184 Tapscott Street
Brooklyn, NY 11212BBL 3-03549-0036Map
Owner of record: NYC Pact Preservation Partners LLC
184 Tapscott Street is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 27 residential units across 4 floors. The owner of record is NYC Pact Preservation Partners LLC. HPD has recorded 22 housing violations here, most recently on December 12, 2024. 18 of the 22 most recent violations are still open.
- HPD violations
- 22
- DOB violations
- 14
- ECB violations
- 0
- HPD complaints
- 27
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling ceiling in the 1st room from east at north located at apt 2d, 2nd story, 1st apartment from east at south
Dec 12, 2024 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective inoperable electromagnetic locking device with heavy duty lock at door to building entrance at east , 1st story
Dec 12, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north located at apt 2d, 2nd story, 1st apartment from east at south
Dec 12, 2024 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at north located at apt 2d, 2nd story, 1st apartment from east at south
Dec 12, 2024 · Apt 2D
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 1st fire escape from north at east, 2nd story
Apr 24, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3d, 3rd story, 1st apartment from east at south
Mar 2, 2024 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 1st apartment from east at south
Mar 2, 2024 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door. at boiler room
Mar 2, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower sash window, 1st window from north at east in the 1st room from east at north located at apt 3d, 3rd story, 1st apartment from east at south
Mar 2, 2024 · Apt 3D
Open — Nov sent out
Show 12 more ↓
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Feb 29, 2024 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door looked at 1st boiler room from east
Feb 29, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Feb 29, 2024 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Feb 29, 2024 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east
Feb 27, 2024 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door. at boiler room
Feb 27, 2024
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Feb 23, 2024 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Feb 23, 2024 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked to cellar at public hall, 1st story
Feb 23, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective locking mechanism at door in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
Feb 23, 2024 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at entrance door leading to rear courtyard fire passageways at public hall, 1st story
Feb 23, 2024
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ***minimum 100 watts of incandescent light required.(fixture present)***
Jun 10, 2013
Open — Nov sent out
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Jan 10, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 2A
Close - Water leak
Heavy flow
Dec 30, 2024 · Apt 2D
Close - Heat/hot water
Apartment only
Dec 30, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Dec 14, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 7, 2024 · Apt 2A
Close - Water leak
Heavy flow
Dec 6, 2024 · Apt 2D
Close - Paint/plaster
Ceiling
Nov 23, 2024 · Apt 2D
Close - Water leak
Heavy flow
Nov 22, 2024 · Apt 2D
Close
Show 17 more ↓
- Heat/hot water
Entire building
Sep 27, 2024 · Apt 2D
Close - Heat/hot water
Apartment only
Sep 27, 2024 · Apt 2D
Close - Heat/hot water
Apartment only
Apr 23, 2024 · Apt 2D
Close - Heat/hot water
Apartment only
Apr 16, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Apr 15, 2024 · Apt 2D
Close - Heat/hot water
Entire building
Apr 15, 2024 · Apt 2B
Close - Heat/hot water
Apartment only
Apr 15, 2024 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 5, 2024 · Apt 2D
Close - Heat/hot water
Entire building
Mar 5, 2024 · Apt 1B
Close - Heat/hot water
Entire building
Mar 5, 2024 · Apt 1B
Close - Heat/hot water
Entire building
Mar 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 29, 2024 · Apt 3A
Close - Door/window
Door
Feb 26, 2024 · Apt 2D
Close - Door/window
Door
Feb 26, 2024 · Apt 2D
Close - Heat/hot water
Entire building
Feb 26, 2024 · Apt 2D
Close - Heat/hot water
Apartment only
Feb 21, 2024 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1930
- Floors
- 4
- Residential units
- 27
- Building area
- 21,120 ft²
- Lot area
- 6,500 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 3549 / 36
- Assessed value
- $792,450
- Landmark / historic district
- No
HPD registration #314903, last renewed Aug 25, 2025.
Questions about 184 Tapscott Street
Who owns 184 Tapscott Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Pact Preservation Partners LLC.
Does 184 Tapscott Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 184 Tapscott Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 184 Tapscott Street built?
City records list 1930 as the year it was built.
How many apartments are in 184 Tapscott Street?
It has 27 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.