roofy

423 Herzl Street

Brooklyn, NY 11212BBL 3-03598-0015Map

Owner of record: 423 Herzl Mazel LLC

423 Herzl Street is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 4 residential units across 2 floors. The owner of record is 423 Herzl Mazel LLC. HPD has recorded 124 housing violations here, most recently on November 28, 2025. 1 of the 50 most recent violations are still open.

HPD violations
124
DOB violations
0
ECB violations
0
HPD complaints
70

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 28, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 124

  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east

    Nov 28, 2025 · Apt 1R

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at multible dead rat carcasses, excessive rat droppings at basement

    Nov 10, 2025

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective wood floor joist at ceiling , west at basement

    Nov 10, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges, at entrance door to cellar, at north wall at public hall, 1st story

    Nov 10, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges, at boiler room door at basement

    Nov 10, 2025

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of excessive household items surrounding scuttle ladder at public hall, 2nd story

    Nov 10, 2025

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Nov 10, 2025 · Apt 2F

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from north at east

    Nov 10, 2025 · Apt 1R

    Closed — Violation closed
  • C

    Replace with new the missing fire retardant material ceiling throughout at basement

    Nov 10, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective defective latch at vestibule door at public hall, 1st story

    Jul 30, 2025

    Closed — Violation closed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective defective hinges at building entrance door at public hall, 1st story

    Jul 30, 2025

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 1f, 1st story, 1st apartment from east at south

    Jul 28, 2025 · Apt 1F

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective locking device at building entrance door

    Jul 28, 2025

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south

    Jul 28, 2025 · Apt 1F

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south

    Jul 28, 2025 · Apt 1F

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1f, 1st story, 1st apartment from east at south

    Jul 28, 2025 · Apt 1F

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south

    Jul 28, 2025 · Apt 1F

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south

    Jul 28, 2025 · Apt 1F

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south

    Jul 28, 2025 · Apt 1F

    Closed — Violation closed
  • A

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at basement

    Jun 24, 2025

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story

    Jun 24, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retarding ceiling by stairs to basement at public hall, 1st story

    Jun 24, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 2f, 2nd story, apartment at west

    Jun 24, 2025 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective wash basin cabinet in the bathroom located at apt 2f, 2nd story, apartment at west

    Jun 24, 2025 · Apt 2F

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective , in the entrance located at apt 2f, 2nd story, apartment at west

    Jun 24, 2025 · Apt 2F

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 10, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story

    Mar 24, 2024

    Closed — Violation closed
  • B

    Refit at vestibule at public hall, 1st story

    Mar 24, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 23, 2023

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 21, 2022 · Apt 2R

    Closed — Violation dismissed
  • B

    Replace with new the missing metal cover for plumbing at east wall under washbasin at cabinet in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 21, 2022 · Apt 2R

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective caulking around electrical outlet cover at east wall in the 3rd room from east at south located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 21, 2022 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood baseboard at west wall in the 3rd room from east at south located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 21, 2022 · Apt 2R

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective caulking around electrical outlet cover at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 21, 2022 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 21, 2022 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 21, 2022 · Apt 2R

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 21, 2022 · Apt 2R

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective rubber gasket around door at refrigerator in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 21, 2022 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 21, 2022 · Apt 2R

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 25, 2022

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st door frame from south at west wall, 1st window frame from east at south wall in the 1st room from east located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 18, 2021 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st door frame from south at west wall, 1st window frame from east at south wall in the 1st room from east located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 18, 2021 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 4th room from east at north located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 18, 2021 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, east wall in the 4th room from east at south located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 18, 2021 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall, east wall in the 2nd room from east at south located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 18, 2021 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 18, 2021 · Apt 2F

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 18, 2021 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, 1st window frame from south at west wall in the 4th room from east at south located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 18, 2021 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall, 1st closet from west at north wall door in the 1st room from east located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 18, 2021 · Apt 2F

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 4th room from east at north located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 18, 2021 · Apt 2F

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Pests

    Jul 22, 2025 · Apt 1F

    Close
  • Water leak

    Damp spot

    Jul 9, 2025 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Jul 9, 2025 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Jul 9, 2025 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Jul 9, 2025 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Jul 9, 2025 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Oct 23, 2023 · Apt F1

    Close
  • Unsanitary condition

    Mold

    May 5, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    May 5, 2023 · Apt 2R

    Close
  • Paint/plaster

    Wall

    May 5, 2023 · Apt 2R

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    Jan 7, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Jan 7, 2023 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Jan 7, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jan 7, 2023 · Apt 2R

    Close
  • Door/window

    Window frame

    Jan 7, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 21, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Dec 21, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Dec 21, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Dec 21, 2022 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Dec 21, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Dec 21, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Dec 21, 2022 · Apt 2R

    Close
  • Plumbing

    Radiator

    Dec 20, 2022 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Dec 20, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Dec 20, 2022 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Dec 20, 2022 · Apt 2R

    Close
  • Appliance

    Electric/gas range

    Dec 20, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Dec 20, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Dec 20, 2022 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Dec 20, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 20, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 18, 2021 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Dec 18, 2021 · Apt 2F

    Close
  • Electric

    Power outage

    Dec 18, 2021 · Apt 2F

    Close
  • Appliance

    Electric/gas range

    Dec 18, 2021 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Dec 18, 2021 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Dec 18, 2021 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Oct 18, 2021 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Oct 18, 2021 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Jul 21, 2019 · Apt 2F

    Close
  • Plumbing

    Bathtub/shower

    Jul 15, 2019 · Apt 2F

    Close
  • Door/window

    Door

    Aug 30, 2018 · Apt 1R

    Close
  • Safety

    Smoke detector

    Aug 30, 2018 · Apt 2R

    Close
  • Safety

    Carbon monoxide detector

    Aug 30, 2018 · Apt 2R

    Close
  • Safety

    Fire escape

    Aug 30, 2018 · Apt 1R

    Close
  • Door/window

    Door

    Aug 30, 2018 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Dec 26, 2017 · Apt BLDG

    Close
  • Outside building

    Skylight

    Dec 26, 2017 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Dec 26, 2017 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 26, 2017 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1930
Floors
2
Residential units
4
Building area
3,000 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
316
Council district
41
Block / lot
3598 / 15
Assessed value
$187,200
Landmark / historic district
No

HPD registration #301602, last renewed Jul 9, 2026.

Questions about 423 Herzl Street

Who owns 423 Herzl Street?

The owner of record in NYC Department of City Planning PLUTO data is 423 Herzl Mazel LLC.

Does 423 Herzl Street have violations?

Yes. NYC HPD has recorded 124 housing violations at this property.

Is 423 Herzl Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 423 Herzl Street built?

City records list 1930 as the year it was built.

How many apartments are in 423 Herzl Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.