roofy

296 Cooper Street

Brooklyn, NY 11237BBL 3-03443-0029Map

Owner of record: 296 Cooper LLC

296 Cooper Street is a walk-up apartment building built in 1906 in Brooklyn, 11237. It has 4 residential units across 2 floors. The owner of record is 296 Cooper LLC. HPD has recorded 63 housing violations here, most recently on May 18, 2026. 1 of the 50 most recent violations are still open.

HPD violations
63
DOB violations
1
ECB violations
5
HPD complaints
97

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 18, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 63

  • B

    Remove all encumbrances consisting of household items at public hall, 1st story

    May 18, 2026

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Sep 13, 2024

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq feet at ceiling. in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west original violation 17285323 issued 13-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 13, 2024 · Apt 2F

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq feet at ceiling. in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Sep 13, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at north located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at north located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west original violation 17209149 issued 20-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Aug 20, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 2nd story

    Aug 20, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective caulking at bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 2nd story, 1st apartment from south at west

    Aug 20, 2024 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at north wall at public hall, 2nd story

    Aug 20, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts all stories balconies stack at the front of the building at fire escape

    Oct 6, 2021

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration stair case erected breecheng 1st. story apartment to cellar. located at apt 1b

    Jun 20, 2021 · Apt 1B

    Open — Not complied with
  • C

    Code: arrange and make self-closing the doors in the entrance located at apt 1b, 1st story, 1st apartment from north at east

    Jun 20, 2021 · Apt 1B

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in drain at rear yard

    Jun 20, 2021

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system , at public hall, 1st story

    Jun 8, 2021

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box , at public hall, 1st story

    Jun 8, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk. at public hall, 1st story

    Jun 8, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 8, 2021

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jun 8, 2021

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jun 8, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 8, 2021

    Closed — Violation dismissed
  • C

    Code: arrange and make self-closing the doors , in the entrance located at apt 1b, 1st story, 1st apartment from east at south

    Jun 8, 2021 · Apt 1B

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story

    May 30, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 8, 2015

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1l, 1st story

    Dec 8, 2013 · Apt 1L

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1l, 1st story, apartment at east

    Dec 8, 2013 · Apt 1L

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective brick and mortar at the west wall at cellar

    Dec 8, 2013

    Closed — Violation closed
  • C

    Provide temporary seal-up of all accessible openings to vacant apartment 2nd sty at east

    Dec 8, 2013

    Closed — Violation dismissed
  • C

    Provide temporary seal-up of all accessible openings to vacant apartment 2nd sty at west

    Dec 8, 2013

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1l, 1st story, apartment at east

    Dec 8, 2013 · Apt 1L

    Closed — Violation closed
  • C

    Cleanse and disinfect to the satisfaction of this department after removing the accumulation of water sewer at cellar, 1st story

    May 8, 2013

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, apartment at west

    May 8, 2013 · Apt 1R

    Closed — Violation closed
  • A

    Replace with new the missing ceramic tiles at west wall in the bathroom located at apt 1l, 1st story, 1st apartment from north at east

    May 23, 2011 · Apt 1L

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1l, 1st story, 1st apartment from north at east

    Apr 27, 2011 · Apt 1L

    Closed — Violation closed
  • B

    Replace with new the missing saddle at door in the 2nd room from north located at apt 1l, 1st story, 1st apartment from north at east

    Apr 27, 2011 · Apt 1L

    Closed — Violation closed
  • B

    Properly secure the loose saddle at door in the bathroom located at apt 1l, 1st story, 1st apartment from north at east

    Apr 27, 2011 · Apt 1L

    Closed — Violation closed
  • B

    Repair or replace the smoke detector inoperable located at apt 1l, 1st story, 1st apartment from north at east

    Apr 27, 2011 · Apt 1L

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice located at apt 1l, 1st story, 1st apartment from north at east

    Apr 27, 2011 · Apt 1L

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from west at north wall, 1st door frame from south at west wall, 1st door from south at west wall in the 4th room from north located at apt 1l, 1st story, 1st apartment from north at east

    Apr 27, 2011 · Apt 1L

    Closed — Violation closed

DOB building violations · 1

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 2, 2014

    Dob violation - active

ECB violations · 5

  • Class - 3

    Faillure to maintain building and all parts thereof in a code-compliant manner. at time of inspection, observed rear yard drain clogged & inoperable. observed evidence of flooding & noted an increase in impervi

    Jun 24, 2021 · Penalty $250

    Resolve
  • Class - 1

    Electrical work w/o a permit.obs brance circuit wiring for fixtures outlets.switches panels feeders.service switches service entrance donductors installed in basement & thruout all floors.elect work in prog bra

    Apr 11, 2014 · Penalty $800

    Resolve
  • Class - 1

    Fail to ground electrical systems.servie switches not provided w/ground conductor.rem:provide grounding.

    Apr 11, 2014 · Penalty $4,800

    Active
  • Class - 2

    Work does not conform to approved construction documents and or amendments.noted:approved plans under job #320876860 au-2 with approval day 09/18/13 under derective 14 not conform to approved plans.@ cellar lev

    Apr 11, 2014 · Penalty $250

    Resolve
  • Non-hazardous

    Work without a permit. work noted. newly constructed steel frame/con- crete surfaced balcony measure 24'w x 10'l built at 2nd floor rear. remedy: obtain permit.

    Feb 16, 2007

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Apr 3, 2026 · Apt 2B

    Close
  • Water leak

    Slow leak

    Jul 19, 2024 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Jul 19, 2024 · Apt 2F

    Close
  • Water leak

    Heavy flow

    Jul 9, 2024 · Apt 2B

    Close
  • Water leak

    Heavy flow

    Jun 12, 2024 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Jun 12, 2024 · Apt 2B

    Close
  • Water leak

    Slow leak

    Jun 12, 2024 · Apt 2B

    Close
  • Water leak

    Heavy flow

    May 14, 2024 · Apt 2B

    Close
  • Water leak

    Slow leak

    May 14, 2024 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    May 14, 2024 · Apt 2B

    Close
Show 40 more ↓
  • Water leak

    Heavy flow

    Jan 9, 2024 · Apt 2B

    Close
  • Water leak

    Heavy flow

    Sep 6, 2023 · Apt 2B

    Close
  • Water leak

    Heavy flow

    Aug 13, 2023 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Feb 4, 2022 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jun 15, 2021 · Apt 1B

    Close
  • Unsanitary condition

    Sewage

    Jun 15, 2021 · Apt 1B

    Close
  • Unsanitary condition

    Sewage

    Jun 15, 2021 · Apt 1B

    Close
  • Plumbing

    Sewer

    Jun 10, 2021 · Apt 1B

    Close
  • Water leak

    Heavy flow

    Jun 3, 2021 · Apt 1B

    Close
  • Door/window

    Door

    Jan 8, 2018 · Apt 2B

    Close
  • Heating

    Heat related

    Dec 19, 2013 · Apt 1L

    Close
  • Heating

    Heat related

    Dec 17, 2013 · Apt 1L

    Close
  • Heating

    Heat related

    Dec 17, 2013 · Apt 1L

    Close
  • Heating

    Heat related

    Dec 13, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Dec 12, 2013 · Apt 1L

    Close
  • Heating

    Heat related

    Dec 5, 2013 · Apt 1L

    Close
  • Paint/plaster

    Wall

    Sep 12, 2013 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Sep 12, 2013 · Apt 2L

    Close
  • Electric

    Electric-supply

    Sep 12, 2013 · Apt 2L

    Close
  • Heating

    Heat related

    May 7, 2013 · Apt 1L

    Close
  • Heating

    Heat related

    May 6, 2013 · Apt 1L

    Close
  • Heating

    Heat related

    May 5, 2013 · Apt NA

    Close
  • Heating

    Heat related

    May 5, 2013 · Apt 1L

    Close
  • Heating

    Heat related

    May 2, 2013 · Apt 1R

    Close
  • Heating

    Heat related

    Apr 16, 2013 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    May 17, 2011 · Apt 1L

    Close
  • General

    Mold

    May 17, 2011 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    May 17, 2011 · Apt 1L

    Close
  • Plumbing

    Water-leaks

    May 17, 2011 · Apt 1L

    Close
  • Plumbing

    Water-leaks

    May 17, 2011 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    May 17, 2011 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Apr 20, 2011 · Apt 1L

    Close
  • General

    Ceramic-tile

    Apr 14, 2011 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Apr 14, 2011 · Apt 1L

    Close
  • Plumbing

    Water-leaks

    Apr 14, 2011 · Apt 1L

    Close
  • Heating

    Heat related

    Oct 5, 2010 · Apt 2R

    Close
  • Nonconst

    Vermin

    Sep 2, 2010 · Apt 2R

    Close
  • Nonconst

    Vermin

    Sep 2, 2010 · Apt 2R

    Close
  • Nonconst

    Vermin

    Nov 8, 2009 · Apt 2R

    Close
  • Nonconst

    Vermin

    Oct 14, 2009 · Apt 2R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1906
Floors
2
Residential units
4
Building area
3,416 ft²
Lot area
2,475 ft²
Zoning
M1-1
Community board
304
Council district
37
Block / lot
3443 / 29
Assessed value
$351,450
Landmark / historic district
No

HPD registration #358986, last renewed Sep 11, 2025.

Questions about 296 Cooper Street

Who owns 296 Cooper Street?

The owner of record in NYC Department of City Planning PLUTO data is 296 Cooper LLC.

Does 296 Cooper Street have violations?

Yes. NYC HPD has recorded 63 housing violations at this property.

Is 296 Cooper Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 296 Cooper Street built?

City records list 1906 as the year it was built.

How many apartments are in 296 Cooper Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.