165 Cooper Street
Brooklyn, NY 11207BBL 3-03435-0052Map
Owner of record: 165 Cooper LLC
165 Cooper Street is a walk-up apartment building built in 1906 in Brooklyn, 11207. It has 6 residential units across 3 floors. The owner of record is 165 Cooper LLC. HPD has recorded 18 housing violations here, most recently on April 8, 2021. 15 of the 18 most recent violations are still open.
- HPD violations
- 18
- DOB violations
- 24
- ECB violations
- 9
- HPD complaints
- 52
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
Jun 1, 2018
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required (light fixtures present)
Aug 29, 2015
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective masonary and ceramic tiled floor in the bathroom located at apt 3r, 3rd story, apartment at east
Jan 13, 2012 · Apt 3R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north and west walls 4 square feet in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Apr 15, 2011 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door. at boiler room
Dec 15, 2010
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, apartment at east
Sep 25, 2010 · Apt 3R
Open — Nov certified late - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Jul 28, 2010 · Apt 3R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed water leak at ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from south at west
Dec 6, 2004 · Apt 1L
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Dec 6, 2004 · Apt 1L
Open — First no access to re- inspect violation
Show 8 more ↓
- BHazardous
Properly repair with similar material the broken or defective sheetrock ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from south at west
Dec 6, 2004 · Apt 1L
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Dec 6, 2004 · Apt 1L
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective bell system bldg front to 1 sty west apt 1l , section '' ''
Dec 16, 1997 · Apt 1L
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective mortise lock rear entrance door 1 sty west apt 1l , section '' ''
Dec 16, 1997 · Apt 1L
Open — First no access to re- inspect violation - BHazardous
Replace or repair the self-closing doors that is missing or defective entrance boiler cellar.
Sep 17, 1990
Open — Not complied with - BHazardous
M/d law abate the nuisance consisting of extension cord at wall adjacent to gas range 1 sty apt 1l , section '' ''
Apr 26, 1989 · Apt 1L
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling installed thru out 3 sty east apt 3r. located at apt 3r
Apr 19, 1989 · Apt 3R
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dumbwaiter doors sealed all stys public hall & cellar.
Apr 19, 1989
Open — Nov sent out
DOB building violations · 24
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 20, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 20, 2011
Dob violation - dismissed
Show 14 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 20, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 20, 2011
Dob violation - dismissed - Construction other optional
The borough commissioner has issued a 15 day letter of intent to revok e appl3320093439 on 8-10-10 unable to determine % of work completed remedy; stop all work, make sitesafe contact dob
Aug 13, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 9
- Class - 2
Failure to provide approved/accepted plans @ job site @ time of insp. note: permit# 320080265 obtain for interior renovation of existing bldg. work in progress @ basement 1st & 2nd flrs w/ no approved plans @ s
Apr 11, 2017 · Penalty $250
Resolve - Class - 2
Note floor beams at 3rd fl btrm rotten sagging and improperly supported permit #320402319 obtain on 9/15/11 to install temporary showing to 3rd btrm at 2nd fl no work done to provide support to btrm fl joist re
Jan 12, 2012 · Penalty $250
Resolve - Class - 2
Failure to comply w/ the comm order to file a cert of correction w/ the dob for nov#34897456z issued on 01/29/11 pursuant to 28-204.4 & 1rcny 102-01 rem: file a cert of correction
Jul 15, 2011
Resolve - Class - 2
Failure to comply w/ the comm order to file a cert of correction w/ the dob for nov#34897456z issued on 01/29/11 pursuant to 28-204.4 & 1rcny 102-01 rem: file a cert of correction 34897455r issued on 1/29/11
Jul 15, 2011 · Penalty $800
Resolve - Class - 2
Failure to file cofc for vio#34897457k.rem:file cofc
May 12, 2011 · Penalty $800
Resolve - Class - 1
Work does not conform to approved construction documents. note: alt #320080265-01. issued 1/6/10 indicates that (50%) order of the building will not be demolishes,contrary to this filing the interior has been
Jan 29, 2011 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code-complaint manner. note: an occupied multiple dwelling has all interior walls,ceilings partitions,windows,doors & fire stopping missing/removed building. (except 1 occupied apt
Jan 29, 2011
Resolve - Class - 1
Failure to maintain bldg in code-complaint manner,no fire stopping. noted: all interior doors,walls,ceilings,partitions & fire stopping removed throughout 3 story multiple dwelling (save for 1 apt on 3rd floor
Jan 29, 2011 · Penalty $1,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations/job #370080265 note: all interior walls & ceilings,finish surfaces,exterior windows/interior doors & fire stopping removed from
Jan 29, 2011 · Penalty $2,400
Resolve
Complaints
- Water leak
Slow leak
Nov 23, 2023 · Apt 3R
Close - Heating
Heat related
Feb 10, 2013 · Apt 3R
Close - General
Floor
Jan 12, 2012 · Apt 3R
Close - Nonconst
Vermin
Apr 13, 2011 · Apt 3R
Close - Nonconst
Vermin
Apr 13, 2011 · Apt 3R
Close - General
Mold
Apr 13, 2011 · Apt 3R
Close - General
Stairs
Apr 13, 2011 · Apt 3R
Close - General
Windows
Apr 13, 2011 · Apt 3R
Close - Plumbing
Water supply
Jan 23, 2011 · Apt 3R
Close - Heating
Heat related
Dec 9, 2010 · Apt 3R
Close
Show 40 more ↓
- Heating
Heat related
Oct 16, 2010 · Apt 3R
Close - Heating
Heat related
Sep 23, 2010 · Apt 3R
Close - General
Locks
Jul 26, 2010 · Apt 3R
Close - Plumbing
Water-leaks
Jul 26, 2010 · Apt 3R
Close - Plumbing
Water supply
Jul 26, 2010 · Apt 3R
Close - General
Mold
Jul 26, 2010 · Apt 3R
Close - Plumbing
Water-leaks
Jul 26, 2010 · Apt 3R
Close - General
Locks
Jul 26, 2010 · Apt 3R
Close - General
Windows
Jul 26, 2010 · Apt 3R
Close - Paint/plaster
Wall
Jul 26, 2010 · Apt 3R
Close - General
Floor
Jul 26, 2010 · Apt 3R
Close - Paint/plaster
Ceiling
Jul 26, 2010 · Apt 3R
Close - Heating
Heat related
Apr 10, 2010 · Apt 3R
Close - Heating
Heat related
Mar 8, 2010 · Apt 3R
Close - Heating
Heat related
Nov 30, 2009 · Apt 3R
Close - Heating
Heat related
Nov 12, 2009 · Apt 3R
Close - Heating
Heat related
Oct 16, 2009 · Apt 3R
Close - Heating
Heat related
Dec 5, 2008 · Apt 2L
Close - Heating
Heat related
Dec 5, 2008 · Apt 1L
Close - Heating
Heat related
Oct 22, 2008 · Apt 1L
Close - Heating
Heat related
Jul 2, 2008 · Apt 1L
Close - Heating
Heat related
Jul 2, 2008 · Apt 1L
Close - General
Windows
Jul 2, 2008 · Apt 1L
Close - Plumbing
Toilet
Jul 2, 2008 · Apt 1L
Close - Heating
Heat related
Feb 20, 2008 · Apt 1L
Close - Nonconst
Vermin
Feb 2, 2008 · Apt 1L
Close - Plumbing
Radiator
Feb 2, 2008 · Apt 1L
Close - Paint/plaster
Ceiling
Feb 2, 2008 · Apt 1L
Close - Paint/plaster
Ceiling
Feb 2, 2008 · Apt 1L
Close - Plumbing
Water-leaks
Feb 2, 2008 · Apt 1L
Close - Paint/plaster
Ceiling
Feb 2, 2008 · Apt 1L
Close - Paint/plaster
Ceiling
Feb 2, 2008 · Apt 1L
Close - Plumbing
Water-leaks
Feb 2, 2008 · Apt 1L
Close - Heating
Heat related
Nov 8, 2007 · Apt 1L
Close - Heating
Heat related
Jan 26, 2007 · Apt 1L
Close - Heating
Heat related
Jan 11, 2007 · Apt 3L
Close - Nonconst
Vermin
Apr 13, 2006 · Apt 3R
Close - Plumbing
Water-leaks
Dec 28, 2005 · Apt 2L
Close - Heating
Heat related
Dec 3, 2005 · Apt 2R
Close - Plumbing
Water-leaks
Nov 14, 2004 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1906
- Floors
- 3
- Residential units
- 6
- Building area
- 5,025 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3435 / 52
- Assessed value
- $517,050
- Landmark / historic district
- No
HPD registration #344661, last renewed Aug 7, 2025.
Questions about 165 Cooper Street
Who owns 165 Cooper Street?
The owner of record in NYC Department of City Planning PLUTO data is 165 Cooper LLC.
Does 165 Cooper Street have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 165 Cooper Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 165 Cooper Street built?
City records list 1906 as the year it was built.
How many apartments are in 165 Cooper Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.