roofy

713 Bristol Street

Brooklyn, NY 11236BBL 3-03642-0012Map

Owner of record: 642 E96 St LLC

713 Bristol Street is a walk-up apartment building built in 1930 in Brooklyn, 11236. It has 4 residential units across 2 floors. The owner of record is 642 E96 St LLC. HPD has recorded 267 housing violations here, most recently on September 7, 2026. 45 of the 50 most recent violations are still open.

HPD violations
267
DOB violations
1
ECB violations
6
HPD complaints
115

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 267

  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Sep 7, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Sep 7, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective grout at east, west and south wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Sep 7, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east

    Sep 7, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east

    Sep 7, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at 1st story

    Sep 7, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 7, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage missing at public hall, 1st story

    Sep 7, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 7, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings signage missing

    Sep 7, 2026

    Open — Nov sent out
Show 40 more ↓
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 7, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox signage missing at public hall, 1st story

    Sep 7, 2026

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq.ft but less than 30 sq.ft observed at ceiling and east wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Sep 7, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • C

    Trace and repair the source and abate the visible mold condition... more than 30 sq.ft observed at south wall and west wall in the 4th room from east located at apt 1r, 1st story, 1st apartment from north at east

    Sep 7, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the bathroom , the foyer located at apt apt1r, 1st story, 1st apartment from north at east

    Aug 4, 2026 · Apt APT1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story

    Aug 4, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story

    Aug 4, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at east wall and ceiling in the bathroom located at apt apt1r, 1st story, 1st apartment from north at east

    Aug 4, 2026 · Apt APT1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at south wall in the 4th room from east located at apt apt1r, 1st story, 1st apartment from north at east

    Aug 4, 2026 · Apt APT1R

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt apt1r, 1st story, 1st apartment from north at east

    Aug 4, 2026 · Apt APT1R

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at east wall in the bathroom located at apt apt1r, 1st story, 1st apartment from north at east

    Aug 4, 2026 · Apt APT1R

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 square feet at south wall in the 4th room from east located at apt apt1r, 1st story, 1st apartment from north at east

    Aug 4, 2026 · Apt APT1R

    Open — Notice of issuance sent to tenant
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 29, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 29, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox that is missing at public hall, 1st story

    Jul 29, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings that is missing

    Jul 29, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Jul 29, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system that is missing at public hall, 1st story

    Jul 29, 2026

    Open — Nov sent out
  • A

    Replace with new the missing closet door in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south

    Jul 29, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance for upper and lower sash window in the 3rd room from east located at apt 1f, 1st story, 1st apartment from east at south

    Jul 29, 2026 · Apt 1F

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jul 29, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance for upper and lower sash windows in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south

    Jul 29, 2026 · Apt 1F

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south

    Jul 29, 2026 · Apt 1F

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south

    Jul 29, 2026 · Apt 1F

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl . in the bathroom located at apt 1f, 1st story, 1st apartment from east at south

    Jul 29, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance for upper and lower sash windows in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south

    Jul 29, 2026 · Apt 1F

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective frame in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south

    Jul 29, 2026 · Apt 1F

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south

    Jul 29, 2026 · Apt 1F

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Jun 10, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Jun 10, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings that is missing

    Jun 10, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 10, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor that is missing at public hall, 1st story

    Jun 10, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox that is missing at public hall, 1st story

    Jun 10, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 29, 2025 · Apt 2R

    Closed — Violation dismissed
  • B

    Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at public hall, 2nd story

    Dec 29, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective door at building entrance , 1st story

    Dec 29, 2025

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 29, 2025 · Apt 2R

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 29, 2025 · Apt 2R

    Open — Nov sent out

DOB building violations · 1

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 3, 2014

    Dob violation - dismissed

ECB violations · 6

  • Class - 2

    Failure to comply w/commissioner's order to file a certificate of correction w/ the dob for nov #35059409j issued on 12/17/14 pursuant to 2 8-204.4 & 1rcny 102-01. rmdy: file a certificate of correction.

    Jan 30, 2015 · Penalty $800

    Active
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35097182l issued on 7/18/14 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Dec 17, 2014 · Penalty $2,000

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35097182l issued on 7/18/14. no permits have been pulled for the correction of vio #35097182l issued on 7/18/14. remedy: comply

    Dec 17, 2014 · Penalty $6,000

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by cofo and dob recrods class a aptcreated at cellar partitions erected creating use of rooms for living gas range and kitchen sink.also water closet washbasin and stall showe

    Nov 19, 2014 · Penalty $6,000

    Active
  • Class - 1

    Work w/o a permit. note: at cellar level full height partition walls erected,plumbing,electrical,gas lines installed convering 2pc bathrooms to 3pc bathroom, gas stove and kitchen sink w/cabinets.partition wal

    Jul 18, 2014 · Penalty $1,600

    Active
  • Class - 2

    Residence altered for occupancy as a dwelling for more than the legally approved number of families.note: hpd bldg registrration #213592 indicates that dwelling is a 4 "a unitsa" structure.job permit #302242641

    Jul 18, 2013

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Sep 16, 2026 · Apt 1R

    Open
  • Appliance

    Refrigerator

    Sep 16, 2026 · Apt 1R

    Open
  • Electric

    Power outage

    Sep 5, 2026 · Apt WHOLEB

    Close
  • Unsanitary condition

    Mold

    Aug 3, 2026 · Apt APT1R

    Close
  • Paint/plaster

    Ceiling

    Aug 3, 2026 · Apt APT1R

    Close
  • Plumbing

    Toilet

    Jun 28, 2026 · Apt 1F

    Close
  • Door/window

    Window frame

    Jun 28, 2026 · Apt 1F

    Close
  • Door/window

    Door

    Jun 28, 2026 · Apt 1F

    Close
  • Door/window

    Window pane

    Jun 28, 2026 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2026 · Apt 1F

    Close
Show 40 more ↓
  • Door/window

    Window frame

    Jan 24, 2026 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2025 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Dec 20, 2025 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Dec 20, 2025 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Nov 30, 2025 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 30, 2025 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 29, 2025 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Nov 29, 2025 · Apt 2R

    Close
  • Water leak

    Heavy flow

    Nov 25, 2025 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Oct 29, 2025 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Oct 24, 2025 · Apt 1R

    Close
  • Door/window

    Window frame

    Oct 24, 2025 · Apt 1R

    Close
  • Electric

    Power outage

    Jul 30, 2025 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Jul 30, 2025 · Apt 1R

    Close
  • Door/window

    Window frame

    Jul 30, 2025 · Apt 1R

    Close
  • Electric

    Power outage

    Jul 30, 2025 · Apt 1R

    Close
  • Electric

    Wiring

    Apr 8, 2024 · Apt 2F

    Close
  • Water leak

    Slow leak

    Apr 8, 2024 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Apr 8, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Apr 8, 2024 · Apt 2F

    Close
  • Appliance

    Electric/gas range

    Apr 8, 2024 · Apt 2F

    Close
  • Plumbing

    Water supply

    Apr 8, 2024 · Apt 2F

    Close
  • Plumbing

    Radiator

    Apr 8, 2024 · Apt 2F

    Close
  • Electric

    Wiring

    Apr 8, 2024 · Apt 2R

    Close
  • Water leak

    Slow leak

    Apr 8, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Apr 8, 2024 · Apt 2R

    Close
  • Appliance

    Electric/gas range

    Apr 8, 2024 · Apt 2R

    Close
  • Plumbing

    Water supply

    Apr 8, 2024 · Apt 2R

    Close
  • Plumbing

    Radiator

    Apr 8, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Apr 8, 2024 · Apt 1F

    Close
  • Plumbing

    Water supply

    Apr 8, 2024 · Apt 1F

    Close
  • Appliance

    Electric/gas range

    Apr 8, 2024 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2024 · Apt 2R

    Close
  • Appliance

    Electric/gas range

    Jan 27, 2024 · Apt 1F

    Close
  • General

    Cooking gas

    Jan 27, 2024 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2024 · Apt 1F

    Close
  • General

    Cooking gas

    Jan 26, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2024 · Apt 1

    Close
  • General

    Cooking gas

    Jan 23, 2024 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2024 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1930
Floors
2
Residential units
4
Building area
3,520 ft²
Lot area
2,650 ft²
Zoning
R5
Community board
316
Council district
42
Block / lot
3642 / 12
Assessed value
$211,050
Landmark / historic district
No

HPD registration #308259, last renewed Dec 1, 2025.

Questions about 713 Bristol Street

Who owns 713 Bristol Street?

The owner of record in NYC Department of City Planning PLUTO data is 642 E96 St LLC.

Does 713 Bristol Street have violations?

Yes. NYC HPD has recorded 267 housing violations at this property.

Is 713 Bristol Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 713 Bristol Street built?

City records list 1930 as the year it was built.

How many apartments are in 713 Bristol Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.