321 Wyona Street
Brooklyn, NY 11207BBL 3-03758-0022Map
Owner of record: Ramirez, Joel
321 Wyona Street is a walk-up apartment building built in 1901 in Brooklyn, 11207. It has 8 residential units across 2 floors. The owner of record is Ramirez, Joel. HPD has recorded 96 housing violations here, most recently on November 11, 2012.
- HPD violations
- 96
- DOB violations
- 1
- ECB violations
- 8
- HPD complaints
- 184
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 96
- CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story
Nov 11, 2012 · Apt 1
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2, 2nd story, apartment at east
May 23, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective light switch at south wall, in the private hallway located at apt 2, 2nd story, apartment at east
May 23, 2012 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall, in the kitchen located at apt 2, 2nd story, apartment at east
May 23, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly secure the loose washbasin, in the bathroom located at apt 2, 2nd story, apartment at east
May 23, 2012 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisnace consisting of rodents rats, in the entire apartment located at apt 2, 2nd story, apartment at east
May 23, 2012 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the missing ceramic wall tile at bathtub, (north and south walls) in the bathroom located at apt 2, 2nd story, apartment at east
May 23, 2012 · Apt 2
Closed — Violation closed - BHazardous
§ 233 m/d law remove door from closet leading to scuttle opening in roof at at public hall, 3rd story
May 18, 2012
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at the north wall in the bathroom located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the walls in the kitchen located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the kitchen located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair the broken or defective upper sash at window in the kitchen located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Replace with new the broken or defective moulding at window in the kitchen located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall in the kitchen located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east at north located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from east at north located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from east at north located at apt 2fl, 2nd story
May 13, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 1, 1st story
May 2, 2012 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls in the kitchen located at apt 1, 1st story
May 2, 2012 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls in the bathroom located at apt 1, 1st story
May 2, 2012 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 1, 1st story
May 2, 2012 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of evidence of water leak ceiling in the bathroom located at apt 1, 1st story
May 2, 2012 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1, 1st story
May 2, 2012 · Apt 1
Closed — Violation closed - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for cellar apartment (vacate no. 95394)
May 2, 2012
Closed — Violation closed - CImmediately hazardous
Abate the nuisnace consisting of rodents rat excreta at kitchen in the entire apartment located at apt 1, 1st story
May 2, 2012 · Apt 1
Closed — Violation closed - BHazardous
Replace with new the missing door handle in the entrance located at apt 1, 1st story
May 2, 2012 · Apt 1
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at cellar
Apr 23, 2012
Closed — Violation closed - BHazardous
Discontinue the rooming unit at cellar ( 3rd room from west at north )
Apr 23, 2012
Closed — Violation closed - BHazardous
Discontinue the rooming unit at cellar ( 1st room from west at north )
Apr 23, 2012
Closed — Violation closed - CImmediately hazardous
Abate the nuisnace consisting of rodents / rats at cellar
Apr 23, 2012
Closed — Violation closed - BHazardous
Discontinue the rooming unit at cellar ( 2nd room from west at north )
Apr 23, 2012
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder,key operated lock at metal gate next to front entrance door to building , 1st story
Apr 19, 2012
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at bathroom at south at cellar
Apr 19, 2012
Closed — Violation closed - BHazardous
Replace with new the missing door 1 st sty public hall to cellar
Apr 19, 2012
Closed — Violation closed - BHazardous
Properly secure the loose window in the kitchen located at apt 2fl, 2nd story
Apr 16, 2012 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2fl, 2nd story
Apr 16, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective connection at waste line at wash basin in the bathroom located at apt 2fl, 2nd story
Apr 16, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east and south wall in the bathroom located at apt 2fl, 2nd story
Apr 16, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling. in the 2nd room from east at north located at apt 2fl, 2nd story
Apr 16, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east at north located at apt 2fl, 2nd story
Apr 16, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the foyer located at apt 2fl, 2nd story
Apr 16, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the kitchen located at apt 2fl, 2nd story
Apr 16, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Apr 16, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair the broken or defective mortise lock at building entrance door , 1st story
Apr 16, 2012
Closed — Violation closed - BHazardous
Properly secure the loose balustrade at public hall stairs, 2nd story
Apr 16, 2012
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Mar 26, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 2fl, 2nd story
Mar 26, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 2fl, 2nd story
Mar 26, 2012 · Apt 2FL
Closed — Violation closed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed
ECB violations · 8
- Class - 2
Occupancy contrary to that allowed by cofo & dob records 3bedroom created at cellar. partitions erected creating rooms with locked wood doors intact. bathroom created with water closet & stall shower present in
Apr 19, 2012 · Penalty $6,000
Resolve - Class - 2
Occupancy contrary to that allowed by cofo & dob records 3 rms createdfor living at cellar. partitions erected creating rooms with lockable doors. stall shower area present inadequate light & ventilation expose
Mar 21, 2012 · Penalty $6,000
Resolve - Class - 1
Failure to correct condition(s) cited in nov 34831144h for work done w/o apermit(construction,plumbing work etc)rem:correct condition(s) cited
Oct 19, 2010 · Penalty $24,000
Resolve - Class - 2
Fail to file c of c with dob pursuant to 28-204.2 for viol # 34831145jillegally converted bldg. remedy: file c of c
Jun 10, 2010 · Penalty $4,000
Resolve - Class - 1
Fail to correct conditions cited in nov 34831149h. for installed partitions etc w.o a permit. remedy: correct conditions cited.
Jun 10, 2010 · Penalty $12,000
Resolve - Class - 2
Work w/o a permit noted @ cellar level erected partitions creating 2 single room occupancy w/ doors & locks @ 2nd fl erected partitions creating 5 rooms w/ doors & locks remedy: obtain permits or restore to
Jun 4, 2010 · Penalty $4,000
Resolve - Class - 1
Work w/o a permit work noted @ bsmnt level erected full ht partitions creating 3 rooms @ 2nd fl erected full ht partitions creating 5 rooms remedy: obtain permit or restore to prior legal condition
Jan 25, 2010 · Penalty $8,000
Resolve - Class - 1
Residence altered for occupancy as a dwelling for more than the legally approved # of families dob records indicates premises to be legally approved for a 2 family bsmnt boiler storage now premises converted
Jan 25, 2010 · Penalty $17,000
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 21, 2022 · Apt 2FL
Close - Electric
Power outage
Mar 12, 2022 · Apt 1
Close - Heating
Heat related
Nov 7, 2012 · Apt NA
Close - Heating
Heat related
Nov 5, 2012 · Apt NA
Close - Nonconst
Vermin
May 22, 2012 · Apt 2
Close - Paint/plaster
Wall
May 9, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
May 9, 2012 · Apt 2FL
Close - General
Windows
May 9, 2012 · Apt 2FL
Close - Paint/plaster
Wall
May 9, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
May 9, 2012 · Apt 2FL
Close
Show 40 more ↓
- Plumbing
Water-leaks
May 9, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
May 9, 2012 · Apt 2FL
Close - Nonconst
Vermin
May 1, 2012 · Apt 1
Close - General
Doors
May 1, 2012 · Apt 1
Close - Paint/plaster
Wall
May 1, 2012 · Apt 1
Close - Paint/plaster
Wall
May 1, 2012 · Apt 1
Close - Paint/plaster
Ceiling
May 1, 2012 · Apt 1
Close - Paint/plaster
Ceiling
May 1, 2012 · Apt 1
Close - Nonconst
Vermin
Apr 25, 2012 · Apt 2FL
Close - General
Doors
Apr 18, 2012 · Apt BLDG
Close - Heating
Heat-plant
Apr 18, 2012 · Apt BLDG
Close - General
Doors
Apr 15, 2012 · Apt 2FL
Close - General
Mold
Apr 15, 2012 · Apt 2FL
Close - General
Locks
Apr 15, 2012 · Apt 2FL
Close - Paint/plaster
Wall
Apr 15, 2012 · Apt 2FL
Close - Paint/plaster
Wall
Apr 15, 2012 · Apt 2FL
Close - Paint/plaster
Ceiling
Apr 15, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Apr 15, 2012 · Apt 2FL
Close - Paint/plaster
Ceiling
Apr 15, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Apr 15, 2012 · Apt 2FL
Close - Paint/plaster
Ceiling
Apr 15, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Apr 15, 2012 · Apt 2FL
Close - General
Stairs
Apr 15, 2012 · Apt 2FL
Close - General
Doors
Apr 15, 2012 · Apt 2FL
Close - General
Stairs
Apr 15, 2012 · Apt 2FL
Close - Plumbing
Toilet
Apr 15, 2012 · Apt 2FL
Close - Plumbing
Basin/sink
Apr 15, 2012 · Apt 2FL
Close - General
Ceramic-tile
Apr 15, 2012 · Apt 2FL
Close - Heating
Heat related
Apr 15, 2012 · Apt 2FL
Close - Paint/plaster
Wall
Mar 23, 2012 · Apt 2FL
Close - Paint/plaster
Wall
Mar 23, 2012 · Apt 2FL
Close - Paint/plaster
Wall
Mar 23, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Mar 23, 2012 · Apt 2FL
Close - Paint/plaster
Ceiling
Mar 23, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Mar 23, 2012 · Apt 2FL
Close - Paint/plaster
Ceiling
Mar 23, 2012 · Apt 2FL
Close - Paint/plaster
Window/frame
Mar 23, 2012 · Apt 2FL
Close - General
Windows
Mar 23, 2012 · Apt 2FL
Close - Plumbing
Basin/sink
Mar 23, 2012 · Apt 2FL
Close - Plumbing
Bathtub/shower
Mar 23, 2012 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1901
- Floors
- 2
- Residential units
- 8
- Building area
- 3,000 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6
- Community board
- 305
- Council district
- 42
- Block / lot
- 3758 / 22
- Assessed value
- $243,000
- Landmark / historic district
- No
HPD registration #826736, last renewed Jun 10, 2026.
Questions about 321 Wyona Street
Who owns 321 Wyona Street?
The owner of record in NYC Department of City Planning PLUTO data is Ramirez, Joel.
Does 321 Wyona Street have violations?
Yes. NYC HPD has recorded 96 housing violations at this property.
Is 321 Wyona Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 321 Wyona Street built?
City records list 1901 as the year it was built.
How many apartments are in 321 Wyona Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.