299 Schaefer Street
Brooklyn, NY 11237BBL 3-03425-0036Map
Owner of record: 299 Schaefer LLC
299 Schaefer Street is a walk-up apartment building built in 1906 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 299 Schaefer LLC. HPD has recorded 54 housing violations here, most recently on May 4, 2026. 38 of the 50 most recent violations are still open.
- HPD violations
- 54
- DOB violations
- 0
- ECB violations
- 4
- HPD complaints
- 87
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 54
- CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tile at public hall, 1st story
May 4, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective bulging stucco at 3rd story at east exterior wall of the building.
Mar 9, 2020
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vertical crack extending from 1st floor to 3rd stopy at east exterior wall of the building.
Mar 9, 2020
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment .. in the entire apartment located at apt 1r, 1st story, apartment at north
Feb 26, 2020 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Feb 22, 2020
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective bulging stucco at 3rd story at east exterior wall of the building
Feb 22, 2020
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective vertical crack extending from 1st to 3rd story at east exterior wall of the building.
Feb 22, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jan 30, 2020
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at the first story public hall
Jan 30, 2020
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 30, 2020
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment .... in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Jan 30, 2020 · Apt 3F
Open — First no access to re- inspect violation - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ...... in the entire apartment located at apt 1f, 1st story, 2nd apartment from west at north
Jan 30, 2020 · Apt 1F
Open — First no access to re- inspect violation - CImmediately hazardous
Arrange and make self-closing the doors , in the entrance located at apt 3f, 3rd story, 1st apartment from east at south
Dec 28, 2019 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Dec 28, 2019 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Dec 28, 2019 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting slide bolt capable to being padlocked installed at door to roof at bulkhead , 3rd story
Dec 28, 2019
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 4th room from north at west located at apt 3f, 3rd story, 1st apartment from east at south
Dec 28, 2019 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from north at west located at apt 3f, 3rd story, 1st apartment from east at south
Dec 28, 2019 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Dec 10, 2019
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Aug 21, 2014
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors at all stories at public hall
Aug 21, 2014
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 21, 2014
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Aug 21, 2014
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Aug 21, 2014
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 21, 2014
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner
May 16, 2011 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story, 2nd apartment from north at east
Jan 21, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1f, 1st story
Jan 21, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1f, 1st story
Jan 21, 2009 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3f, 3rd story
Jan 21, 2009 · Apt 3F
Open — Nov sent out - BHazardous
Discontinue use of illegal space and/or hot water heater and provide filed for & approved heater which obtains combustion air directly from outside the building or approved central system at north 3 and north 4 room located at apt 1f, 1st story, 2nd apartment from north at east
Jan 21, 2009 · Apt 1F
Open — Nov sent out - BHazardous
Discontinue use of illegal space and/or hot water heater and provide filed for & approved heater which obtains combustion air directly from outside the building or approved central system .... in the entire apartment located at apt 3f, 3rd story, apartment at south
Jan 21, 2009 · Apt 3F
Open — Nov sent out - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway : chain with pad lock at gate at north/east section at front of building
Oct 3, 2008
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electric wiring from ceiling fixture to switch at south wall located at apt 2r, 2nd story, 1st apartment from north at east
Oct 3, 2008 · Apt 2R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of electric extension wire from foyer to kitchen electric outlet at west wall located at apt 2r, 2nd story, 1st apartment from north at east
Oct 3, 2008 · Apt 2R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Oct 3, 2008 · Apt 2R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of evidence of moisture penetration at ceiling and south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Oct 3, 2008 · Apt 2R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electric wiring at ceiling in the foyer located at apt 2r, 2nd story, 1st apartment from north at east
Oct 3, 2008 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the 1st room from north at east, the foyer , the kitchen , the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Oct 3, 2008 · Apt 2R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of truck parked east yard
Jul 17, 2008
Open — Nov sent out - BHazardous
Fire egress defective. restore egress by removing locking device and arrange to open readily the gate in fence at lot line east yard
Jul 17, 2008
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard
Jul 17, 2008
Open — Nov sent out - BHazardous
Code: arrange and make self-closing the doors west entrance in the foyer located at apt 1r, 1st story, 1st apartment from north at east
Dec 9, 2007 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair the broken or defective bell/buzzer/intercom system at entire apartment, 1st story, apartment
Dec 9, 2007 · Apt 1R
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories front at fire escape
Sep 27, 2007
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , west wall, south wall in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Sep 20, 2005 · Apt 2F
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation ; 1st radiator from east at south wall in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from west at north
Sep 20, 2005 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ; east wall, ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Sep 20, 2005 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , 1st door frame from north at east wall, 1st door from north at east wall, 1st window frame from south at west wall, baseboard at south wall in the 3rd room from east at south located at apt 1r, 1st story, 1st apartment from west at north
Sep 20, 2005 · Apt 1R
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 4
- Class - 1
Work w/o permit. observe in apt's 1f,3f w/o permit installed "rinnai" gas space heaters & new gas piping through apt's. existing radiators in bathroom & kitchen disconnected (prohibited hard pipes require). gas
Feb 10, 2009 · Penalty $8,000
Active - Class - 1
Work w.o permit. observed (3) three heating units at apt 1r. no records on file w/the dob for installation. remedy: obtain permit or restorepremises to prior legal condition.
Dec 15, 2008 · Penalty $8,000
Active - Hazardous
Fail t maintain ext.drain leader defect noted:@ rear brick wall bldg found to b defect.broken w. openin&rotten elbow above 3rd stry@ parapet wall.rear yrd buckled struct.steel lintel above entry to bldg @1stry
Jan 24, 2008 · Penalty $800
Active - Non-hazardous
Exit pasgwy or public hall req.width decreased by obst noted:storage or discarted frig w.door intact @ public hallwy 3stry in front of stair use to access roof bulkhead for exit at primary means of egress also
Jan 24, 2008 · Penalty $350
Active
Complaints
- Appliance
Electric/gas range
Apr 24, 2026 · Apt 1R
Close - Unsanitary condition
Mold
Apr 24, 2026 · Apt 1R
Close - Water leak
Slow leak
Jun 21, 2021 · Apt 1R
Close - Unsanitary condition
Mold
Jun 21, 2021 · Apt 1R
Close - Paint/plaster
Ceiling
Jun 21, 2021 · Apt 1R
Close - Paint/plaster
Ceiling
Dec 16, 2019 · Apt 1R
Close - Paint/plaster
Wall
Dec 16, 2019 · Apt 3F
Close - Paint/plaster
Ceiling
Dec 16, 2019 · Apt 3F
Close - Paint/plaster
Window/frame
Dec 16, 2019 · Apt 3F
Close - Appliance
Electric/gas range
May 2, 2017 · Apt 3F
Close
Show 40 more ↓
- Paint/plaster
Wall
May 2, 2017 · Apt 3F
Close - Door/window
Window frame
May 2, 2017 · Apt 3F
Close - Door/window
Window frame
May 2, 2017 · Apt 3F
Close - Door/window
Window pane
May 2, 2017 · Apt 3F
Close - Unsanitary condition
Pests
Jul 7, 2016 · Apt 3F
Close - Heat/hot water
Entire building
Aug 22, 2014 · Apt BLDG
Close - Heat/hot water
Apartment only
Aug 18, 2014 · Apt 1F
Close - Heat/hot water
Apartment only
Aug 15, 2014 · Apt 1F
Close - General
Mold
Feb 23, 2012 · Apt 3R
Close - Plumbing
Toilet
Jul 3, 2011 · Apt 1F
Close - Paint/plaster
Ceiling
Jul 3, 2011 · Apt 1F
Close - Heating
Heat related
Jan 15, 2009 · Apt 1F
Close - General
Mold
Oct 1, 2008 · Apt 2R
Close - General
Floor
Oct 1, 2008 · Apt 2R
Close - General
Floor
Oct 1, 2008 · Apt 2R
Close - General
Floor
Oct 1, 2008 · Apt 2R
Close - Electric
Wiring
Oct 1, 2008 · Apt 2R
Close - Electric
Electric-supply
Jun 9, 2008 · Apt 3F
Close - Paint/plaster
Wall
Mar 19, 2008 · Apt 1R
Close - General
Floor
Mar 19, 2008 · Apt 1R
Close - General
Doors
Mar 19, 2008 · Apt 1R
Close - General
Doors
Dec 5, 2007 · Apt 1R
Close - General
Windows
Dec 5, 2007 · Apt 1R
Close - Electric
Bell-buzzer/intercom
Dec 5, 2007 · Apt 1R
Close - General
Doors
Dec 5, 2007 · Apt 1R
Close - Plumbing
Water-leaks
Dec 5, 2007 · Apt 1R
Close - General
Mold
Dec 5, 2007 · Apt 1R
Close - Plumbing
Sewer
Dec 5, 2007 · Apt 1R
Close - General
Cabinet
Dec 5, 2007 · Apt 1R
Close - Plumbing
Toilet
Dec 5, 2007 · Apt 1R
Close - Plumbing
Basin/sink
Dec 5, 2007 · Apt 1R
Close - Plumbing
Radiator
Dec 5, 2007 · Apt 1R
Close - Appliance
Refrigerator
Dec 5, 2007 · Apt 1R
Close - General
Cabinet
Dec 5, 2007 · Apt 1R
Close - Electric
Lighting
Dec 5, 2007 · Apt 1R
Close - Nonconst
Vermin
Dec 5, 2007 · Apt 1R
Close - Nonconst
Vermin
Dec 5, 2007 · Apt 1R
Close - Paint/plaster
Wall
Dec 5, 2007 · Apt 1R
Close - Nonconst
Rubbish
Dec 5, 2007 · Apt 1R
Close - Plumbing
Water-leaks
Nov 21, 2007 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1906
- Floors
- 3
- Residential units
- 6
- Building area
- 4,305 ft²
- Lot area
- 2,550 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3425 / 36
- Assessed value
- $415,800
- Landmark / historic district
- No
HPD registration #324615, last renewed Aug 25, 2025.
Questions about 299 Schaefer Street
Who owns 299 Schaefer Street?
The owner of record in NYC Department of City Planning PLUTO data is 299 Schaefer LLC.
Does 299 Schaefer Street have violations?
Yes. NYC HPD has recorded 54 housing violations at this property.
Is 299 Schaefer Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 299 Schaefer Street built?
City records list 1906 as the year it was built.
How many apartments are in 299 Schaefer Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.