roofy

658 Watkins Street

Brooklyn, NY 11212BBL 3-03638-0046Map

Owner of record: B&E Building Management LLC

658 Watkins Street is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 3 residential units across 2 floors. The owner of record is B&E Building Management LLC. HPD has recorded 210 housing violations here, most recently on August 30, 2026. 50 of the 50 most recent violations are still open.

HPD violations
210
DOB violations
1
ECB violations
4
HPD complaints
95

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 210

  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 4th room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the foyer located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the 4th room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at south wall, west wall, north wall, east wall, 1st door frame from north at east wall, 1st door from north at east wall, ceiling, 1st closet from west at north wall door frame in the 4th room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective cracked glass at, lower window sash , 1st from south at west , 1st story , building front yard

    Aug 30, 2026

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less then 10 sqft observed at 1st window frame from east at south wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... les than 10 sqft observed at east wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sqft observed at west wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east at north located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Replace with new the missing cover at finn radiator , south wall, in the 4th room from east at north located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at north located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Replace with new the missing wood door at closet at east wall in the 4th room from east at north located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the celing in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood doors at wall cabinets at east wall in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of key operated lock installed at door to room with window use for egress in the 4th room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Properly secure the loose losse ceiling light fixture with exposed wires in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood door saddle in the entrance at west wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall, in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective cracked electrical light switch cover at west wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at east wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Properly secure the loose ceiling light fixture with exposed electrical wires in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Replace with new the missing finn radiator cover at south wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Replace with new the missing wood door , in the entrance, at west wall, in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall, in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective cracked electrical light switch cover at west wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective cracked glass at lower sash window to south wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective reglaze the bathtub at east wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at west wall in the 4th room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall, east wall in the 4th room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall, 1st door from north at east wall in the 4th room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 4th room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east at south located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door at north wall in the foyer located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective cracked marble saddle at door in the entrance , north wall , in the foyer located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective unhinged wood ooor , in the entrance, at west wall, in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl at north wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly secure the loose electrical outlet at east wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at east wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Aug 30, 2026 · Apt 1R

    Open — Nov sent out

DOB building violations · 1

  • Plumbing none

    The dob intends to revoke all approvals and permits under application #340487574 due to suspension of license. stop all plumbing work immedi ately except to make site safe

    Jun 26, 2017

    Dob violation - dismissed

ECB violations · 4

  • Class - 2

    Work without a permit. alteration work noted. at the time of inspection of the cellar level, erected full height partitions to create 1 room, 1 bathroom, and 1 storage room. the work is completed 100%. no filin

    Oct 6, 2025 · Penalty $1,280

    Active
  • Class - 2

    Work without a permit. electrical work noted. at the time of inspection of the cellar level. i observed electrical lines for switches, receptacles, and light fixtures for the 2-piece bathroom and 1 room at the

    Oct 6, 2025 · Penalty $1,280

    Active
  • Class - 2

    Failure to maintain building in a code-compliant manner. mdl 190 cellar stairs (1). at the time of inspection, i observed the cellar level missing a fireproof door with self-closing door. the condition poses a

    Oct 6, 2025 · Penalty $1,280

    Active
  • Class - 2

    Work without a permit. plumbing work noted. at the time of inspection of the cellar level, i observed plumbing work for a 2 pcs bathroom. the work is completed 100%. no filings in dob records for the work descr

    Oct 6, 2025 · Penalty $1,280

    Active

Complaints

  • Unsanitary condition

    Pests

    Sep 14, 2026 · Apt 1F

    Open
  • Flooring/stairs

    Floor

    Aug 26, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Aug 26, 2026 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Aug 26, 2026 · Apt 1R

    Close
  • Electric

    Wiring

    Aug 26, 2026 · Apt 1R

    Close
  • Water leak

    Slow leak

    Aug 26, 2026 · Apt 1R

    Close
  • Appliance

    Refrigerator

    Aug 26, 2026 · Apt 1R

    Close
  • Safety

    Smoke detector

    Aug 26, 2026 · Apt 1R

    Close
  • General

    Cabinet

    Aug 26, 2026 · Apt 1R

    Close
  • General

    Cooking gas

    Aug 24, 2026 · Apt 1R

    Close
Show 40 more ↓
  • Appliance

    Electric/gas range

    Aug 24, 2026 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Aug 24, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Mar 5, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Mar 5, 2026 · Apt 1F

    Close
  • Appliance

    Electric/gas range

    Mar 5, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Mold

    Mar 5, 2026 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Mar 5, 2026 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Nov 3, 2025 · Apt 1R

    Close
  • General

    Cabinet

    Nov 3, 2025 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Nov 3, 2025 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Jul 19, 2025 · Apt 1R

    Close
  • Electric

    Lighting

    Jul 19, 2025 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    Jul 19, 2025 · Apt 1R

    Close
  • General

    Cabinet

    Jul 19, 2025 · Apt 1R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 4, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Nov 4, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 4, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2024 · Apt BLDG

    Close
  • Safety

    Fire escape

    Nov 4, 2024 · Apt BLDG

    Close
  • Safety

    Fire escape

    Nov 4, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 4, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Nov 4, 2024 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Aug 30, 2024 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Aug 30, 2024 · Apt 1F

    Close
  • Unsanitary condition

    Mold

    Aug 30, 2024 · Apt 1F

    Close
  • Plumbing

    Water supply

    Aug 30, 2024 · Apt 1F

    Close
  • Water leak

    Slow leak

    Jul 6, 2024 · Apt 1F

    Close
  • Flooring/stairs

    Stairs

    Jul 5, 2024 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Jun 27, 2024 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Jun 27, 2024 · Apt 1F

    Close
  • Water leak

    Slow leak

    Jun 27, 2024 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Jun 27, 2024 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Jun 27, 2024 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Jun 27, 2024 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Jun 27, 2024 · Apt 1F

    Close
  • Unsanitary condition

    Mold

    Jun 27, 2024 · Apt 1F

    Close
  • Unsanitary condition

    Mold

    Jun 27, 2024 · Apt 1F

    Close
  • Plumbing

    Toilet

    Jun 27, 2024 · Apt 1F

    Close
  • Unsanitary condition

    Mold

    Jan 17, 2024 · Apt 1F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1930
Floors
2
Residential units
3
Building area
3,280 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
316
Council district
42
Block / lot
3638 / 46
Assessed value
$74,460
Landmark / historic district
No

HPD registration #336018, last renewed Oct 13, 2023.

Questions about 658 Watkins Street

Who owns 658 Watkins Street?

The owner of record in NYC Department of City Planning PLUTO data is B&E Building Management LLC.

Does 658 Watkins Street have violations?

Yes. NYC HPD has recorded 210 housing violations at this property.

Is 658 Watkins Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 658 Watkins Street built?

City records list 1930 as the year it was built.

How many apartments are in 658 Watkins Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.