88 Cooper Street
Brooklyn, NY 11207BBL 3-03439-0027Map
Owner of record: Foster, Grace Ann
88 Cooper Street is a two-family home built in 1901 in Brooklyn, 11207. It has 2 residential units across 3 floors. The owner of record is Foster, Grace Ann. HPD has recorded 65 housing violations here, most recently on January 2, 2004. 50 of the 50 most recent violations are still open.
- HPD violations
- 65
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 2
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- BHazardous
Remove all encumbrances consisting of radiator obstructing scutttle closet 3rd story public hall
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective metal ceiling at 2nd floor public hall
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric light ceiling fixture all rooms 2nd story apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the walls an d ceilings of center and rear west rooms 2nd story apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric light ceiling fixture of center room and kitchen 2nd story apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 2nd story public hall
Jan 2, 2004
Open — Nov sent out - ANon-hazardous
Replace with new the defective flush pipe of water closet 2nd story public hall
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood floor of bathroom 2nd story public hall
Jan 2, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass of window of front room west window 2nd story apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood treads 8th 9th and 10th treads from bottom front court stairs to 1st story vestibule
Jan 2, 2004
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective metal ceiling 2nd story public hall
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling of water closet compartment 1st story public hall
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling rear east room 2nd story apt
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in waste line tub bathroom 3rd story apt
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling 1st story public hall at center
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of concealed leak ceiling 1st story public hall center
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings of 2nd story apt
Jan 2, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings all rooms 2nd story apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective entrance door of water closet compartment 2nd story public hall
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color wall of public hall 1st to 2nd story
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric ceiling fixture of 2nd story bathroom
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls of bsmt and 1st story public halls
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls of public hall 2nd to 3rd story public halls
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective lock entrance door to bsmt from street
Jan 2, 2004
Open — Nov sent out - BHazardous
Replace with new the missing lock entrance door inner vestibule to bsmt public hall
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures 1 story apt 1 all fixtures
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Provide temporary seal all accessible openings to bldg
Jan 2, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling throughout 2nd floor apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of sheet metal at lower sash at kitchen window obstructing light 2nd floor apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin 2nd floor bathroom
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling at water closet compartment 2nd floor apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood floor at bathroom 2nd floor apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed leak at ceiling at bathroom 2nd floor apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Replace with new the missing door to south room 2nd floor apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric ceiling light fixture at 2nd floor apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric ceiling light fixture at 2nd floor public hall
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at 2nd floor public hall
Jan 2, 2004
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste lines at wash basin at bathroom 1st floor apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches at 2nd floor apt
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of double cylinder key operated lock to bldg street to vestibule
Jan 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wiring at ceiling at kitchen and center room bsmt floor
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood floor at kitchen throughout bsmt floor
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective sill at west window at kitchen bsmt floor
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective wall and ceiling at water closet compartment at bsmt floor
Jan 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wires at wall receptacle at bathroom bsmt floor
Jan 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed leak at ceiling of bathroom 1st floor apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Replace with new the missing casing at rear room and bathroom window window 1st floor apt
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Replace with new the missing water closet bowl water closet compartment 1st story public hall
Jan 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wires at ceiling front room and south room 1st floor apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color wall at rear room 1st f loor
Jan 2, 2004
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Heating
Heat related
Dec 6, 2010 · Apt 3D
Close - Heating
Heat related
Mar 18, 2004 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1901
- Floors
- 3
- Residential units
- 2
- Building area
- 2,475 ft²
- Lot area
- 1,833 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3439 / 27
- Assessed value
- $82,140
- Landmark / historic district
- No
Questions about 88 Cooper Street
Who owns 88 Cooper Street?
The owner of record in NYC Department of City Planning PLUTO data is Foster, Grace Ann.
Does 88 Cooper Street have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 88 Cooper Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 88 Cooper Street built?
City records list 1901 as the year it was built.
How many apartments are in 88 Cooper Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.