109 Cooper Street
Brooklyn, NY 11207BBL 3-03434-0059Map
Owner of record: Tinoco, Rosita
109 Cooper Street is a two-family home built in 1899 in Brooklyn, 11207. It has 2 residential units across 2 floors. The owner of record is Tinoco, Rosita. HPD has recorded 44 housing violations here, most recently on March 24, 2016. 42 of the 44 most recent violations are still open.
- HPD violations
- 44
- DOB violations
- 0
- ECB violations
- 4
- HPD complaints
- 6
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 44
- CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures throughout located at apt 1, 1st story, apartment at north
Mar 24, 2016 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the private hallway located at apt 1, 1st story, apartment at north
Mar 24, 2016 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, apartment at north
Mar 24, 2016 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 2nd story
Jun 22, 2014 · Apt 3
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 2nd story
Jun 22, 2014 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story
Jun 11, 2014 · Apt 2
Closed — Violation dismissed - BHazardous
Replace with new the missing locking device entrance 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor at kitchen 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Provide hot water at all hot water fixtures kitchen and bathroom sink 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line under kitchen sink 2nd story apt 2
Jan 2, 2004
Open — Nov sent out
Show 34 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls throughout 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wire throughout 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective light fixture ceiling 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling 2nd room front rear 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet bathroom 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet bathroom 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste pipe wash basin bathroom 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in kitchen sink 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood floor kitchen and north west room 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective metal ceiling kitchen 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls kitchen 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches kitchen and bathroom 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling southeast room and center room 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - ANon-hazardous
Refit entrance door 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture southwest room 2nd story apt 2
Jan 2, 2004
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of concealed ceiling water leak bathroom bsmt apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor bathroom bsmt apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile walls bathroom bsmt apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches bsmt apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling throughout bsmt apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor kitchen bsmt apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Replace with new the missing rear entrance door bsmt apt
Jan 2, 2004
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Jan 2, 2004
Open — Nov sent out - BHazardous
Section 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy
Jul 20, 2003 · Apt BLDG
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at kitchen and bathroom located at apt bsmt
Jul 20, 2003 · Apt BSMT
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible at kitchen located at apt bsmt
Jul 20, 2003 · Apt BSMT
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at exit door to rear yard in the kitchen located at apt bsmt
Jul 20, 2003 · Apt BSMT
Open — Nov sent out - BHazardous
The premises vacated by this department, have been reoccupied without obtaining required approval basement, 1st and 2nd sty
Nov 7, 2002
Open — First no access to re- inspect violation - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at basement.
Nov 3, 2002 · Apt BLDG
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible at basement.
Nov 3, 2002 · Apt BLDG
Open — Nov sent out - BHazardous
Section 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy
Nov 3, 2002 · Apt BLDG
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at entrance door to building at front areaway
Oct 21, 2002
Open — Nov sent out - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for 1st and 2nd sty b rooms
Jul 9, 2001 · Apt BLDG
Open — First no access to re- inspect violation
DOB building violations · 0
No DOB violations on record
ECB violations · 4
- Hazardous
Occupancy contrary to that allowed by the certificate of occupancy or bldg dept records basement changed from ordinary use apartment partitins have been erected kitchen bathroom facilities have been installed
Jul 20, 2003 · Penalty $2,500
Active - Non-hazardous
Work w/o a permit. noted partitions erected in the basement creating (2) bedroom (1) living room (1) kitchen with gas stove and refridgeratir and (1) three piece bathroom remedy : obtian permit
Jun 21, 2002
Resolve - Non-hazardous
Occupancy contrary to that allowed by the building dept records. partitions erected in the basement creating (1) kitchen with gas stove and refridgerator 2 bedrooms (1) three piece bathroom and one living room,
Jun 21, 2002 · Penalty $800
Active - Non-hazardous
Work without a permit. creating housing rooms at bsmt. 2 rooms 1st floor 4 rooms 2 floor 5 room. wooden partitions have been erected to create these rooms. remedy: vacate bldj & restore to legal occupancy.
Jul 6, 2001 · Penalty $800
Active
Complaints
- Electric
Power outage
Mar 23, 2016 · Apt 1
Close - Water leak
Slow leak
Mar 23, 2016 · Apt 1
Close - Heat/hot water
Entire building
Jun 19, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 16, 2014 · Apt 3
Close - Heat/hot water
Entire building
Jun 9, 2014 · Apt 2
Close - Nonconst
Illegal
Jul 20, 2003 · Apt BLDG.
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jul 2, 2026 | Non-market transfer | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B2)
- Year built
- 1899
- Floors
- 2
- Residential units
- 2
- Building area
- 2,925 ft²
- Lot area
- 1,950 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3434 / 59
- Assessed value
- $114,900
- Landmark / historic district
- No
Questions about 109 Cooper Street
Who owns 109 Cooper Street?
The owner of record in NYC Department of City Planning PLUTO data is Tinoco, Rosita.
Does 109 Cooper Street have violations?
Yes. NYC HPD has recorded 44 housing violations at this property.
Is 109 Cooper Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 109 Cooper Street built?
City records list 1899 as the year it was built.
How many apartments are in 109 Cooper Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.