591 Osborn Street
Brooklyn, NY 11212BBL 3-03628-0018Map
Owner of record: Osborn Plaza LLC
591 Osborn Street is a two-family home built in 1930 in Brooklyn, 11212. It has 2 residential units across 2 floors. The owner of record is Osborn Plaza LLC. HPD has recorded 102 housing violations here, most recently on March 16, 2026. 10 of the 50 most recent violations are still open.
- HPD violations
- 102
- DOB violations
- 2
- ECB violations
- 17
- HPD complaints
- 55
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 102
- BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Mar 16, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective second window from north at east in the 3rd room from north located at apt 2, 2nd story, 1st apartment from east at south
Mar 16, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at baseboard heater at east wall in the 3rd room from north located at apt 2, 2nd story, 1st apartment from east at south
Mar 16, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 2, 2nd story, 1st apartment from east at south
Mar 16, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective first and second windows from west at north in the 1st room from north located at apt 2, 2nd story, 1st apartment from east at south
Mar 16, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at baseboard heater at north wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from east at south
Mar 16, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at baseboard heater at east wall in the 2nd room from north located at apt 2, 2nd story, 1st apartment from east at south
Mar 16, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Mar 16, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range and stove in the kitchen located at apt 2, 2nd story, 2nd apartment from north at east
Jan 30, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
Jan 30, 2026 · Apt 2
Closed — Violation closed
Show 40 more ↓
- BHazardous
§ 27-2032, 2034 adnim. code: discontinue use of illegal space and/or hot water heater and provide filed for & approved heater which obtains combustion air directly from outside the building or approved central system .. in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Jan 7, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 5th room from east located at apt 2, 2nd story, 1st apartment from north at east
Jan 7, 2026 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Refit the lower sash at the 1st window from north at east wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Jan 7, 2026 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Refit the lower sash at the 1st window from south at west wall in the 5th room from east located at apt 2, 2nd story, 1st apartment from north at east
Jan 7, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from north at east wall in the 5th room from east located at apt 2, 2nd story, 1st apartment from north at east
Jan 7, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding the maximum allowable temperature of 130 degrees (f) at all fixtures creating a hazard in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jan 7, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Jan 7, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apt in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 9, 2025 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance lower sash window at east wall in the 2nd room from east located at apt 2, 2nd story, 2nd apartment from north at east
Nov 28, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at east wall in the 1st room from east located at apt 2, 2nd story, 2nd apartment from north at east
Nov 28, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Nov 28, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from west at north wall, 1st door frame from north at east wall, baseboard at north wall, baseboard at south wall, baseboard at west wall, 1st door frame from south at west wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall, south wall, west wall in the 5th room from east located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling (light) in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall wall, 2nd closet from south at west wall wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from west at north wall, 1st door frame from north at east wall, baseboard at north wall, baseboard at south wall, baseboard at west wall, west wall, 1st door frame from south at west wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door, 3rd closet from east at south wall door frame, north wall, south wall, west wall, baseboard at east wall in the 5th room from east located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, 2nd closet from south at west wall door, 2nd closet from south at west wall door frame, 1st door frame from west at north wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall, 1st wall cabinet from east at south wall, 2nd wall cabinet from east at south wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st closet from east at south wall shelf, 1st closet from east at south wall wall, 2nd closet from east at south wall door frame, 2nd closet from east at south wall wall, 3rd closet from east at south wall door, 3rd closet from east at south wall shelf, 3rd closet from east at south wall wall, 1st window frame from south at west wall, 2nd window frame from south at west wall, 3rd window frame from south at west wall in the 5th room from east located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor (under stove area) in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Apr 8, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Properly secure the loose light fixture at celing in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Sep 18, 2024 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Sep 18, 2024 · Apt 2
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electric outlet at south wall in the 4th room from north located at apt 2, 2nd story, 1st apartment from north at east
Sep 18, 2024 · Apt 2
Closed — Violation closed - BHazardous
Discontinue use of illegal space and/or hot water heater and provide filed for & approved heater which obtains combustion air directly from outside the building or approved central system boiler system in apt in the 3rd room from east located at apt 2ndflo, 2nd story, 1st apartment from north at east
Aug 23, 2024 · Apt 2NDFLO
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Aug 23, 2024 · Apt 2NDFLO
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective rotted floor panel at interior of base cabinet at sink in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Aug 31, 2022 · Apt 2
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in wasteline at washbasin in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 31, 2022 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 1st room from north at east located at apt 1stflo, 1st story, 1st apartment from west at north
Jul 30, 2022 · Apt 1STFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from west at north wall in the bathroom located at apt 1stflo, 1st story, 1st apartment from west at north
Jul 30, 2022 · Apt 1STFLO
Closed — Violation closed
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - dismissed
ECB violations · 17
- Class - 2
Work without permit. gas fired heater on 2nd floor with all typical gas piping installed. no permits on file. work is 100% complete, obtain all permits
Jan 12, 2026 · Penalty $1,250
Active - Class - 2
Ftm heating appliance installed in bedroom on 2nd floor apt. as per fgc 303.3 havc appliances shall not be located in sleeping rooms. cease use of goodman heating unit in bedroom. the prohibited location is cre
Jan 12, 2026 · Penalty $1,250
Active - Class - 2
Failure to maintain, pvc piping is being used for exhaust on gas buring equipment on second floor apartment, use of pvc piping for exhaust is prohibited on hvac system as per fgc 503.4.1, repair and/or replace
Jan 12, 2026 · Penalty $1,250
Active - Class - 1
Unlawfully continued work while on notice of a stop work order. noted; at cellar level work 100% completed wile on a active notice of partial stop work order., comply with stop work order
Dec 23, 2024 · Penalty $25,000
Active - Class - 2
Goodman hvac unit in 2nd fl apt=debris on and around hvac unit+remote switch incorrectly located+intake louver clogged+intake filter clogged+not starting automatic+thermostat defective, maintain boiler; qualifi
Aug 27, 2024 · Penalty $3,125
Active - Class - 1
At time of inspection observed at the corner exp#1 and 2 front porch brick column displaced and freely standing in danger to future collapse. brick fence at this porch bricks freely standing and in danger to co
May 16, 2024
Resolve - Class - 1
Failure to comply with commissioner's order contained in summons/violation #39038121n issued 03/23/21 and file certificate of correction pursuant to 28-201.1 & 1rcny 102-01.work w/o permit at cellar level.remed
Feb 9, 2022
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/viol tion #39038120l issued 03/23/21 and file certificate of correction pu suant to 28-201.1 & 1rcny 102-01.failure to maintain building in code
Feb 9, 2022
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#39038121n issued on 03/23/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit at cellar level doing structural
Nov 18, 2021
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39038120l issued on 03/23/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. for failure to maintain bldg in code compliant mann
Nov 18, 2021
Resolve
Show 7 more ↓
- Class - 1
Failure to comply w/the commissioner's order contained in summons/violation #39038121n issued on 03/23/21 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.work w/out a permit,at cellar
Sep 24, 2021
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #39038120z issued on 03/23/21 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.failure to maintain bldg in co
Sep 24, 2021
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v39038121n issued3/23/21 &to file c/c pursuant to28-201.1&1rcny102-01.@cellar level work w/o permit comply w/commissioner's order &/or file c/c.
Aug 2, 2021
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v39038120l issued3/23/21 &to file c/c pursuant to28-201.1&1rcny102-01.failure to maintain bldg in codecompliant manner@cellar level,(illegible) fire
Aug 2, 2021
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39038120l issued on 03/23/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner,
Jun 1, 2021
Resolve - Class - 1
Work without a permit. at time of inspection observed at cellar level structural shoring work performed consisting of 2x12 header supported by 4x4 post. no job filings or permits issued., obtain permit; make si
Mar 23, 2021
Resolve - Class - 1
Failure to maintain building. at time of inspection observed: 1.) cellar ceiling fire proofing removed. 2.) ceiling joist & sub fl. rotted. 3.) main structural wood girder in disrepair sections rotted & split.
Mar 23, 2021
Resolve
Complaints
- Appliance
Electric/gas range
Mar 6, 2026 · Apt 2
Close - Door/window
Window frame
Mar 6, 2026 · Apt 2
Close - Door/window
Window frame
Mar 6, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 2
Close - Paint/plaster
Wall
Jan 29, 2026 · Apt 2
Close - Flooring/stairs
Floor
Jan 29, 2026 · Apt 2
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt 2
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt 2
Close - Door/window
Window frame
Jan 2, 2026 · Apt 2
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt 2
Close
Show 40 more ↓
- Electric
No lighting
Apr 3, 2025 · Apt 2
Close - Unsanitary condition
Mold
Apr 3, 2025 · Apt 2
Close - Unsanitary condition
Pests
Apr 3, 2025 · Apt 2
Close - Flooring/stairs
Floor
Apr 3, 2025 · Apt 2
Close - Flooring/stairs
Floor
Apr 3, 2025 · Apt 2
Close - Door/window
Window frame
Sep 9, 2024 · Apt 22NDFL
Close - Electric
Wiring
Sep 9, 2024 · Apt 22NDFL
Close - Electric
Outlet/switch
Sep 9, 2024 · Apt 22NDFL
Close - Door/window
Window frame
Aug 31, 2024 · Apt 2
Close - Door/window
Window frame
May 15, 2024 · Apt 2NDFLO
Close - Water leak
Slow leak
May 15, 2024 · Apt 2NDFLO
Close - Door/window
Window frame
May 15, 2024 · Apt 2NDFLO
Close - Electric
No lighting
Apr 3, 2024 · Apt 2
Close - Electric
No lighting
Mar 26, 2024 · Apt 2
Close - Heat/hot water
Entire building
Mar 26, 2024 · Apt E4
Close - Paint/plaster
Ceiling
Mar 26, 2024 · Apt E4
Close - Water leak
Damp spot
Mar 26, 2024 · Apt E4
Close - Heat/hot water
Entire building
Jan 16, 2023 · Apt 2
Close - Heat/hot water
Apartment only
Jan 16, 2023 · Apt 2
Close - Heat/hot water
Apartment only
Dec 25, 2022 · Apt 2FL
Close - Heat/hot water
Apartment only
Dec 25, 2022 · Apt 2FL
Close - Electric
Lighting
Oct 18, 2022 · Apt 2
Close - Plumbing
Basin/sink
Oct 18, 2022 · Apt 2
Close - Unsanitary condition
Pests
Oct 18, 2022 · Apt 2
Close - Flooring/stairs
Floor
Oct 18, 2022 · Apt 2
Close - Unsanitary condition
Mold
Oct 18, 2022 · Apt 2
Close - Plumbing
Radiator
Oct 18, 2022 · Apt 2
Close - Plumbing
Basin/sink
Oct 18, 2022 · Apt 2
Close - Flooring/stairs
Floor
Aug 23, 2022 · Apt 2
Close - Unsanitary condition
Mold
Aug 23, 2022 · Apt 2
Close - Plumbing
Basin/sink
Aug 23, 2022 · Apt 2
Close - Heat/hot water
Apartment only
Jul 27, 2022 · Apt 2
Close - General
Cooking gas
Jul 26, 2022 · Apt 2
Close - Unsanitary condition
Mold
Jul 26, 2022 · Apt 1STFLO
Close - Appliance
Electric/gas range
Jul 26, 2022 · Apt 1STFLO
Close - General
Cooking gas
Jul 14, 2022 · Apt 1
Close - Paint/plaster
Wall
Mar 30, 2022 · Apt 1STFLO
Close - Heat/hot water
Entire building
Mar 30, 2022 · Apt 1STFLO
Close - Paint/plaster
Ceiling
Mar 30, 2022 · Apt 1STFLO
Close - Flooring/stairs
Floor
Mar 30, 2022 · Apt 1STFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1930
- Floors
- 2
- Residential units
- 2
- Building area
- 2,080 ft²
- Lot area
- 2,350 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 42
- Block / lot
- 3628 / 18
- Assessed value
- $61,320
- Landmark / historic district
- No
HPD registration #821729, last renewed Aug 1, 2025.
Questions about 591 Osborn Street
Who owns 591 Osborn Street?
The owner of record in NYC Department of City Planning PLUTO data is Osborn Plaza LLC.
Does 591 Osborn Street have violations?
Yes. NYC HPD has recorded 102 housing violations at this property.
Is 591 Osborn Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 591 Osborn Street built?
City records list 1930 as the year it was built.
How many apartments are in 591 Osborn Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.