688 Bristol Street
Brooklyn, NY 11236BBL 3-03641-0035Map
Owner of record: Partridge, Carlton L
688 Bristol Street is a walk-up apartment building built in 1930 in Brooklyn, 11236. It has 4 residential units across 2 floors. The owner of record is Partridge, Carlton L. HPD has recorded 63 housing violations here, most recently on May 1, 2026. 43 of the 50 most recent violations are still open.
- HPD violations
- 63
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 55
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 63
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 21, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective concrete slab at front of building
Aug 8, 2017
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 1st,2nd, & 5th concrete treads-front of building
Aug 8, 2017
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system - door to cellar lock at public hall, 1st story
Feb 6, 2014
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures - in kitchen in the kitchen located at apt 2f, 2nd story, apartment at east
Feb 6, 2014 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2f, 2nd story, apartment at east
Feb 6, 2014 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system (cellar door locked at first story)
May 21, 2013
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the public halls at first and second stories
May 21, 2013
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceilings and walls at first and second stories public halls
May 21, 2013
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile wall at west in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures ,, in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... 125 square feet walls and ceilings in the entire apartment located at apt 2f, 2nd story, 2nd apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at the ceiling in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures ,, in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
May 21, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ,, at public hall, 1st story
May 21, 2013
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 1st room from east at north located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from east at center located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east at center located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective connection locknut at wasteline of sink in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling apprx 10 square feet in the 1st room from east at center located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling apprx 20 square feet in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Mar 13, 2013 · Apt 2F
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector inoperative in the entire apartment located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical light fixture at south wall in the 2nd room from east located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical wall outlets in the entire apartment located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electrical wires at west wall in the kitchen located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electrical wires at west wall in the 2nd room from east located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling & walls in the entire apartment located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in bathtub in the bathroom located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Replace the broken or defective washbasin in the bathroom located at apt 1f, 1st story, apartment at north
Nov 27, 2009 · Apt 1F
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- General
Bell/buzzer/intercom
Aug 4, 2017 · Apt BLDG
Close - Door/window
Window frame
Aug 4, 2017 · Apt BLDG
Close - Flooring/stairs
Stairs
Aug 4, 2017 · Apt BLDG
Close - Electric
Lighting
Aug 4, 2017 · Apt BLDG
Close - Outside building
Pavement
Aug 4, 2017 · Apt BLDG
Close - Heating
Heat related
Feb 5, 2014 · Apt 2
Close - Heating
Heat related
Feb 5, 2014 · Apt 2F
Close - Heating
Heat related
Nov 12, 2013 · Apt 2F
Close - Nonconst
Vermin
May 20, 2013 · Apt 2FRON
Close - Nonconst
Vermin
May 20, 2013 · Apt 2FRON
Close
Show 40 more ↓
- Nonconst
Rubbish
May 20, 2013 · Apt 2FRON
Close - General
Mold
May 20, 2013 · Apt 2FRON
Close - General
Mold
May 20, 2013 · Apt 2FRON
Close - General
Mold
May 20, 2013 · Apt 2FRON
Close - Paint/plaster
Ceiling
May 20, 2013 · Apt 2FRON
Close - Paint/plaster
Ceiling
May 20, 2013 · Apt 2FRON
Close - Paint/plaster
Ceiling
May 20, 2013 · Apt 2FRON
Close - Paint/plaster
Ceiling
May 20, 2013 · Apt 2FRON
Close - Plumbing
Water-leaks
May 20, 2013 · Apt 2FRON
Close - Plumbing
Water-leaks
May 20, 2013 · Apt 2FRON
Close - Plumbing
Water-leaks
May 20, 2013 · Apt 2FRON
Close - Heating
Heat related
Mar 20, 2013 · Apt 2F
Close - Plumbing
Basin/sink
Mar 9, 2013 · Apt 2F
Close - General
Floor
Mar 9, 2013 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 9, 2013 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 9, 2013 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 9, 2013 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 9, 2013 · Apt 2F
Close - Paint/plaster
Wall
Mar 9, 2013 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 9, 2013 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 9, 2013 · Apt 2F
Close - General
Mold
Mar 9, 2013 · Apt 2F
Close - General
Mold
Mar 9, 2013 · Apt 2F
Close - Plumbing
Water-leaks
Mar 9, 2013 · Apt 2F
Close - Plumbing
Water-leaks
Mar 9, 2013 · Apt 2F
Close - Plumbing
Water-leaks
Mar 9, 2013 · Apt 2F
Close - Plumbing
Water-leaks
Mar 9, 2013 · Apt 2F
Close - Heating
Heat related
Mar 9, 2013 · Apt 2F
Close - Paint/plaster
Wall
Jan 30, 2010 · Apt 1ST
Close - Paint/plaster
Wall
Jan 30, 2010 · Apt 1ST
Close - Plumbing
Toilet
Jan 30, 2010 · Apt 1ST
Close - Appliance
Refrigerator
Jan 30, 2010 · Apt 1ST
Close - Electric
Bell-buzzer/intercom
Jan 30, 2010 · Apt 1ST
Close - Electric
Wiring
Jan 30, 2010 · Apt 1ST
Close - Heating
Heat related
Jan 30, 2010 · Apt 1ST
Close - Plumbing
Basin/sink
Nov 20, 2009 · Apt 1F
Close - Plumbing
Bathtub/shower
Nov 20, 2009 · Apt 1F
Close - Paint/plaster
Wall
Nov 20, 2009 · Apt 1F
Close - Paint/plaster
Wall
Nov 20, 2009 · Apt 1F
Close - Paint/plaster
Wall
Nov 20, 2009 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1930
- Floors
- 2
- Residential units
- 4
- Building area
- 3,520 ft²
- Lot area
- 2,800 ft²
- Zoning
- R5
- Community board
- 316
- Council district
- 42
- Block / lot
- 3641 / 35
- Assessed value
- $211,050
- Landmark / historic district
- No
HPD registration #322259, last renewed Jul 8, 2026.
Questions about 688 Bristol Street
Who owns 688 Bristol Street?
The owner of record in NYC Department of City Planning PLUTO data is Partridge, Carlton L.
Does 688 Bristol Street have violations?
Yes. NYC HPD has recorded 63 housing violations at this property.
Is 688 Bristol Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 688 Bristol Street built?
City records list 1930 as the year it was built.
How many apartments are in 688 Bristol Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.