roofy

1050 Decatur Street

Brooklyn, NY 11207BBL 3-03433-0013Map

Owner of record: 1050 Decatur LLC

1050 Decatur Street is a walk-up apartment building built in 1906 in Brooklyn, 11207. It has 6 residential units across 3 floors. The owner of record is 1050 Decatur LLC. HPD has recorded 33 housing violations here, most recently on May 4, 2026.

HPD violations
33
DOB violations
12
ECB violations
5
HPD complaints
66

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 33

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 9, 2025

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hotwater fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east

    Jan 17, 2025 · Apt 2L

    Closed — Violation closed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the 1st room from north at east located at apt 2l, 2nd story, 1st apartment from north at east

    Jan 17, 2025 · Apt 2L

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    May 30, 2024

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing kickstand doorstop installed at building entrance door , 1st story

    May 30, 2024

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 22, 2023

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of hasp with padlockable eye at scuttle hatch at public hall, 3rd story

    Feb 9, 2023

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Feb 9, 2023

    Closed — Violation dismissed
Show 23 more ↓
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 24, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 8, 2021

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective stucco covering exposing wood studs at north exterior wall yard

    Dec 28, 2015

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective bricks and mortar at east exterior wall , 1st story

    Jul 24, 2015

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls in the bathroom located at apt 1r, 1st story

    Jul 21, 2015 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceromic floor tiles in the bathroom located at apt 1r, 1st story

    Jul 21, 2015 · Apt 1R

    Closed — Violation closed
  • B

    Replace with new the broken or defective base cabinet in the kitchen located at apt 1r, 1st story

    Jul 21, 2015 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling in the kitchen located at apt 1r, 1st story

    Jul 21, 2015 · Apt 1R

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 1l, 1st story, 1st apartment from north at east

    Mar 25, 2014 · Apt 1L

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; located at apt 1l, 1st story, 1st apartment from north at east

    Mar 25, 2014 · Apt 1L

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1l, 1st story, 1st apartment from north at east

    Mar 25, 2014 · Apt 1L

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1r, 1st story, apartment at west

    Mar 31, 2010 · Apt 1R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at public hall, 1st story

    Mar 2, 2010

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the bathroom , the 3rd room from north, the private hallway located at apt 1l, 1st story, 1st apartment from north at east

    Feb 9, 2009 · Apt 1L

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door from south at west wall, 2nd riser from west at north wall, 1st riser from east at south wall, north wall, south wall, west wall in the kitchen located at apt 1l, 1st story, 1st apartment from north at east

    Feb 9, 2009 · Apt 1L

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, 1st door from east at south wall, south wall, 1st door from south at west wall, west wall, north wall, east wall in the 1st room from north located at apt 1l, 1st story, 1st apartment from north at east

    Feb 9, 2009 · Apt 1L

    Closed — Violation closed
  • A

    § 213, subd. 5 m/d law discontinue use of interior room for living or provide a single opening of at least 60 percent of area of the partition to room having window opening directly to street or yard at north wall at north two room in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east

    Feb 9, 2009 · Apt 1L

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east

    Feb 4, 2009 · Apt 1L

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system .. at boiler room, cellar

    Nov 19, 2003

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall

    Nov 19, 2003

    Closed — Violation closed
  • C

    D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system 1 sty pub hall & on boiler room door.

    Aug 19, 1987

    Closed — Violation closed
  • A

    D26-10.01 adm code replace with new the missing balusters 2 to 3 sty pub hall.

    Aug 19, 1987

    Closed — Violation closed
  • A

    D26-21.03 adm code paint or post a sign indicating floors on wall near stairs all stys public hall.

    Aug 19, 1987

    Closed — Violation closed

DOB building violations · 12

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 3, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 11, 2015

    Dob violation - dismissed
Show 2 more ↓
  • Construction other optional

    Failed to mtn 3story + cellar. resident, wd frm, flt roof w structural defects: 1)area of 15x10 btwn 1st&2nd fl side ext. stucco wall colaspd into adj. n garden 2)wall studs exposed 3)mason wall fell into garden 4)bulg n. exter. wall @ 7 locat.b& zone matching 2nd fl joists

    Dec 19, 2014

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Full vacate

    Dec 11, 2014

    Dob violation - dismissed

ECB violations · 5

  • Class - 2

    Sec: 3307.6.5.11. failure to notify dept of removal of sidewalk shed. rem: time of insp observed no sidewalk shed in place. rem: comply w/ code. notify dept 212-393-2550.

    Aug 30, 2017 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #35111434r issued on 3/12/15 pursuant to 28-204.4 & 1rcny 102-01. no c of c or any other permits to correct violation conditions

    Apr 25, 2015 · Penalty $2,000

    Resolve
  • Class - 1

    Failure to maintain bldg walls or appurtenances.noted:exterior bldg wall exposure 2 at 1st fl level lounge section missing cracked & defective section approx 10ft high by 10ft wide pieces falling into adjacent

    Mar 12, 2015 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #35117199n issued on 12/9/14 pursuant to 28-204.4 & 1rcny 102-01. failure to maintain bldg exterior wall collapsed remaining wal

    Jan 31, 2015 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain bldg walls:noted @ exp(2)front section of exteriormasonry wall has separated & collapsed an approx 15'x15' section collapsed into adjacent open lot.remaining section are bulging & appear to

    Dec 9, 2014 · Penalty $1,000

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Jan 22, 2025 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2025 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2025 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2025 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Jan 14, 2025 · Apt 2L

    Close
  • Electric

    Power outage

    Oct 7, 2024 · Apt 2L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 6, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jul 26, 2021 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Jul 26, 2021 · Apt 1R

    Close
  • Water leak

    Slow leak

    Jul 26, 2021 · Apt 1R

    Close
Show 40 more ↓
  • Plumbing

    Sewer

    Jun 25, 2019 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Feb 8, 2019 · Apt 1R

    Close
  • Water leak

    Slow leak

    Feb 8, 2019 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Oct 18, 2018 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Jan 27, 2016 · Apt BLDG

    Close
  • Outside building

    Roofing

    Jan 27, 2016 · Apt BLDG

    Close
  • Outside building

    Gutter/leader

    Jul 24, 2015 · Apt YY

    Close
  • Paint/plaster

    Wall

    Jul 17, 2015 · Apt 1R

    Close
  • General

    Cabinet

    Jul 17, 2015 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Jul 17, 2015 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    Jul 17, 2015 · Apt 1R

    Close
  • Plumbing

    Water supply

    Feb 19, 2015 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2015 · Apt 1R

    Close
  • General

    Cooking gas

    Feb 19, 2015 · Apt 1R

    Close
  • Electric

    Power outage

    Feb 19, 2015 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Feb 14, 2015 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Sep 11, 2014 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    Aug 26, 2014 · Apt 1L

    Close
  • Water leak

    Slow leak

    Mar 19, 2014 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    Mar 19, 2014 · Apt 1L

    Close
  • Heating

    Heat related

    Dec 4, 2012 · Apt NA

    Close
  • Nonconst

    Carbon monoxide

    Mar 26, 2010 · Apt 1R

    Close
  • Nonconst

    Smoke detector

    Mar 26, 2010 · Apt 1R

    Close
  • Heating

    Heat related

    Mar 26, 2010 · Apt 1R

    Close
  • Heating

    Heat related

    Feb 25, 2010 · Apt 1R

    Close
  • Heating

    Heat related

    Jan 6, 2010 · Apt 1R

    Close
  • Heating

    Heat related

    Jan 30, 2009 · Apt 1L

    Close
  • Heating

    Heat related

    Jan 26, 2009 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 25, 2009 · Apt 1L

    Close
  • Heating

    Heat related

    Jan 16, 2009 · Apt 1L

    Close
  • Heating

    Heat related

    Jan 18, 2007 · Apt 1L

    Close
  • Heating

    Heat related

    Dec 4, 2006 · Apt 1L

    Close
  • Heating

    Heat related

    Dec 4, 2006 · Apt 1L

    Close
  • Heating

    Heat related

    Dec 26, 2005 · Apt 1L

    Close
  • Heating

    Heat related

    Dec 10, 2003 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 6, 2003 · Apt 1L

    Close
  • Heating

    Heat related

    Nov 30, 2003 · Apt 1L

    Close
  • Heating

    Heat related

    Nov 28, 2003 · Apt 1L

    Close
  • Heating

    Heat related

    Nov 17, 2003 · Apt 1L

    Close
  • Heating

    Heat related

    Nov 17, 2003 · Apt 1L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1906
Floors
3
Residential units
6
Building area
4,725 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3433 / 13
Assessed value
$602,100
Landmark / historic district
No

HPD registration #358367, last renewed Aug 25, 2025.

Questions about 1050 Decatur Street

Who owns 1050 Decatur Street?

The owner of record in NYC Department of City Planning PLUTO data is 1050 Decatur LLC.

Does 1050 Decatur Street have violations?

Yes. NYC HPD has recorded 33 housing violations at this property.

Is 1050 Decatur Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1050 Decatur Street built?

City records list 1906 as the year it was built.

How many apartments are in 1050 Decatur Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.