2531 Atlantic Avenue
Brooklyn, NY 11207BBL 3-03665-0024Map
Owner of record: 2531 Atlantic Realty LLC
2531 Atlantic Avenue is a mixed residential and retail building built in 1910 in Brooklyn, 11207. It has 2 residential units across 3 floors. The owner of record is 2531 Atlantic Realty LLC. HPD has recorded 29 housing violations here, most recently on April 6, 2005. 29 of the 29 most recent violations are still open.
- HPD violations
- 29
- DOB violations
- 26
- ECB violations
- 1
- HPD complaints
- 15
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 29
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling southeast room 2nd. sty. apt. # 1
Apr 6, 2005
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3a, 3rd story
Jan 14, 2005 · Apt 3A
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3a, 3rd story
Nov 15, 2004 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete floor, bathroom 2nd. sty. apt. 2.
Oct 16, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective upper and lower sash window through out 3rd story apartment 2.
Oct 16, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floors thru / out 2nd. sty. apt. 2.
Oct 16, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings thru / out 2nd. sty. apt. 2.
Oct 16, 2004
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north rear yard.
Oct 16, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood floor 2nd. story public hall rear.
Oct 16, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood and vinyl tiles floor bathroom 2nd. sty. apt. # 1.
Oct 16, 2004
Open — Nov sent out
Show 19 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor north room 2nd. sty. apt. # 1.
Oct 16, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass upper sash west window southeast room 2nd. sty. apt. # 1.
Oct 16, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling front room 2nd story apt.
Oct 16, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings throughout 2 sty. apt. 1.
Oct 16, 2004
Open — Nov sent out - BHazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, apartment at east
Oct 14, 2004 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings through out 3rd story apt.
Oct 3, 2003
Open — Nov sent out - BHazardous
Properly secure the loose all stair treads 1st to 2nd story public stairway
Oct 3, 2003
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling north room 2nd story apt.
Oct 3, 2003
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor kitchen, 2nd story apt.
Oct 3, 2003
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles bathroom 2nd story apt.
Oct 3, 2003
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cement floor bathroom, 2nd story apt.
Oct 3, 2003
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in kitchen of 2nd story apt.
Oct 3, 2003
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at bathroom of 2nd story apt.
Oct 3, 2003
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling bathroom of 2nd story apt.
Oct 3, 2003
Open — Nov sent out - CImmediately hazardous
Abate the nuisnace consisting of rodents rat feces
Oct 3, 2003
Open — Nov sent out - BHazardous
Properly secure the loose treads 4th,6th,9th, up to 2nd story public hall.
Oct 3, 2003
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste pipe under sink in the kitchen located at apt 2, 3rd story
Nov 19, 2001 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective oven cooking range in the kitchen located at apt 2, 3rd story
Nov 19, 2001 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures wash basin in the bathroom located at apt 2, 3rd story
Nov 19, 2001 · Apt 2
Open — Nov sent out
DOB building violations · 26
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 16 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
ECB violations · 1
- Class - 2
B265 as per class 2 (b265) 28.303.7 failure to file a complete boilerinspection report as per dob records. submit a current b09 report
Mar 28, 2017 · Penalty $500
Active
Complaints
- Heating
Heat related
Dec 27, 2005 · Apt 3
Close - Heating
Heat related
Jan 14, 2005 · Apt 3A
Close - Heating
Heat related
Jan 12, 2005 · Apt 3A
Close - Heating
Heat related
Jan 11, 2005 · Apt 3FL
Close - Heating
Heat related
Jan 10, 2005 · Apt 3A
Close - Heating
Heat related
Jan 8, 2005 · Apt 3
Close - Heating
Heat related
Jan 3, 2005 · Apt 3
Close - Heating
Heat related
Dec 20, 2004 · Apt 3
Close - Heating
Heat related
Dec 20, 2004 · Apt 2
Close - Heating
Heat related
Dec 17, 2004 · Apt 2
Close
Show 5 more ↓
- Plumbing
Sewer
Dec 9, 2004 · Apt 3A
Close - Nonconst
Odor
Dec 9, 2004 · Apt 3A
Close - Heating
Heat related
Nov 9, 2004 · Apt 3A
Close - Heating
Heat related
Oct 22, 2004 · Apt 3A
Close - Heating
Heat related
Oct 12, 2004 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1910
- Floors
- 3
- Residential units
- 2
- Building area
- 4,000 ft²
- Lot area
- 1,742 ft²
- Zoning
- M1-1
- Community board
- 305
- Council district
- 37
- Block / lot
- 3665 / 24
- Assessed value
- $85,860
- Landmark / historic district
- No
Questions about 2531 Atlantic Avenue
Who owns 2531 Atlantic Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2531 Atlantic Realty LLC.
Does 2531 Atlantic Avenue have violations?
Yes. NYC HPD has recorded 29 housing violations at this property.
Is 2531 Atlantic Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2531 Atlantic Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 2531 Atlantic Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.