602 Bristol Street
Brooklyn, NY 11212BBL 3-03623-0060Map
Owner of record: Dmj 602 Consultants LLC
602 Bristol Street is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 4 residential units across 2 floors. The owner of record is Dmj 602 Consultants LLC. HPD has recorded 130 housing violations here, most recently on August 13, 2026. 44 of the 50 most recent violations are still open.
- HPD violations
- 130
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 49
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 130
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Aug 13, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 13, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 13, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Aug 13, 2026 · Apt 2B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at window lower sash in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Aug 13, 2026 · Apt 2B
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jun 22, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 22, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jun 22, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 4th room from east at north located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Open — Nov sent out
Show 40 more ↓
- BHazardous
Provide adequate supply of hot water for the fixtures at all faucets in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, west and east walls in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall and ceiling in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the west wall in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Properly secure the loose front face of base cabinet at west wall in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration the acoustic drop ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west walls in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft and south and west walls in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Properly secure the loose mechanical ventilation hood at south wall in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling and south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at north located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Provide adequate supply of cold water for the fixtures at all faucets in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective drain plug at wash basin in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Jun 22, 2026 · Apt 1F
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling and south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west original violation 19023971 issued 22-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 22, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft and south and west walls in the bathroom located at apt 1f, 1st story, 1st apartment from east at south original violation 19023962 issued 22-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 22, 2026 · Apt 1F
Open — Notice of issuance sent to tenant - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye at vestibule door at public hall, 1st story
Jun 22, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at lower window sash at south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Jun 22, 2026 · Apt 2R
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 20, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jun 20, 2026 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jun 20, 2026 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye at vestibule door at public hall, 1st story
Jun 20, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jun 20, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing sign
Jun 20, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 20, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 20, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jun 20, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jun 20, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jun 20, 2026 · Apt 1
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Apr 23, 2026 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall, 1st window frame from east at south wall in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south
Apr 23, 2026 · Apt 1F
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Water supply
Jun 17, 2026 · Apt 1
Close - Unsanitary condition
Mold
Jun 17, 2026 · Apt 1
Close - Unsanitary condition
Pests
Jun 17, 2026 · Apt 1
Close - Unsanitary condition
Pests
Jun 17, 2026 · Apt 1
Close - Plumbing
Water supply
Jun 17, 2026 · Apt BLDG
Close - Door/window
Window frame
Jun 17, 2026 · Apt 2R
Close - Water leak
Heavy flow
Apr 22, 2026 · Apt 1F
Close - Heat/hot water
Apartment only
Apr 22, 2026 · Apt 1F
Close - Plumbing
Basin/sink
Apr 22, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Apr 22, 2026 · Apt 1F
Close
Show 39 more ↓
- Unsanitary condition
Mold
Apr 22, 2026 · Apt 1F
Close - Appliance
Electric/gas range
Apr 22, 2026 · Apt 1F
Close - Door/window
Door
Apr 22, 2026 · Apt 1F
Close - Flooring/stairs
Floor
Apr 22, 2026 · Apt 1F
Close - Paint/plaster
Wall
Apr 22, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Apr 22, 2026 · Apt 1F
Close - Water leak
Slow leak
Mar 2, 2026 · Apt 2R
Close - Unsanitary condition
Mold
Mar 2, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 1F
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 2FRONT
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 1F
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 1F
Close - Water leak
Heavy flow
Nov 13, 2025 · Apt 1STFLO
Close - Water leak
Slow leak
Nov 13, 2025 · Apt 1STFLO
Close - Paint/plaster
Wall
Nov 13, 2025 · Apt 1STFLO
Close - Paint/plaster
Ceiling
Dec 5, 2023 · Apt 4R
Close - Unsanitary condition
Pests
Dec 5, 2023 · Apt 4R
Close - Paint/plaster
Wall
Dec 5, 2023 · Apt 4R
Close - Heat/hot water
Apartment only
Dec 5, 2023 · Apt 4R
Close - Unsanitary condition
Pests
Dec 5, 2023 · Apt 4R
Close - Appliance
Refrigerator
Dec 5, 2023 · Apt 4R
Close - Electric
Wiring
Dec 5, 2023 · Apt 2R
Close - Electric
No lighting
Dec 5, 2023 · Apt 2R
Close - Appliance
Electric/gas range
Aug 12, 2022 · Apt 2R
Close - Appliance
Refrigerator
Aug 12, 2022 · Apt 2R
Close - Electric
No lighting
Aug 12, 2022 · Apt 2R
Close - Electric
Wiring
Aug 12, 2022 · Apt 2R
Close - Electric
Power outage
Aug 12, 2022 · Apt 2R
Close - Water leak
Heavy flow
Feb 2, 2022 · Apt 2RR
Close - Paint/plaster
Ceiling
Feb 2, 2022 · Apt 2RR
Close - Paint/plaster
Ceiling
Feb 2, 2022 · Apt 2RR
Close - Electric
No lighting
Feb 2, 2022 · Apt 2RR
Close - Electric
No lighting
Oct 8, 2020 · Apt 2FLOOR
Close - Electric
Power outage
Jul 8, 2020 · Apt 2NDFLO
Close - Plumbing
Bathtub/shower
Jul 8, 2020 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Feb 20, 2019 · Apt 2REAR
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Oct 31, 2025 | Non-market transfer | Rentals - walkup apartments | 4 |
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1930
- Floors
- 2
- Residential units
- 4
- Building area
- 3,404 ft²
- Lot area
- 3,000 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 42
- Block / lot
- 3623 / 60
- Assessed value
- $212,400
- Landmark / historic district
- No
Questions about 602 Bristol Street
Who owns 602 Bristol Street?
The owner of record in NYC Department of City Planning PLUTO data is Dmj 602 Consultants LLC.
Does 602 Bristol Street have violations?
Yes. NYC HPD has recorded 130 housing violations at this property.
Is 602 Bristol Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 602 Bristol Street built?
City records list 1930 as the year it was built.
How many apartments are in 602 Bristol Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.