314 Pennsylvania Avenue
Brooklyn, NY 11207BBL 3-03754-0033Map
Owner of record: Penn Hotel LLC
314 Pennsylvania Avenue is a hotel built in 2018 in Brooklyn, 11207. The owner of record is Penn Hotel LLC. HPD has recorded 14 housing violations here, most recently on June 30, 2005.
- HPD violations
- 14
- DOB violations
- 5
- ECB violations
- 41
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- BHazardous
Provide an adequate supply of gas to the fixtures gas range kitchen 1 sty. apt. 1 at north extension.
Jun 30, 2005
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice and roaches throughout 1 sty. apt. 1 at north extension.
Jun 30, 2005
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cement floor bathroom 1 sty. apt. 1 at north extension.
Jun 30, 2005
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles bathroom 1 sty. apt. 1 at north extension.
Jun 30, 2005
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in washbasin bathroom 1 sty. apt. 1 at north extension.
Jun 30, 2005
Closed — Violation closed - BHazardous
§ 27-2005,2007 admon. code: fire egress defective. remove obstructing bars or gates from at least 1 window. . at west room 1 sty. apt. 1 at north extension.
Jun 30, 2005
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet kitchen 1 sty. apt. 1 at north extension.
Jun 30, 2005
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls at east room 1 sty. apt. 1 at north extension.
Jun 30, 2005
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom 1 sty. apt. 1 at north extension.
Jun 30, 2005
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock entrance door 1 sty. apt. 1 at north extension.
Jun 30, 2005
Closed — Violation closed
Show 4 more ↓
- CImmediately hazardous
Replace with new the missing flush pipe connection for water closet bathroom, 1st story apt 1, at north extension. er1
Jun 30, 2005
Closed — Violation closed - BHazardous
Replace with new the missing washbasin bathroom, 1st story apt 1, at north extension.
Jun 30, 2005
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet center & front room, 1st story apt 1, north extension.
Jun 30, 2005
Closed — Violation closed - BHazardous
Properly repair the broken or defective entrance door to 1st story apt 1, at north extension.
Jun 30, 2005
Closed — Violation closed
DOB building violations · 5
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 13, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jul 24, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jul 24, 2018
Vp*-violation unserved ecb- dismissed
ECB violations · 41
- Class - 1
I observed the main ground conductor installed under the concrete floor from the water meter through the fire pump room and out of the floor in the fuel pump room on the way to the main electrical room. the gro
Dec 13, 2024 · Penalty $4,800
Resolve - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetrations located in utility/mechanical rooms throughout buildin
Sep 30, 2024 · Penalty $2,500
Resolve - Class - 2
Sws doesnt meet code spec note:ato my insp of 7stynb i observed@exp1 sws w/following objection,inoperable light bulbs.this creates hazardouscondition for pedestrian using underpass.provide 6mnth insp from sws c
Oct 18, 2021 · Penalty $5,000
Resolve - Class - 2
Bc33141-proposed scaffold does not meet code specification at the timeof inspection i observed proposed scaffold in place at exp1&2 and exp3installed supported scaffold does meet code specification vertical saf
Mar 25, 2020 · Penalty $1,250
Resolve - Class - 2
Sws not extended as per code. at time of inspection the sws did not extend out 5 pass the work area of the jobsite to protect pedestrians asthey pass the jobsite. anything can hit someone as they walk by as"per
Feb 6, 2020 · Penalty $5,000
Resolve - Class - 1
Overhead protection,adjacent property. at time of inspection,i observed no roof protection at exp#2 on top of a adjacent property overhead protection is needed to protect pedestrians & property there is no plyw
Feb 6, 2020 · Penalty $10,000
Resolve - Class - 2
Superintendent failed to perform duties as per rule.at time of inspection on an active 7 story nb construction site notice conditions throughout the site that was dangerous/hazardous that the construction super
Jan 13, 2020 · Penalty $5,000
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments(site safety plan)at time of inspeciotn on an active 7 story construction site notice that contractor fail to maintain the site
Jan 13, 2020 · Penalty $625
Resolve - Class - 2
Bc330910-failure to provide/adequately protect adjacent roof.at time of inspection on an active 7 story nb construction site.notice that thecontractor fail to adequately protect the roof at the adjacent propert
Jan 13, 2020
Resolve - Class - 2
Bc3314-failure to maintain supported scaffold on site as per code.at time of inspection on an active 7 story nb construction site,notice that the supported scaffold at exposure#1&3 the contractor fail to mainta
Jan 13, 2020 · Penalty $1,250
Resolve
Show 31 more ↓
- Class - 2
Bc33077-failure to maintain construction fnce on site as per code.at time of inspection on an active 7 story nb construciton site.notice portions of the construciton fence was missing at exposure#2&3 allowing t
Jan 13, 2020
Resolve - Class - 1
Bc33038-failure to provide standpipe in a state of readiness as required by code.at time of inspection on an active 7 story nb construction site.notice active work on this building that has reached more than 75
Jan 13, 2020
Resolve - Class - 1
Bc330312-failure to provide hoist in a state of readiness as required by code.at time of inspeciton on an active 7 story nb construction site notice active work on this building that has reached more than 75' a
Jan 13, 2020 · Penalty $625
Resolve - Class - 2
Bc330723-failure to protect or adequately protect adjoining property during construciton-overhead protection.at time of inspection on an active 7 story nb construction site.notice at exposure#2 of the site that
Jan 13, 2020 · Penalty $1,250
Resolve - Class - 2
Bc33016-failure to provide design drawings for platforms onsite.at time of inspeciton on an active 7 story nb construciton site,notice 2 platform in the elevator shaft in the cellar a platform at exposure#3 nex
Jan 13, 2020
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.as noted:at time of inspection of an 7 story building observed work adjacent on full stop work order where worked was working making holes on exp #
Jun 14, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to protect or adequately protect adjacent space.overhead pro tection. at time of inspection on an active construction site, 7 storynew building, notice that work was in progress at exp1 and 2 of the
Jun 3, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. at time of inspection on an active construction site 7 story new building notice concrete core's that were drilled out from con
Jun 3, 2019 · Penalty $5,000
Resolve - Class - 1
Superintendent fail to designate or have competent person for construction site. at time of inspection on an active construction site 7storynew building, notice workers working in front of building installing
Jun 3, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to maintain adequate housekeeping thorughout site. at time of inspection on an active construction site 7 story new building, noticeinadequate housekeeping throughout the construction site on floors 1,
Jun 3, 2019
Resolve - Class - 2
Bc3309.1 adequately protect adjoining property with roof protection. at time of inspection on an active construction site,notice that the roof protection for the adjoining building at exp2 was not adequately
Jun 3, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to safeguard all person and property affected by construction operation. as noted:at time of inspection on an active construction observed roof level exposure#1,failure to provide overhead protection by
May 2, 2019 · Penalty $5,000
Resolve - Class - 2
Pedestrian protection does not meet code specifications.noted:observedsidewalk shed lights are not operating @time of inspection 8:00pm.rem:comply with code.
Feb 8, 2019
Resolve - Class - 1
Superintendent duties(no superintendent/competent person)noted::at time of inspection of active jobsite @ 1 story observed no superintendent/competent person on site.at time of my inspection.stop all work.provi
Dec 13, 2018 · Penalty $10,000
Resolve - Class - 2
Insulation placement do not meet min reg nb#321195416 in an energy compliance inspection i observed foundation walls are being installed without rigid insulation(rs) at the outside of the wall as per required o
Nov 16, 2018 · Penalty $2,030
Resolve - Class - 1
Failure to provide unobstructed exit passageways. at the time of my inspection of a 7 story building currently at first floor level with construction operations in progress. i observed a makeshift ladder at exp
Oct 26, 2018 · Penalty $1,250
Resolve - Class - 1
Sec. 3301.2 failure to maintain required means of egress/inegress: at the time of my inspection of a 7 sty bldg currently at 1st fl level w/construction operations in progress. i observed in safe means of egres
Oct 26, 2018 · Penalty $3,750
Resolve - Class - 1
Failure to maintain adequate housekeeping.at the time of inspectio of a 7 story building at foundation level with construction operations inprogress.i observed cement concrete and wood debri scattered all over
Sep 6, 2018 · Penalty $625
Resolve - Class - 2
Failure to have competent person on site as required. at time of inspection of a new 7 sty bldg under construction at foundation stage,active jobsite w/3 workers &(reissuing)safety issues,upon request for the
Jul 24, 2018
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. at time of inspection of a new 7 sty bldg under construction at foundation stage,active job site,i observed that there was a larg
Jul 24, 2018
Resolve - Class - 2
Construction superintendent fails to provide jobsite logs as required. at time of inspection of a 7 sty new bldg under construction at foundation stage,active job site,upon request for the construction superint
Jul 24, 2018
Resolve - Class - 2
Work does not conform to approved construction documents or approved amendemnts.at the time of inspection the soe work observed does not conform to the approved soe plan.the approved soe plan shows five solider
Jun 12, 2018 · Penalty $620
Resolve - Class - 1
Housekeeping. observed inadequate housekeeping. consisting of const material laying scattered on floor at foundation level creating a trip and fall hazard. this condition also created a hazard for first emer
Jun 9, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to maintain safe operations at site observed active site, 6 workers preset, workers were below grade apprx 20'down with no overhead protection or safety measures in plate to protect from falling debri
Jun 9, 2018 · Penalty $10,000
Resolve - Class - 2
Failure to maintain sidewalk observed, voids, cracks, loose fill,un keyed slabs creating a trip and fall hazard for pedestrians. rmdy: repair and maintain sidewalk as per code.
Jun 9, 2018
Resolve - Class - 1
Construction superintendent failed to perform duties as per code, the following violations and swo were issued on this day, 1-failure to maintain safety measures, 2-no ohp for workers below grade; 3-sidewalk
Jun 9, 2018 · Penalty $10,000
Resolve - Class - 1
Failure to maintain documents on site observed, homemade/fabricated platform and stairs at exp1 constructed from dimensional lumber and plywood. upon request for design drawing for wood stairs to show load,
Jun 9, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain egress. observed, active construction site 6 workers present, operating 20' below grade,workers at rear of site exp3 and4 had no adequate means of egress, workers had to scurry up and down
Jun 9, 2018
Resolve - Class - 2
Logs. upon a review of construction superintendent logbook at site, i observed that there was no indication in log for violating conditions at site, such as no egress at exp4 from rear of site, workers operat
Jun 9, 2018
Resolve - Class - 2
Construction fence. construction fence at exp2,3,4 is loose out of plumb leaning into site with workers operating 20'below at foundation level, also gate to site at exp7 opens out onto sidewalk hindering pedest
Jun 9, 2018
Resolve - Class - 2
Temporary constructin job site plywood fence not maintained pursuant sub section.as noted at time of inspection on construction site at exposure #2 and #4.plywood not painted hunte green,viewing panel missing
Feb 9, 2018
Resolve
Complaints
- Heating
Heat related
Feb 10, 2014 · Apt PH
Close - Plumbing
Water supply
Jun 14, 2010 · Apt 1
Close - Plumbing
Water supply
Jun 9, 2010 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2018
- Floors
- 7
- Residential units
- —
- Building area
- 20,312 ft²
- Lot area
- 5,000 ft²
- Zoning
- C4-3
- Community board
- 305
- Council district
- 42
- Block / lot
- 3754 / 33
- Assessed value
- $2,579,850
- Landmark / historic district
- No
HPD registration #391301, last renewed Jun 5, 2025.
Questions about 314 Pennsylvania Avenue
Who owns 314 Pennsylvania Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Penn Hotel LLC.
Does 314 Pennsylvania Avenue have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 314 Pennsylvania Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 314 Pennsylvania Avenue built?
City records list 2018 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.