580 Georgia Avenue
Brooklyn, NY 11207BBL 3-03837-0044Map
Owner of record: Georgia Mgmt INC.
580 Georgia Avenue is a walk-up apartment building built in 1930 in Brooklyn, 11207. It has 4 residential units across 2 floors. The owner of record is Georgia Mgmt INC.. HPD has recorded 451 housing violations here, most recently on September 14, 2026. 39 of the 50 most recent violations are still open.
- HPD violations
- 451
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 281
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 451
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the 4th room from east at north, the kitchen , the 3rd room from east located at apt 2b, 2nd story, 1st apartment from south at west
Sep 14, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall at public hall, 1st story
Sep 14, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at south wall at public hall, 1st story
Sep 14, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Sep 14, 2026 · Apt 2B
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by the method of reglazing at bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Sep 14, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet .. in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at window lower sash at north wall in the 3rd room from east located at apt 2b, 2nd story, 1st apartment from south at west
Sep 14, 2026 · Apt 2B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 4th room from east at north located at apt 2b, 2nd story, 1st apartment from south at west
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet observed at ceiling in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - BHazardous
Replace with new the missing electrical switch face plate at west wall in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet observed at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
Aug 20, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1f, 1st story, 1st apartment from west at north
Jul 9, 2026 · Apt 1F
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the the floors at public hall, 1st story
Jul 5, 2026
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Jul 3, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Jul 3, 2026 · Apt 1R
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Jul 3, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Jul 3, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the the floors at public hall, 1st story
Jul 3, 2026
Open — Nov sent out - BHazardous
Provide heavy duty mortise lock and assembly for building entrance door from the street at public hall, 1st story
Jul 3, 2026
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures ... in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north
Jun 23, 2026 · Apt 1F
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vertical cracked bricks between 4th, and 5th window from south at north exterior wall (building front) , 2nd story
Sep 18, 2025
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 18, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective horizontal cracked bricks between 4th, and 5th window from south at north exterior wall (building front) , 2nd story
Sep 18, 2025
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum allowable temperature of 130 degrees in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Jun 25, 2025 · Apt 2F
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ...
Jun 25, 2025
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum allowable temperature of 130 degrees in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jun 25, 2025 · Apt 2B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — First no access to re- inspect violation - CImmediately hazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Apr 16, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Apr 16, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Apr 16, 2025 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Apr 16, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Apr 16, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Apr 16, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Apr 16, 2025 · Apt 1B
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt apt2f, 2nd story, 1st apartment from north at east
Jan 24, 2025 · Apt APT2F
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt apt2f, 2nd story, 1st apartment from north at east
Jan 24, 2025 · Apt APT2F
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 24, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt apt2f, 2nd story, 1st apartment from north at east
Jan 24, 2025 · Apt APT2F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Jan 17, 2025 · Apt 2F
Open — Defect letter issued - CImmediately hazardous
Properly repair or replace the broken or defective latch set at public hall, 1st story
Dec 2, 2024
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2024
Closed — Violation dismissed
DOB building violations · 1
- Construction other optional
C-construction other optional
Oct 25, 2000
Dob violation - active
ECB violations · 1
- Non-hazardous
Illegal occupancy:occupancy contrary to that allowed by dept of building.occupancy change from basement to parking pad,at north.suggested rem:discontinue the illegal parking and storage of vehicles.
Oct 25, 2000 · Penalty $800
Active
Complaints
- Electric
Power outage
Sep 14, 2026 · Apt BLDG
Close - Plumbing
Toilet
Sep 14, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Sep 14, 2026 · Apt 2B
Close - Water leak
Slow leak
Aug 12, 2026 · Apt 1R
Close - Unsanitary condition
Mold
Aug 12, 2026 · Apt 1R
Close - Electric
Power outage
Jul 8, 2026 · Apt 1R
Close - Electric
Power outage
Jul 8, 2026 · Apt 1F
Close - Electric
Power outage
Jul 8, 2026 · Apt 5F
Close - Electric
Power outage
Jul 4, 2026 · Apt 1F
Close - Electric
Power outage
Jul 1, 2026 · Apt 1R
Close
Show 40 more ↓
- Electric
No lighting
Jun 23, 2026 · Apt 1F
Close - Electric
Power outage
Jun 22, 2026 · Apt 1F
Close - Electric
Power outage
Jun 22, 2026 · Apt 1F
Close - Heat/hot water
Apartment only
Mar 23, 2026 · Apt 1B
Close - Heat/hot water
Entire building
Mar 2, 2026 · Apt BASEME
Close - Electric
Power outage
Jan 3, 2026 · Apt BASEME
Close - Heat/hot water
Apartment only
Nov 21, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Nov 21, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Nov 21, 2025 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Jul 12, 2025 · Apt BLDG
Close - Water leak
Slow leak
Apr 15, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt APT2F
Close - Heat/hot water
Apartment only
Jan 15, 2025 · Apt 2F
Close - Appliance
Electric/gas range
Jan 7, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 7, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 14, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 29, 2024 · Apt 2F
Close - Unsanitary condition
Pests
Sep 23, 2024 · Apt 1F
Close - Unsanitary condition
Pests
Sep 23, 2024 · Apt 1F
Close - Safety
Window guard broken/missing
Sep 23, 2024 · Apt 1F
Close - Unsanitary condition
Pests
Sep 23, 2024 · Apt 1F
Close - Water leak
Slow leak
May 29, 2024 · Apt 1R
Close - Paint/plaster
Wall
May 29, 2024 · Apt 1R
Close - Unsanitary condition
Pests
May 29, 2024 · Apt 1R
Close - Plumbing
Water supply
May 29, 2024 · Apt 1R
Close - Water leak
Slow leak
May 29, 2024 · Apt 1R
Close - Heat/hot water
Apartment only
Apr 19, 2024 · Apt 2B
Close - Heat/hot water
Apartment only
Apr 15, 2024 · Apt 2B
Close - Heat/hot water
Apartment only
Apr 6, 2024 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 29, 2024 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 6, 2023 · Apt 2F
Close - Unsanitary condition
Pests
Nov 6, 2023 · Apt 1F
Close - Unsanitary condition
Pests
Nov 6, 2023 · Apt 1F
Close - Unsanitary condition
Pests
Nov 6, 2023 · Apt 1F
Close - Heat/hot water
Apartment only
Aug 10, 2023 · Apt 1R
Close - Plumbing
Water supply
Aug 5, 2021 · Apt 2R
Close - Plumbing
Water supply
May 18, 2021 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 16, 2020 · Apt 1B
Close - Plumbing
Toilet
Aug 28, 2020 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1930
- Floors
- 2
- Residential units
- 4
- Building area
- 3,198 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 305
- Council district
- 42
- Block / lot
- 3837 / 44
- Assessed value
- $221,850
- Landmark / historic district
- No
HPD registration #332766, last renewed Jun 5, 2025.
Questions about 580 Georgia Avenue
Who owns 580 Georgia Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Georgia Mgmt INC..
Does 580 Georgia Avenue have violations?
Yes. NYC HPD has recorded 451 housing violations at this property.
Is 580 Georgia Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 580 Georgia Avenue built?
City records list 1930 as the year it was built.
How many apartments are in 580 Georgia Avenue?
It has 4 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.