9 Newport Street
Brooklyn, NY 11212BBL 3-03595-0005Map
Owner of record: 9 Newport LLC
9 Newport Street is a mixed residential and retail building built in 1930 in Brooklyn, 11212. It has 4 residential units across 2 floors. The owner of record is 9 Newport LLC. HPD has recorded 47 housing violations here, most recently on October 1, 2014. 46 of the 47 most recent violations are still open.
- HPD violations
- 47
- DOB violations
- 36
- ECB violations
- 5
- HPD complaints
- 106
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 47
- BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts incandesent light required to all fixtures under side walk shed from newport st to east 98 st. in addition there are missing bolt caps around the vertical risers shed.
Oct 1, 2014
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of no lighting provided at sidewalk shed
Sep 26, 2014
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of missing bolt caps and/or duct tape on uprights
Jun 17, 2013
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak at the ceiling in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Mar 3, 2007 · Apt 2D
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 3rd living room from east located at apt 2d, 2nd story
Mar 3, 2007 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and east wall in the kitchen located at apt 2d, 2nd story
Mar 3, 2007 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and east wall in the private hallway located at apt 2d, 2nd story
Mar 3, 2007 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and west wall in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Mar 3, 2007 · Apt 2D
Open — First no access to re- inspect violation - CImmediately hazardous
M/d law abate the nuisance consisting of no electricity supply in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Mar 3, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 3rd room from east located at apt 2c, 2nd story, 2nd apartment from south at west
Mar 3, 2007 · Apt 2C
Open — First no access to re- inspect violation
Show 37 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and west wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from south at west
Mar 3, 2007 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and east wall in the private hallway located at apt 2c, 2nd story, 2nd apartment from south at west
Mar 3, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the roof so that it will not leak at the ceiling in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Mar 3, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
M/d law abate the nuisance consisting of no electric entire apt in the entire apartment located at apt 2c, 2nd story, 2nd apartment from west at north
Feb 24, 2007 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Provide ready access to buildings heating system ..... at public hall, 1st story
Feb 24, 2007
Open — First no access to re- inspect violation - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2c, 2nd story, 2nd apartment from west at north
Feb 24, 2007 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... and mildew at the north and east walls in the 1st room from east located at apt 2c, 1st story, apartment at north
Nov 24, 2006 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the roof so that it will not leak over and in the bathroom located at apt 2c, 2nd story, apartment at north
Nov 24, 2006 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the roof so that it will not leak over and in the private hallway located at apt 2c, 2nd story, apartment at north
Nov 24, 2006 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the roof so that it will not leak over and in the kitchen located at apt 2c, 2nd story, apartment at north
Nov 24, 2006 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Properly secure the loose electrical ceiling light fixture in the kitchen located at apt 2c, 2nd story, apartment at north
Nov 24, 2006 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 2c, 2nd story, apartment at north
Nov 24, 2006 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the walls and ceiling in the private hallway located at apt 2c, 2nd story, apartment at north
Nov 24, 2006 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the walls and ceiling in the kitchen located at apt 2c, 2nd story, apartment at north
Nov 24, 2006 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of eveidance of water leak at ceiling in the private hallway located at apt 2c, 2nd story, 1st apartment from east at south
May 1, 2006 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of eveidance of water leak at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
May 1, 2006 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
May 1, 2006 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective door lock in the entrance located at apt 2c, 2nd story, 1st apartment from east at south
May 1, 2006 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of eveidance of water leak at ceiling in the 2nd room from east located at apt 2c, 2nd story, 1st apartment from east at south
May 1, 2006 · Apt 2C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2d, 2nd story, apartment at south
Apr 19, 2005 · Apt 2D
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 2d, 2nd story, apartment at south
Apr 19, 2005 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from east located at apt 2d, 2nd story, apartment at south
Apr 19, 2005 · Apt 2D
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 4th room from east located at apt 2d, 2nd story, apartment at south
Apr 19, 2005 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective ceiling light fixture in the bathroom located at apt 2d, 2nd story, apartment at south
Apr 19, 2005 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective lock and assembly door at front in the entrance located at apt 2d, 2nd story, apartment at south
Apr 19, 2005 · Apt 2D
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling, west wall in the 2nd terrace from north at east located at apt 2b, 2nd story, 1st apartment from north at east
Feb 19, 2005 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling, west wall in the 1st room from north at east located at apt 2b, 2nd story, 1st apartment from north at east
Feb 19, 2005 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the 2nd room from north at west located at apt 2b, 2nd story, 1st apartment from north at east
Feb 19, 2005 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Feb 19, 2005 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) west wall in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Feb 19, 2005 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the nuisance consisting of mildew at ceiling in the bathroom located at apt 2b, 2nd story
Jan 9, 2004 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective counter balance east and west lower window sashes at north 2 room in the 2nd room from north located at apt 2b, 2nd story
Mar 4, 2000 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
M/d law abate the nuisance consisting of mold and mildew at east wall at north 1 room in the 1st bedroom from north located at apt 2b, 2nd story
Mar 4, 2000 · Apt 2B
Open — First no access to re- inspect violation - ANon-hazardous
Properly secure the loose south closet dorr at north west room in the 1st living room from north at west located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2000 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling, north wall at east, north wall at east, north wall at south in the 2nd bedroom 2 from north at east located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2000 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2000 · Apt 2B
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at north 1 room in the 1st bedroom from north located at apt 2b, 2nd story
Mar 4, 2000 · Apt 2B
Open — First no access to re- inspect violation
DOB building violations · 36
- Construction other optional
Requesting an engineer report due to amsonry & cmu wall damaged at exp osur e# 2 (east 98th strret) from vehicle impact . *remedy* owner to h ire nyspe to submit report to [email protected] withiin 5 days addressing all conditions with plans , photos , reocmmending time frame and repairs to be completed
Jul 21, 2026
Dob violation - active - Construction other optional
Structure rendered non compliant due to car impactng building at expos ure # 2 . 10 linear ft. of cmu block kneewall damaged 7 pushed inward damaged to interior studs and wall noted the structure must be maintained in a code complaint manner
Jul 21, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Structurally compromised building none
Failure to submit an acceptable inspectn rpt for structurally compromised bldg.
Sep 14, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed
Show 26 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Immediate emergency anythingoptional
Full vacate on property
Jan 30, 2015
Dob violation - dismissed - Construction other optional
Failure to maintian noted along east 98th street just ooff the n/e corner, side walk shed has been compromised in that 1 upright support post has been shifted and now offset leaning with potential to collaps e
Jan 23, 2015
Dob violation - dismissed - Emergency none
Egncy-emergency none
Jun 12, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Dec 27, 2012
Dob violation - dismissed - Emergency none
Egncy-emergency none
Dec 27, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 2
Work without a permit, noted at time of my inspection i observed business accessory warp around sign read mk convenience corp. with spot, was installed above the main entrance ,without a permit need to obtain a
Jan 31, 2024 · Penalty $1,250
Resolve - Class - 2
At the time of inspection 2 stories alt building i observed construction fence has expired permit on 09/11/2022 permit # b00156825. fence has some painted different colors , and commercial advertisement stick o
Sep 29, 2022 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner.noted:full vacate due to a fire issued on 12/18/12.on time of inspection observed that roof and second floor joists are damaged by fire and must be replaced.bld
May 14, 2019 · Penalty $655
Resolve - Class - 2
3307.6.5 failure to maintain adequate illumination beneath sidewalk shed as required by code sidewalk shed erected under job 320707277 along exp1 and 2 has artificial illumination provided at area under shed
Jan 10, 2016 · Penalty $2,000
Resolve - Class - 2
Work w/o a permit for expired permit. noted: sidewalk shed erected & permit has expired for job #320707277 exp 1/17/14. remedy: obtain permit/renew permit.
Jan 23, 2015 · Penalty $2,000
Resolve
Complaints
- General
Signage missing
Apr 23, 2026 · Apt BLDG
Close - Electric
Lighting
Oct 1, 2014 · Apt BLDG
Close - General
Windows
May 19, 2010 · Apt 2F
Close - Heating
Heat related
Apr 17, 2009 · Apt GRD
Close - Heating
Heat related
Apr 7, 2009 · Apt 1
Close - Heating
Heat related
Nov 25, 2008 · Apt 1
Close - Electric
Electric-supply
Mar 4, 2007 · Apt 2D
Close - Electric
Electric-supply
Mar 4, 2007 · Apt 2
Close - Paint/plaster
Ceiling
Mar 2, 2007 · Apt 2C
Close - Plumbing
Water-leaks
Mar 2, 2007 · Apt 2C
Close
Show 40 more ↓
- Electric
Electric-supply
Feb 19, 2007 · Apt 2C
Close - Heating
Heat related
Feb 19, 2007 · Apt 2C
Close - Heating
Heat related
Feb 19, 2007 · Apt 2C
Close - Heating
Heat related
Dec 15, 2006 · Apt 2C
Close - Plumbing
Water-leaks
Dec 15, 2006 · Apt 2C
Close - General
Mold
Dec 15, 2006 · Apt 2C
Close - Plumbing
Water-leaks
Dec 15, 2006 · Apt 2C
Close - Plumbing
Water-leaks
Nov 17, 2006 · Apt 2C
Close - General
Mold
Nov 17, 2006 · Apt 2C
Close - Heating
Heat related
Nov 17, 2006 · Apt 2C
Close - Plumbing
Water-leaks
Nov 8, 2006 · Apt 2C
Close - Plumbing
Water-leaks
Nov 8, 2006 · Apt 2C
Close - Heating
Heat related
Nov 8, 2006 · Apt 2C
Close - Plumbing
Toilet
Apr 29, 2006 · Apt 2C
Close - Heating
Heat related
Apr 29, 2006 · Apt 2C
Close - Plumbing
Bathtub/shower
Apr 26, 2006 · Apt 2C
Close - Paint/plaster
Ceiling
Apr 26, 2006 · Apt 2C
Close - Paint/plaster
Wall
Apr 26, 2006 · Apt 2C
Close - Paint/plaster
Ceiling
Apr 26, 2006 · Apt 2C
Close - Paint/plaster
Wall
Apr 26, 2006 · Apt 2C
Close - Plumbing
Water-leaks
Apr 26, 2006 · Apt 2C
Close - Paint/plaster
Ceiling
Apr 26, 2006 · Apt 2C
Close - Paint/plaster
Wall
Apr 26, 2006 · Apt 2C
Close - Heating
Heat related
Apr 26, 2006 · Apt 2C
Close - Heating
Heat related
Apr 24, 2006 · Apt 2D
Close - Appliance
Refrigerator
Apr 24, 2006 · Apt 2D
Close - Electric
Lighting
Apr 24, 2006 · Apt 2D
Close - Plumbing
Water-leaks
Apr 24, 2006 · Apt 2D
Close - Electric
Lighting
Apr 24, 2006 · Apt 2D
Close - Plumbing
Water-leaks
Apr 24, 2006 · Apt 2D
Close - Electric
Lighting
Apr 20, 2006 · Apt 2D
Close - Appliance
Refrigerator
Apr 20, 2006 · Apt 2D
Close - Heating
Heat related
Apr 20, 2006 · Apt 2D
Close - General
Windows
Apr 13, 2006 · Apt 2B
Close - Plumbing
Water-leaks
Apr 13, 2006 · Apt 2B
Close - Appliance
Refrigerator
Apr 13, 2006 · Apt 2B
Close - Plumbing
Water-leaks
Apr 11, 2006 · Apt 2C
Close - Plumbing
Water-leaks
Apr 11, 2006 · Apt 2C
Close - Plumbing
Water-leaks
Apr 11, 2006 · Apt 2C
Close - Electric
Lighting
Apr 11, 2006 · Apt 2C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1930
- Floors
- 2
- Residential units
- 4
- Building area
- 8,314 ft²
- Lot area
- 4,110 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 3595 / 5
- Assessed value
- $417,600
- Landmark / historic district
- No
Questions about 9 Newport Street
Who owns 9 Newport Street?
The owner of record in NYC Department of City Planning PLUTO data is 9 Newport LLC.
Does 9 Newport Street have violations?
Yes. NYC HPD has recorded 47 housing violations at this property.
Is 9 Newport Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 9 Newport Street built?
City records list 1930 as the year it was built.
How many apartments are in 9 Newport Street?
It has 4 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.