2685 Atlantic Avenue
Brooklyn, NY 11207BBL 3-03671-0038Map
Owner of record: 2683 Atlantic LLC
2685 Atlantic Avenue is an elevator apartment building built in 2025 in Brooklyn, 11207. It has 229 residential units. The owner of record is 2683 Atlantic LLC. HPD has recorded 45 housing violations here, most recently on May 7, 2026.
- HPD violations
- 45
- DOB violations
- 43
- ECB violations
- 49
- HPD complaints
- 64
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 45
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 8, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation closed
Show 35 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 16, 2021
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2019
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building front at fire escape
Mar 28, 2018
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at buildung front at fire escape
Mar 28, 2018
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of icandescent light required at front areaway, 1st story
Aug 30, 2017
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 21, 2017
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of building materials at public hall, 1st story
Aug 21, 2017
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from south at west
Aug 16, 2017 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 2r, 2nd story, 1st apartment from south at west
Aug 16, 2017 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Aug 16, 2017 · Apt 2R
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Aug 16, 2017 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Aug 16, 2017 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south and west wall in the 3rd room from north located at apt 2r, 2nd story, 1st apartment from south at west
Aug 16, 2017 · Apt 2R
Closed — Violation closed - BHazardous
Replace with new the missing electrical outlet cover at west wall in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from south at west
Aug 16, 2017 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair the broken or defective door lock at building front entrance , 1st story
Aug 16, 2017
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder ..building front , 2nd story
Aug 10, 2017
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 23, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 19, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 2, 2015
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in bathtub wasteline, in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Aug 25, 2012 · Apt 3R
Closed — Violation closed - ANon-hazardous
Replace with new the missing caulking around window casing and frame, in the 2nd room from north at west located at apt 3r, 3rd story, 1st apartment from south at west
Aug 25, 2012 · Apt 3R
Closed — Violation closed - ANon-hazardous
Refit thermal windows upper and lower sashes, in the 2nd room from north at west located at apt 3r, 3rd story, 1st apartment from south at west
Aug 25, 2012 · Apt 3R
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at building front. , 1st story
Aug 25, 2012
Closed — Violation closed - BHazardous
Properly secure the loose electric light switch junctiion box at west wall, in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Aug 25, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the missing electric wall outlet cover at west wall, in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from south at west
Aug 25, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the missing ceramic tile at west wall adjacent to radiator, in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Aug 25, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell buzzer intercommunication system, in the entrance located at apt 3r, 3rd story, 1st apartment from south at west
Aug 25, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 3r, 3rd story
Aug 25, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the broken or defective thermal window upper sash exterior glass pane, in the 1st room from north at west located at apt 3r, 3rd story, 1st apartment from south at west
Aug 25, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in washbasin wasteline, in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Aug 25, 2012 · Apt 3R
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts all balconies building front at fire escape
Aug 20, 2012
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder building front at fire escape
Aug 20, 2012
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint fire escape at building front
Jan 31, 2010
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder fire escape at front of the building
Jan 31, 2010
Closed — Violation closed
DOB building violations · 43
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Unsafe buildings none
Ub-unsafe buildings none
Feb 8, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Structurally compromised building none
Failure to submit an acceptable inspectn rpt for structurally compromised bldg.
Sep 14, 2022
Dob violation - dismissed - Structurally compromised building none
Failure to submit an acceptable inspectn rpt for structurally compromised bldg.
Sep 14, 2022
Dob violation - dismissed
Show 33 more ↓
- Construction other optional
Failure to comply with commish order#322395 12/13/19 requiring owner to remove debris on low roof and retain nyspe to evaluate entire bldg and prepare repair drwgs.bldg repairs to start by 1/20/20 & be complet by 3/27/20 under permit.no prmt for repairs work has been obtained as of 6/19/20.immediate comply with commissioner's ordr# 121319feu30505pn
Jun 19, 2020
Dob violation - active - Construction other optional
Failure to comply with commish order#322394 12/13/19 requiring owner to remove debris on low roof and retain nyspe to evaluate entire bldg and prepare repair drwgs.bldg to start repairs under prmit by 1/20/20 & be completed by 3/27/20.no prmt for repairs has been obtained as of 6/19/20.immediate comply with commissioner's order#(121319feu30505pn)
Jun 19, 2020
Dob violation - active - Emergency none
Seal building from unauthorized access
Dec 18, 2019
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Dec 17, 2019
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Dec 17, 2019
Dob violation - dismissed - Construction other optional
Ftm bldg fire on 1/19/19.various roof opengs-inadq seal-mod fire dmg @ 2,3,roof frmg&walls&exp2&3.fire separation compromised@exp2 wall,2fl btwn 2681&2679.excess debris stored in 1stry rear roof ext.ownr remove debris-low roof& retn pe eval entire bldg& prepare repai drwgs.repairs undr prmt-start 1/20/2020-complete by 3/2/2020
Dec 13, 2019
Dob violation - active - Construction other optional
Failure to maintain-due to fire-1/19/19,bldg various roof openings, inadeq seal,compromised fire separation btwn 2681/2679,moderate dmg @ roof framing walls @ 2&3fl & exp3 wall. excess debris stored in 1stry rear roof ext.owner remove debris-low roof & retn pe eval entire bldg &prep rpr drwgs.rprs strt undr prmt 1/20/20-complete by 3/27/20
Dec 13, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Immediate emergency anythingoptional
Seal all accessible openings,and erect approx. 35 linear feet of sidewalk shed at front of bldg to protect the public. remove debris from public sidewalk
Jan 22, 2019
Dob violation - dismissed - Immediate emergency anythingoptional
Seal all accessible openings,and erect approx. 30 linear feet of sidewalk shed at front of bldg to protect the public. remove debris from public sidewalk
Jan 22, 2019
Dob violation - dismissed - Construction other optional
Due to fire
Jan 19, 2019
Dob violation - active - Construction other optional
Due to fire
Jan 19, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 24, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 10, 1995
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 29, 1990
Vp-violation unserved ecb-active
ECB violations · 49
- Class - 1
Atoi observed 13 stories. nb/tco issued. building partially occupied; workers observed throughout. work in cel 5-13. no tpp found in dob records. stop all gc work under b00683623-i1-gc. provide/post tpp for occ
Sep 25, 2026 · Penalty $10,000
Active - Class - 1
Atoi at observed failuare to file requiered tenant protection plan (tpp) nb partially occupied on floors 2nd ,3rd &4th , floors, 5th floor to 13th floors mechanical work taken place while reviewing dob records,
Sep 25, 2026 · Penalty $10,000
Active - Class - 1
Atoi observed failuare to file requiered tenant protection plan (tpp) nb partially occupied on floors 2nd ,3rd &4th , floors,cell, 5th - 13th floors work taken place plumbers worked at cellar & osp while review
Sep 25, 2026 · Penalty $10,000
Active - Class - 1
Altered/changed building occupied without a valid certificate of occupancy: at the time of inspection, observed new building constructed under job #b00683623 for proposed new 13-story building with several dwel
Sep 9, 2026 · Penalty $2,500
Active - Class - 2
Bc 3301.1.3 at time of inspection, a yodock barrier system was observed with missing interlocking couplers throughout and barriers not all filled with water or sand as required. this condition creates a safety
Jun 12, 2026 · Penalty $1,250
Resolve - Class - 2
No en drawing approved from dob provided on the job site at the time of inspection., maintain/display required documents; contact via email: [email protected]
Jun 4, 2026 · Penalty $1,250
Resolve - Class - 2
Bc 3314.1 13-story new building active job site, pipe scaffold at exposures 1, 2, 3, and 4, including inside the building, was not properly maintained and was missing supported pin & guardrails creating a hazar
May 20, 2026 · Penalty $2,530
Resolve - Class - 1
Bc3307.4 at the time of inspection of a 13-story active job site, materials were stored in the street at exp#4 approximately 6 feet high without protection adjacent to the pedestrian walkway, creating a hazard
May 20, 2026 · Penalty $5,030
Resolve - Class - 1
At the time of my inspection, responding to an incident that object fell from building and fell onto car, investigation reveal that a pin from the form work fell from construction jobsite and went into a car re
Apr 13, 2026 · Penalty $10,000
Resolve - Class - 2
At the time of my inspection, responding to an incident that object fell from building and fell unto car. i observed workers installing pipe scaffolding and some receiving sheet rock from boom truck at the same
Apr 13, 2026 · Penalty $5,000
Resolve
Show 39 more ↓
- Class - 1
At the time of my inspection, i observed workers installing pipe scaffolding at 13 floor and some receiving sheet rock from boom truck at the same time on the 4 floor exposure #1.there were no signs that says s
Apr 13, 2026 · Penalty $5,000
Resolve - Class - 2
At the time of reinspection of a class #1 summons, i observed site closed no construction activities. upon reviewing the department records i observed no certificate of correction has been file for summon#39549
Apr 6, 2026
Resolve - Class - 2
A proposed 13-story building, an active job site, concrete pouring operations were in progress. concrete was observed discharged onto the roadway and into a sewer line, creating a hazardous condition to the pub
Mar 16, 2026 · Penalty $2,500
Resolve - Class - 2
Bc 3307.4.7.at a proposed 13-story building, active job site, jersey barriers at the work and storage zone were not maintained, not interlocked, and not filled with water, creating a hazardous condition with p
Mar 16, 2026 · Penalty $2,500
Resolve - Class - 1
Bc3308.6.1.4: a proposed 13-story active job site, concrete operations were in progress. ultimate protective scaffold at exp 3 and 4 was not erected to the working deck and was observed3fl below the work area,
Mar 16, 2026 · Penalty $5,000
Resolve - Class - 1
Inspection of a proposed 13 story building were a worker was injured on the 3rd floor. i requested to review the pre-shift safety meeting logbook. the logbook revealed that there was no documented discussing on
Feb 17, 2026 · Penalty $5,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. attime of inspection per section requirements. at time of inspection observed at 3rd sty level with pipes, metal packing components and other
Feb 16, 2026
Resolve - Class - 2
At the time of my inspection of a proposed 13-story active construction site, piles of debris were observed throughout the job site. these conditions present a potential fire hazard and pose a risk to workers,
Feb 1, 2026 · Penalty $1,280
Resolve - Class - 2
Bc3301.5 at the time of my inspection of a proposed 13-story active construction site, a damaged and tampered frame ladder was observed in use, secured with rebar and tie wire. this condition creates a hazard t
Feb 1, 2026 · Penalty $2,500
Resolve - Class - 1
At the time of my inspection of a proposed 13-story building, an unprotected floor opening was observed on the third floor without a guardrail system, creating a hazardous condition. , maintain a 10-foot setbac
Feb 1, 2026 · Penalty $5,000
Resolve - Class - 2
Bc 3303.6 proposed 13 story building active job site i observe concrete operations in progress i observe temporary heting system in placed on the floor below with fire escape asht inadequate the permanent st
Feb 1, 2026 · Penalty $2,500
Resolve - Class - 2
Bc 3307.2.1at the time of my inspection of a proposed 13-story active construction site, concrete operations were in progress with full closure of the street and public walkway. the posted permit authorizes clo
Feb 1, 2026 · Penalty $2,500
Resolve - Class - 2
Bc3303.3 watchperson 13 story new building, building approximately square15526 feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to alert watc
Jan 31, 2026 · Penalty $2,500
Resolve - Class - 2
Bc-3307.6.5.5 & bc-3301.1 at time of inspection observed accumulation snow on sidewalk shed decks.
Jan 31, 2026 · Penalty $2,400
Resolve - Class - 2
Observed jersey barriers at exp#2 #4 not as per manufactures specification. jersey barriers not interlocked which poses a potential hazard by allowing unintended movement of the barriers increasing the risk of
Jan 31, 2026 · Penalty $1,250
Resolve - Class - 1
A unknown intruder trespass into job site and claiming accident fall. permit holder job# b00683623-i1-gc, failed to submit report within 3 business days of required 16 items to code 28-103.21 per-28-103.21.1 vi
Jan 30, 2026 · Penalty $10,000
Resolve - Class - 1
At the time of my inspection of a proposed 13-story building active job site, i observed unprotected windows on the adjacent property at exp# 4, creating a hazardous condition to public and property. stop all w
Jan 15, 2026 · Penalty $5,000
Resolve - Class - 2
At the time of my inspection of a proposed 13-story building active job site, i observed concrete operations in progress with concrete wash water discharging into the public sewer line, creating a hazardous con
Jan 15, 2026 · Penalty $2,500
Resolve - Class - 2
3301.1.2 at the time of my inspection of a proposed 13-story building active job site, i observed workers using grinders on rebar with sparks discharging onto a cage containing cylinders, creating a potential f
Jan 15, 2026 · Penalty $2,500
Resolve - Class - 1
3309.10at the time of my inspection of a proposed 13-story building, i observed missing roof protection at exp# 4 on the adjacent property, creating a hazardous condition to public and property. stop all work a
Jan 15, 2026 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection of a proposed 13-story building, i observed concrete operations in progress and fire hydrants in use without approved backflow prevention, creating a potential hazard to the public
Jan 15, 2026 · Penalty $2,500
Resolve - Class - 2
Responding an incident, where unknown intruder trespass into job site and claiming accident fall. contractor failure to provide adequate secure system at entrance door of job site creating the unsafe conditions
Dec 24, 2025 · Penalty $5,000
Resolve - Class - 1
The temporary pedestrian walkway is inadequate barriers not water-filled, not interlocked, less than 5ft bc3307
Dec 20, 2025 · Penalty $1,250
Resolve - Class - 1
At the time of my inspection of a 13 story new building at excavation phase. upon review of the department record it reveal that the site safety coordinator is designated to another job as a construction superi
Nov 13, 2025 · Penalty $5,000
Resolve - Class - 1
Bc 3307.2.1 at the time of my inspection of a 13 story new building at excavation phase, i observed at exposure # 2 yodok jersey barriers on street, upon review of the dot permit the pedestrian walkway should b
Nov 12, 2025 · Penalty $625
Resolve - Class - 1
At the time of my inspection of a 13 story new building at excavation phase, i observed at jobsite a ramp made from dirt, upon review of the approved site safety plan it reveal that the ramp should have guardra
Nov 12, 2025 · Penalty $625
Resolve - Class - 1
At the time of my inspection of a 13 story new building at excavation phase, i observed foundation of demolition building at exposure #4 upon review of the approved soe plans no foundation of demolition buildin
Nov 12, 2025 · Penalty $625
Resolve - Class - 1
At the time of my inspection of a 13 story new building at excavation phase, i observed welders welding 3 corner braces. upon review of the approved soe plans it reveal that there should be only 2 corner braces
Nov 12, 2025 · Penalty $625
Resolve - Class - 1
A time over inspection by a three-story building observed general demolition alteration work in progress without a valid permit, bis/dob now search reveal no issue permit for general construction, alteration or
Jul 17, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to maintain. at time of inspection responding to incident with nypd observed a 2story mixed use building with an open roof at 2 fl exposing property to all elements. floor at main entrance is damaged &
Mar 1, 2025 · Penalty $2,500
Resolve - Class - 2
Pedestrian protection does not meet code specification.upon inspectionobserved sidewalk shed appeared to be impacted and in disrepair.note left side of sidewalk shed leaning at exp1(along atlantic ave)posts not
Apr 13, 2022 · Penalty $2,400
Active - Class - 2
Failure to obtain a temporary construction permit prior to installation/use of temporary construction equipment(sidewalk shed)observed sidewalk shed erected at exp1(along atlantic ave)with no active permit post
Apr 13, 2022
Resolve - Class - 2
Zr 32-652 accessory 2-way business sign, approx. 5ft lg x 4ft high x 9ins. wide, with inscription "a&j global enterprises", projects approx. 7ft (84 inches) across sidewalk-which is contrary to the applicable z
Nov 30, 2017 · Penalty $800
Active - Class - 2
(1)erect illuminated awning, approx. 24 ft wide x 3ft overhang x 4ft high, with inscription "global enterprise", w/o a permit. (2)erect two-way sign approx. 10ft high x 2ft wide, shaped like a truncated triangu
Nov 30, 2017 · Penalty $800
Active - Class - 2
B265 as per class 2 (b265) 28.303.7 failure to file a complete boilerinspection report as per dob records. submit a current b09 report
Mar 27, 2017 · Penalty $2,500
Active - Class - 1
Occupancy contrary to that allowed by dept records. illegal occupancy noted: at rear of ground floor. coomercial space sub divided to createa sro 2 rooms of right & (4) rooms on left site. occupants using hot
Jan 20, 2014 · Penalty $1,200
Active - Class - 2
Work w/o a permit. work noted: at 1st fl rear full height partitions walls erected creating 6 rooms & plumbings lines installed creating 3 3pc bathrooms. remedy: obtain permit or restore premises to prior legal
Jan 20, 2014 · Penalty $800
Resolve - Non-hazardous
Work wothout a permit:worknoted:two stores division removed are now one large store remedy: obtain a permit if reasible or restore to prior legal condition, at 1st floor store.occupancy contrary to that allowed
May 20, 1994
Resolve - Non-hazardous
Occupancy contrary to the allowed by the department of buildings records from legal occupancy. to: illegal occupancy furniture space at 1st flr. remedy:distance c/o if feasible.
Dec 21, 1992 · Penalty $1,000
Active
Complaints
- Appliance
Electric/gas range
May 2, 2019 · Apt 2L
Close - Flooring/stairs
Floor
May 2, 2019 · Apt 2L
Close - Door/window
Window frame
May 2, 2019 · Apt 2L
Close - Paint/plaster
Wall
May 2, 2019 · Apt 2L
Close - Safety
Fire escape
Mar 21, 2018 · Apt BLDG
Close - Safety
Fire escape
Mar 21, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2017 · Apt 2L
Close - Unsanitary condition
Garbage/recycling storage
Aug 16, 2017 · Apt BLDG
Close - Paint/plaster
Wall
Aug 9, 2017 · Apt 2R
Close - Flooring/stairs
Floor
Aug 9, 2017 · Apt 2R
Close
Show 40 more ↓
- Electric
Wiring
Aug 9, 2017 · Apt 2R
Close - Paint/plaster
Wall
Aug 9, 2017 · Apt 2R
Close - Paint/plaster
Ceiling
Aug 9, 2017 · Apt 2R
Close - Electric
Wiring
Aug 9, 2017 · Apt 2R
Close - Safety
Carbon monoxide detector
Aug 9, 2017 · Apt 2R
Close - Unsanitary condition
Pests
Aug 22, 2014 · Apt 2L
Close - Heating
Heat related
Mar 6, 2013 · Apt 3R
Close - Heating
Heat related
Mar 2, 2013 · Apt 3R
Close - General
Floor
Aug 23, 2012 · Apt 3R
Close - Nonconst
Vermin
Aug 23, 2012 · Apt 3R
Close - Nonconst
Vermin
Aug 23, 2012 · Apt 3R
Close - Electric
Bell-buzzer/intercom
Aug 23, 2012 · Apt 3R
Close - Nonconst
Vermin
Aug 23, 2012 · Apt 3R
Close - Nonconst
Vermin
Aug 23, 2012 · Apt 3R
Close - General
Floor
Aug 23, 2012 · Apt 3R
Close - Plumbing
Radiator
Aug 23, 2012 · Apt 3R
Close - General
Floor
Aug 23, 2012 · Apt 3R
Close - General
Windows
Aug 23, 2012 · Apt 3R
Close - Plumbing
Bathtub/shower
Aug 23, 2012 · Apt 3R
Close - Plumbing
Basin/sink
Aug 23, 2012 · Apt 3R
Close - General
Windows
Aug 23, 2012 · Apt 3R
Close - General
Windows
Aug 23, 2012 · Apt 3R
Close - Nonconst
Vermin
Aug 16, 2012 · Apt 2FL
Close - General
Floor
Aug 16, 2012 · Apt 2FL
Close - Plumbing
Water supply
Jan 9, 2011 · Apt 3R
Close - Plumbing
Water supply
Jan 9, 2011 · Apt 3R
Close - Heating
Heat related
Dec 12, 2010 · Apt 3R
Close - Plumbing
Radiator
Dec 9, 2010 · Apt 3L
Close - Plumbing
Radiator
Dec 9, 2010 · Apt 3L
Close - Plumbing
Radiator
Dec 9, 2010 · Apt 3L
Close - Plumbing
Radiator
Dec 9, 2010 · Apt 3L
Close - Plumbing
Radiator
Dec 9, 2010 · Apt 3L
Close - Paint/plaster
Ceiling
Dec 3, 2010 · Apt 3R
Close - Paint/plaster
Wall
Dec 3, 2010 · Apt 3R
Close - Paint/plaster
Ceiling
Dec 3, 2010 · Apt 3R
Close - Plumbing
Water-leaks
Dec 3, 2010 · Apt 3R
Close - Plumbing
Water-leaks
Dec 3, 2010 · Apt 3R
Close - General
Floor
Dec 3, 2010 · Apt 3R
Close - General
Stairs
Dec 3, 2010 · Apt 3R
Close - General
Floor
Dec 3, 2010 · Apt 3R
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Dec 3, 2025 | Non-market transfer | Rentals - 4-10 unit | 230 |
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2025
- Floors
- —
- Residential units
- 229
- Building area
- 168,748 ft²
- Lot area
- 5,017 ft²
- Zoning
- C4-4D
- Community board
- 305
- Council district
- 37
- Block / lot
- 3671 / 38
- Assessed value
- $136,350
- Landmark / historic district
- No
HPD registration #324428, last renewed Dec 5, 2019.
Questions about 2685 Atlantic Avenue
Who owns 2685 Atlantic Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2683 Atlantic LLC.
Does 2685 Atlantic Avenue have violations?
Yes. NYC HPD has recorded 45 housing violations at this property.
Is 2685 Atlantic Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2685 Atlantic Avenue built?
City records list 2025 as the year it was built.
How many apartments are in 2685 Atlantic Avenue?
It has 229 residential units and 230 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.