573 Pennsylvania Avenue
Brooklyn, NY 11207BBL 3-03840-0026Map
Owner of record: Alesia Yoyo
573 Pennsylvania Avenue is a two-family home built in 1920 in Brooklyn, 11207. It has 2 residential units across 2 floors. The owner of record is Alesia Yoyo. HPD has recorded 51 housing violations here, most recently on January 7, 2022. 12 of the 50 most recent violations are still open.
- HPD violations
- 51
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 33
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 51
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 7, 2022
Open — Info nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, 1st door frame from east at south wall in the 5th room from east at north located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall, 1st closet from south at west wall door frame in the 1st room from east at north located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 3rd room from east at south located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st window frame from east at south wall in the 4th room from east located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the 5th room from east at south located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, east wall, 1st window frame from south at west wall in the 5th room from east at north located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st wall cabinet from north at east wall in the kitchen located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door in the 1st room from east at north located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, west wall in the 3rd room from east at south located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 4th room from east located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall in the 5th room from east at south located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st riser from east at south wall in the bathroom located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall in the kitchen located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 5th room from east at north located at apt 2ndflr, 2nd story, 1st apartment from north at east
Jan 6, 2022 · Apt 2NDFLR
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections water closet, shower stall, wash basin, kitchen sink at basement
Feb 2, 2016
Closed — Violation dismissed - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible (electric)range with oven at basement
Feb 2, 2016
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective loose wooden tread 3rd below 2sty
Oct 17, 2008
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 1st, 2nd, 4th and 5th concrete tread from ground at front of bldg
Oct 17, 2008
Closed — Violation closed - BHazardous
Replace with new the broken or defective upper sash south window pane at cellar
Oct 17, 2008
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the entire apartment located at apt 2, 2nd story
Oct 17, 2008 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 1st room from east at south located at apt 2, 2nd story
Oct 17, 2008 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the missing light bulb at staircase
Oct 17, 2008
Closed — Violation closed - BHazardous
Replace with new the broken or defective light switch in the bathroom located at apt 2, 2nd story
Oct 17, 2008 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the missing missing light in the 1st room from east at south located at apt 2, 2nd story
Oct 17, 2008 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and walls in the 1st room from east at north located at apt 2, 2nd story
Oct 17, 2008 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and walls in the 1st room from east at south located at apt 2, 2nd story
Oct 17, 2008 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling at public hall
Oct 17, 2008
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood stop at window in the bathroom located at apt 1, 1st story
Aug 15, 2007 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood base moulding at north wall in the 1st room from east at north located at apt 1, 1st story
Aug 15, 2007 · Apt 1
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the dirt and grime at cellar
Aug 15, 2007
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar
Aug 15, 2007
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin (roaches) in the entire apartment located at apt 1, 1st story
Aug 15, 2007 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the nuisnace consisting of rodents rats in the entire apartment located at apt 1, 1st story
Aug 15, 2007 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood, floor in the 1st bedroom located at apt 1, 1st story
Oct 18, 2000 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective make operable upper and lower sash windows. in the bedroom 3 located at apt 1, 1st story
Oct 18, 2000 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline wash-basin. in the bathroom located at apt 1, 1st story
Oct 18, 2000 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles, east and south walls. in the bathroom located at apt 1, 1st story
Oct 18, 2000 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective connection wasteline sink. in the kitchen located at apt 1, 1st story
Oct 18, 2000 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls. in the entire apartment located at apt 1, 1st story
Oct 18, 2000 · Apt 1
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective parquet floor, in the living room from east located at apt 1, 1st story
Oct 18, 2000 · Apt 1
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 1, 1st story
Dec 1, 1999 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective panel board at north and south wall. in the room from east located at apt 1, 1st story
Dec 1, 1999 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at kitchen in the kitchen located at apt 1, 1st story
Dec 1, 1999 · Apt 1
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective sheetroock south wall. in the private hallway from east located at apt 1, 1st story
Dec 1, 1999 · Apt 1
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Occupancy contrary to that alllowed by c of o & dob records.partitionserected creating illegal use of rooms for living in bsmt.unlawful cooking range & kitchen sink.also full bathroom complete w/wash-basin,wate
Feb 2, 2016 · Penalty $1,200
Resolve
Complaints
- Water leak
Heavy flow
May 20, 2022 · Apt 1
Close - Unsanitary condition
Pests
Jan 5, 2022 · Apt 2NDFLR
Close - Paint/plaster
Wall
Jan 5, 2022 · Apt 2NDFLR
Close - Paint/plaster
Wall
Jan 5, 2022 · Apt 2NDFLR
Close - Unsanitary condition
Pests
Jul 29, 2021 · Apt 2NDFLO
Close - General
Mold
Sep 30, 2008 · Apt 2
Close - General
Mold
Sep 30, 2008 · Apt 2
Close - General
Stairs
Sep 30, 2008 · Apt 2
Close - General
Stairs
Sep 30, 2008 · Apt 2
Close - General
Stairs
Sep 30, 2008 · Apt 2
Close
Show 23 more ↓
- General
Windows
Sep 30, 2008 · Apt 2
Close - Plumbing
Water-leaks
Sep 30, 2008 · Apt 2
Close - Paint/plaster
Wall
Sep 30, 2008 · Apt 2
Close - General
Floor
Sep 30, 2008 · Apt 2
Close - Electric
Lighting
Sep 30, 2008 · Apt 2
Close - Electric
Lighting
Sep 30, 2008 · Apt 2
Close - Electric
Electric-supply
Sep 30, 2008 · Apt 2
Close - Electric
Electric-supply
Sep 30, 2008 · Apt 2
Close - Paint/plaster
Wall
Sep 30, 2008 · Apt 2
Close - Heating
Heat related
Dec 28, 2007 · Apt 1
Close - Heating
Heat related
Dec 27, 2007 · Apt 1FL
Close - Nonconst
Vermin
Jul 24, 2007 · Apt 1
Close - Nonconst
Vermin
Jul 24, 2007 · Apt 1
Close - Nonconst
Vermin
Jul 24, 2007 · Apt 1
Close - Nonconst
Vermin
Jul 24, 2007 · Apt 1
Close - Nonconst
Rubbish
Jul 24, 2007 · Apt 1
Close - Nonconst
Smoke detector
Jul 24, 2007 · Apt 1
Close - Plumbing
Water-leaks
Jul 28, 2005 · Apt 1FL
Close - Electric
Wiring
Jul 28, 2005 · Apt 1FL
Close - Heating
Heat related
Jul 28, 2005 · Apt 1FL
Close - Nonconst
Vermin
Jul 28, 2005 · Apt 1FL
Close - Plumbing
Radiator
Jul 28, 2005 · Apt 1FL
Close - General
Mold
Jul 28, 2005 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 2,280 ft²
- Lot area
- 2,383 ft²
- Zoning
- R6
- Community board
- 305
- Council district
- 42
- Block / lot
- 3840 / 26
- Assessed value
- $47,220
- Landmark / historic district
- No
Questions about 573 Pennsylvania Avenue
Who owns 573 Pennsylvania Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Alesia Yoyo.
Does 573 Pennsylvania Avenue have violations?
Yes. NYC HPD has recorded 51 housing violations at this property.
Is 573 Pennsylvania Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 573 Pennsylvania Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 573 Pennsylvania Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.