It has 5 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.